Draft v1.0 prepared by NEER. Not adopted by the Government of Arunachal Pradesh or any authority, local body or community, and has no legal force. About this draft

Chapter 1Policy, Applicability and Adoption


1.1 Purpose and objectives

1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Arunachal Pradesh. It applies to private development and to public works, as set out in Clause 1.5.

1.1.2 The Manual has the following objectives:

  • (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
  • (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
  • (c) to size storage for the long-duration storms of the monsoon season, which fall for days on the hills and the foothills together, saturating the Siwalik slopes and raising the Dikrong, the Siang, the Lohit and the Noa-Dihing against the town drains (by 20 July 2026 the season had brought 173 landslides, 104 floods and 8 flash floods, as quoted in the press from the Department of Disaster Management), from the pre-monsoon storms of April and May to the October storms of the east, as well as for short-duration intensities;
  • (d) to design outfalls for the streams, nallahs, rivers and reservoirs into which the towns drain: the steep streams and nallahs of the hill towns and of the hill slopes round Itanagar, which rise within the hour and carry slide debris to free outfalls; the capital's nallahs to the Senki, the Pachin and the Dikrong, which the Dikrong backs up when it carries the releases of the Pare dam and the tailrace of the Ranganadi project; the main stems at Pasighat, Tezu and Namsai, the Siang, the Lohit and the Noa-Dihing, whose stage is set upstream, at Pasighat by outbursts in Tibet; and the reaches below the Pare, Ranganadi, Kameng and Lower Subansiri projects, held and released by their operators, including the case where the outfall is closed;
  • (e) to protect tanks (ponds), marshes, rivers, supply channels and surplus courses as part of the drainage system;
  • (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
  • (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
  • (h) to make sure that facilities, once built, are maintained and remain effective.

1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the building bye-laws issued by the Department of Town Planning and ULBs, Government of Arunachal Pradesh, which extend to the whole State (the Arunachal Pradesh Building Bye-Laws, 2019), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).

Commentary. Arunachal Pradesh's floods come from three sources, often together. The first is the slide and flash flood of the hill slopes round the towns. On 11 July 2017, after three days of rain, a landslide at Laptap in the Toru circle of Papum Pare district buried a family's houses and killed 14 people (14 to 16 in different reports, at about 13:30 or about 15:30 in different reports); no rainfall amount was published (as reported). In the 2017 monsoon the capital's floods badly damaged the "land protection wall of several nallahs and rivulets" and closed NH-415, with traffic diverted via Papu Nallah and Jullang Road (master plan of the Itanagar Capital Region). About 14 September 2018 cloudburst flash floods at Modirijo and Donyi Polo in Itanagar–Naharlagun killed 3 people with at least 4 missing (later reports give up to 7 dead), damaged more than 90 houses and washed away the Senki View culvert and the Press Colony bridge, with a landslide reported from "the dumping area of NH 415" (as reported); this was September 2018, not 2017. At Niti Vihar in Itanagar a landslide brought down a protection wall and killed 4 people (as reported; date not found). On 23 June 2024 heavy morning rain inundated at least 66 houses in Itanagar and Naharlagun, damaged NH-415, flooded Energy Park and brought a landslide at Niti Vihar; the press called it a cloudburst, but the State Disaster Management Authority's secretary said that IMD recorded 40 mm between 10:30 am and 12:30 pm and "confirmed there was no incident of cloudburst" (as reported). An "Itanagar cloudburst" is also reported for July 2024, about 28 July, with landslides, NH-415 submerged, homes near Energy Park and Bank Tinali flooded and seven relief camps, but the dateline and the publication date conflict (as reported); this Manual keeps the June and July events apart. On 30 May 2025 a landslide swept a vehicle off NH-13 between Bana and Seppa and all seven people in it died (as reported). On 24 June a flash flood from a side stream of about 17 km² struck the Poosa / NEEPCO colony at Yazali in Keyi Panyor district, killing 1 with 4 missing and washing away about 18 quarters (or about 50 houses), while "the main river stayed in its channel"; Down To Earth of 25 June 2026 reports it in 2026, with 73 mm in 24 hours at IMD's gauge, mostly in 3 hours, while EastMojo of 21 July 2026 dates its photographs to 2025 (as reported; the year conflicts).

The second is the river flood of the foothill plains, driven from upstream. On 10–11 June 2000 the breach of the Yigong landslide dam in Tibet sent a flood down the Siang that gave the CWC gauge at Pasighat its highest flood level, 157.54 m on 11 June 2000, 3.58 m above its danger level (CWC data as transcribed by SANDRP, as reported); a peer-reviewed analysis records "a recorded rise of 5.5 m at the Pasighat gauge, 462 km downstream" (as summarised); the impounded volume is given as about 2.015 × 10⁹ m³ in one analysis and as about 2,000 or 3,000 million m³ in others; and the deaths as 30 or as more than 100, some figures including the reaches downstream of the State (all as reported; conflicts). Press claims of a "30 m" rise are inconsistent with the gauge and are not used [U]. In November 2017, after landslide dams formed on the river in Tibet, the Siang at Pasighat ran at 425 NTU against a December normal of 12–15 (as reported); landslide-dam alerts followed in October 2018, and the river ran muddy again in November 2022 (cause unconfirmed) (as reported). NDMA lists 27 glacial lakes in the State as high-risk, 16 of them in Dibang Valley and 6 in Tawang (as reported).

The third is the statewide monsoon flood, with the dams' releases. The remnants of Cyclone Remal brought 190 mm at Bomdila, 120 mm at Miao and 70 mm at Namsai in 24 hours to 29 May 2024 (IMD bulletin, as summarised). From late May to 7 June 2025 floods and landslides killed 12 people with 1 missing, affected 33,200 people in 215 villages of 24 districts and damaged 515 houses, 112 roads, 17 bridges and 51 water-supply schemes, by the State Emergency Operation Centre's count; other reports give 9, 10 and 11 dead and 156 villages (as reported; conflict); the Pare dam on the Dikrong released a peak of 1,310 m³/s on 31 May 2025 (as reported). By 20 July 2026 the season had brought 173 landslides, 104 floods, 80 heavy-rainfall events and 8 flash floods to 594 villages in 337 circles, affecting about 1.49 lakh people, with 15 deaths, 4 in flash floods (Department of Disaster Management, as quoted in the press). APSDMA's official tolls for these events were not found [TBC].

Missing design makes all three worse. No design storm, return period or drain standard was found for the drains of any town in the State; the master plan of the Itanagar Capital Region calls the existing drains "not engineered … open drains or kutcha drains without any flow gradient", finds "only 3.7% storm drains along main roads" and reports "storm water drains being used as sewers"; and the APBBL 2019 control the site plan, cuts and rainwater harvesting, not runoff, and set no distance from any stream, nallah or spring. Their "complete utilization and capture of storm water" on public open spaces of more than 500 m² (9.6) and the 20% of unpaved open space on large sites (Table 14.1) belong to the rainwater-harvesting chapter and the environmental conditions: they set no detention volume, peak flow or release rate, which is why this Manual counts the bye-laws among the instruments that mandate RWH only. Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix; the slides and the outbursts are answered by the siting, screening, infiltration and debris rules of Chapters 2, 4, 6 and 7, because no drain is sized to carry a debris flow or an outburst.

No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Arunachal Pradesh Building Bye-Laws, 2019 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.


1.2 Stormwater management hierarchy

1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.

  1. Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
  2. Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
  3. Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
  4. Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).

1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.

1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.

Figure 1.1 — Stormwater management hierarchy Four stacked bars, widest at top: Preserve, Retain, Detain, Convey, with a Maintain bar underneath spanning all. A downward arrow shows the order of consideration; an upward arrow shows that credits from higher measures reduce lower ones. Order of consideration Credits reduce lower measures 1 PRESERVE Chapter 7 Keep tanks, wetlands, marshes, permeable soils, trees and flow paths 2 RETAIN Chapters 4, 8 Hold the Annex 2E depth on site: infiltrate, reuse, evaporate 3 DETAIN Chapters 4, 5 Store larger storms; release below pre-development peaks 4 CONVEY Chapters 6, 9 Minor system, plus a 1% AEP overland path MAINTAIN — underlies every measure Chapter 10 A measure that its owner cannot maintain earns no credit (Clause 1.2.2) Use a lower measure only for what the measures above it cannot practicably achieve (Clause 1.2.1).

Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).

Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Arunachal Pradesh, the top two layers have a particular meaning. Much of the natural storage that serves the towns lies in their streams and nallahs, the Senki, the Pachin, Papu Nallah and the Dikrong in the capital region, from which Itanagar also draws water (the Senki by lift, 7 MLD; the Poma and the Niorch by gravity, 11 and 7 MLD; master plan of the Itanagar Capital Region); in the springs, which in Papum Pare discharge 0.43–2 litres a second before the monsoon and of which "most … become dry during dry season", and which are the only source in the northern hills of East Siang (CGWB); in the State's lakes and wetlands, 1,127 of 2.25 ha or more, 944 of them high-altitude lakes far from the towns and only two of them classed as a tank or pond (Department of Environment, Forest and Climate Change, wetland truthing), among them Ganga Lake (Gyakar Sinyi) in the Itanagar Wildlife Sanctuary, under encroachment and earth-cutting pressure (as reported), and Glaw Lake in Lohit district, announced on 3 August 2026 as the State's first Ramsar site (as reported); in the ponds and swamps of the valley floors, among them the ponds into which the master plan finds drains and sewage discharged; and in the sandy terrace soils of the Naharlagun–Nirjuli–Doimukh valley, 95.19% sand at NERIST's test plot at Doimukh, with a basic infiltration rate of 1 cm/h (Dabral et al., 2016). The law protects little of this. The Arunachal Pradesh Municipal Act, 2007 vests "all public tanks, streams, reservoirs, and wells" of a municipality in it (s.102), and the Arunachal Pradesh Municipal Corporation Act, 2019 vests "all public streams, springs and works for the supply … of water" in the Corporation; the APBBL 2019 ask every urban local body and planning authority to "identify, demarcate, protect and maintain the water bodies that come under their jurisdiction" and list them (Annexure E 1.8), and list "water bodies (and the areas adjoining the same)" among the natural features to be notified or identified in a master plan (Chapter 12). No statute or bye-law found protects a stream, nallah, spring or pond with a numerical buffer, no floodplain zoning law was found, and no wetland of the State was found notified under rule 4 of the Wetlands (Conservation and Management) Rules, 2017. In the hills the second layer changes. Retention on a slope is storage and reuse, not infiltration: water put into residual soil, slope debris and fill over Siwalik sandstone and shale raises the pressure in the slope, and concentrated discharge onto slopes preceded the Laptap slide of 2017 and the Itanagar slides of 2024 and 2025 (NEER reading of the reports). This Manual therefore bars deliberate infiltration on natural slopes of more than 10°, on Siwalik shale at any slope, on colluvium, slope debris or fill, in mapped landslide zones, above a landslide scarp and within twice the height of a cut or retaining wall upslope of it, unless a geotechnical certificate allows it (Clause 4.11, hill rule); bars it on land below the 1% AEP flood level of the Dikrong, Pachin, Senki, Siang, Lohit, Dibang or Noa-Dihing or of a nallah, on the palaeochannels and swamps of the Pachin and Dikrong flood plains, on pond margins and wherever the seasonal high water table is within 2.0 m of ground (Clause 4.11, floodplain rule); and allows recharge only on the tested terrace sands of the capital's valley and the coarse bhabar fan heads above the water table, because the State's stage of groundwater extraction is 0.39% (CGWB, 2024, as summarised) and recharge is not a design objective (Clause 4.11, recharge rule) (all set by this Manual). Rainwater harvesting elsewhere is storage and reuse. Losing the stream heads, springs and swamps cannot be offset by pipes, and in the hills a drain that puts water into a slope can make it fail.


1.3.1 Notification. This Manual shall be given statutory effect by the Government of Arunachal Pradesh through:

  • (a) an amendment to the Arunachal Pradesh Building Bye-Laws, 2019 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
  • (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.

1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.

1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.

1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.

Commentary. In Arunachal Pradesh the building rules are the Arunachal Pradesh Building Bye-Laws, 2019 (Department of Town Planning and ULBs, Government of Arunachal Pradesh), which define "Act" as the Arunachal Pradesh Municipal Act, 2007 (Act No. 4 of 2008) and the Arunachal Pradesh Urban and Country Planning Act, 2007 (Act No. 3 of 2008). The table of contents of the copy read lists a "Gazette Notification" page, but that page is blank, so the notification number, date and gazette reference are to be confirmed [TBC]. The bye-laws "shall extent to whole of Arunachal Pradesh with effect from the date of notification" (2.1) and are applicable "for a period of FIVE years after which they shall be reviewed. Till such time the reviewed building byelaws are notified, these building byelaws will continue to be in force" (2.2); whether the review, due from 2024, has begun is not known [TBC]. Their "Authority" is "The Director/Chief Town Planner of Town Planning & Urban Local Body, Government of Arunachal Pradesh … till an executing authority is notified" (definition 12). The Arunachal Pradesh Fire and Emergency Services Act, 2026 (Act No. 12 of 2026) names them as the State's building bye-laws: "'Building bye-laws' means the 'Arunachal Pradesh Building Bye-laws- 2019'" (s.2(c)); the Online Building Permission System launched on 30 July 2025 was "customised" to them and processes all permits online (as reported). No amendment was found. Two earlier texts are not the current rule: an "Arunachal Pradesh Building Bye-Law 2010" listed as notified on the Town Planning portal (as summarised; not read), and the Directorate of Town Planning's "FINAL DRAFT" of 2009, whose hill-site clause asked for the "location of landslide prone areas" and for the "diversion of the natural flow of water coming from uphill side"; that clause is not in the 2019 text, although the report of the Itanagar Capital Region master plan reproduces it, and this Manual does not treat it as in force. The APBBL 2019 ask the site plan to show "existing physical features such as well, drains" (2.10.1(j)) and the "Distance from Nallah/Stream as per the notified rules/norms" (2.10.1(e)), for which no rules or norms were found; set a plinth of "not less than 300 mm" (4.2.1.1); bar septic effluent from "an open channel drain or body of water without adequate treatment" (4.16.2(c)); let the Authority require rain-water pipes "to be connected to a drain or sewer" (4.19.1.1); refuse earth-cutting permission "if the average slope of the topography is more than 30%", limit a cut to 3 m and require a retaining or breast wall "immediately" (4.39(4), (11), (14)); require a rainwater-harvesting proposal for plots of 100 m² (9.1) and "complete utilization and capture of storm water" on public open spaces of more than 500 m² (9.6); and ask large sites to keep "the inlet and outlet point of natural drain system" open (Table 14.1). They set no storm-water volume, peak-flow, detention, setback number, flood plinth above 300 mm or design storm.

Land is the second matter. Arunachal Pradesh has no Sixth Schedule area, and Article 371H of the Constitution, inserted by the Constitution (Fifty-fifth Amendment) Act, 1986, gives the Governor special responsibility for law and order; it does not protect customary law or land (as quoted). Land is governed by the Arunachal Pradesh (Land Settlement and Records) Act, 2000 (Act No. 10 of 2000), a law for land revenue administration "incorporating customary rights on the land", which defines "community" to include "a clan, sub-clan, kindred" and "common land" as land "used or reserved for the common use of a community or a village" (s.2(c), (d)), and declares the beds of rivers, streams, nallahs, lakes and tanks the property of the Government only where they "are not the property of any person or community" (s.9(1)). Individual titles were introduced by an amendment of 2018 (s.1A, as reported), and acquisition "exercises have often run into troubled waters" because customary laws hold sway (as reported). Much land near the towns is held by communities, clans and individuals, and stream and nallah beds on it are not Government property. Nothing in the Constitution limits the State's laws on land here, as Article 371A or the Sixth Schedule does in other North-East editions, and the bye-laws apply statewide (NEER reading). This Manual therefore presents its corridors and setbacks as conditions of building permission and layout approval wherever the bye-laws apply, and as recommendations for works on community land outside any permission; land for public drains is secured by agreement with the owners or the community, by donation (the 2000 Act's own definition of Government land includes land obtained "through donation of the public", s.2(h)), by purchase, or by reservation in a master plan, layout or Town Planning Scheme. Where the State decides that land must be obtained compulsorily, section 104 of the 2007 Municipal Act routes it through the "Land of Acquisition Act, 1894" (as printed), which the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 has replaced for the Union (NEER reading), and section 104(3) also allows "other methods of land assembly including the use of transferable development rights". The Manual states that route; it does not invoke it, and it takes no land. It binds no community or clan on its own land.

The route of Clause 1.3.1 therefore runs several ways, each of which a body could take and none of which has been taken. The Department of Urban Affairs (Town Planning wing) could carry this Manual into the five-year review of the APBBL 2019 (2.2), or notify its 15 m corridor as the "norms" to which 2.10.1(e) refers (Clause 1.3.1(a)). The Itanagar Municipal Corporation could make bye-laws under the Arunachal Pradesh Municipal Corporation Act, 2019 and apply its connection rules (s.203), and the Pasighat Municipal Council could act under sections 194 to 196 of the 2007 Act (Clause 1.3.1(b)). The Government could use the Manual in a "Sponge City" or "Risk Informed master Plan" policy document under the new section 71(2)(za) inserted by the Arunachal Pradesh Urban and Country Planning (Amendment) Ordinance, 2025 (Ordinance No. 5 of 2025), if that power stands in the amending Act, a Bill for which was reported passed on 9 March 2026 and whose Act number and final text were not found [TBC]. The Itanagar Planning Authority and the other Local Planning Authorities could carry drainage reserves and the 1% AEP areas into master plans, layouts and Town Planning Schemes under the Arunachal Pradesh Urban and Country Planning Act, 2007; the Arunachal Pradesh State Disaster Management Authority (APSDMA) could use it in the "Disaster Prone Area" norms that 2.10.1(f) anticipates and in district disaster management plans; and PWD and WRD could apply it to their works. Outside any permission or plan, this Manual reaches only public works executed by the State's departments and agencies (Clause 1.5.1(b)) and any body that adopts it; for a household or a community it is guidance (Commentary to Clause 1.5). This Manual is a draft; neither the Government, any department, the Itanagar Municipal Corporation, the Pasighat Municipal Council, any Local Planning Authority, any village authority or community nor any other authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.


1.4 Definitions

1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).

Term Meaning in this Manual
Approving Authority (the Authority) The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the competent authority for the area: in the area of the Itanagar Municipal Corporation (IMC), the Authority under the Arunachal Pradesh Building Bye-Laws, 2019 (the Director/Chief Town Planner of Town Planning & Urban Local Body, or the executing authority once one is notified, with its Building Permission Committee) for the building permit and the earth-cutting permission (4.39), and IMC for its own drains and the connections to them (sections 60, 200 and 203 of the Arunachal Pradesh Municipal Corporation Act, 2019); in the Pasighat municipal area, the Pasighat Municipal Council for its drains (sections 102, 194 and 196 of the Arunachal Pradesh Municipal Act, 2007) and for building sanction through its Municipal Building Committee (sections 340–343); in a Local Planning Area, the Local Planning Authority (the Itanagar Planning Authority in the Itanagar Capital Region) for layouts, the master plan and Town Planning Schemes under the Arunachal Pradesh Urban and Country Planning Act, 2007; elsewhere, the Authority under the bye-laws, which extend to the whole State (2.1); for a public work, the department or agency that executes it (the Department of Urban Affairs, the Public Works Department (PWD), PWD (Highways), the Water Resources Department (WRD), the Public Health Engineering and Water Supply Department (PHED) or a Smart City company); WRD for any work in or on a river; and, on community or clan land where no permission is sought and no plan applies, the owners or the community by agreement, for whom this Manual is guidance (none has adopted it), or a department for its own works.
Applicant The owner, developer or department that seeks approval, and its successors in title.
Development Any building, layout, sub-division, road, paving or land-use change that requires approval under the Arunachal Pradesh Building Bye-Laws, 2019 or that is executed as a public work.
Redevelopment Development on a site where impervious cover already exists.
Land disturbance Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5).
Impervious area Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats.
New or replaced impervious area Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced".
Retention Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4).
Detention Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4).
Rainwater harvesting (RWH) Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it.
Minor system Drains, pipes and inlets designed for the minor-system AEP of Chapter 6.
Major system The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6).
Pre-development condition Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3).
Flood-sensitive catchment The catchments of the Senki through Itanagar; of the Pachin through Itanagar and Naharlagun; of the Dikrong at Naharlagun, Nirjuli and Doimukh, with Papu Nallah, below the Pare dam and the Ranganadi tailrace; of the NH-415 corridor from Itanagar to Naharlagun; of Modirijo and Donyi Polo; of Pasighat on the Siang; of Tezu on the Lohit; of Namsai and Miao on the Noa-Dihing; of Roing on the Dibang; of the Ranganadi reach at Yazali; and of the glacial-lake and outburst reaches of Tawang and Dibang Valley, and any catchment the Authority notifies (Chapter 4; Annex 1B).
Waterbody A river, stream, canal, tank (pond), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7).
Regional facility A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4).
Tier A / Tier B authority An Approving Authority classed under Clause 1.6.
Policy supplement The set of adoptable alternative clauses in Clause 1.7 and Annex 1C.
Drainage report The preliminary or final report required by Chapter 10.
Registered professional A person registered under the Arunachal Pradesh Building Bye-Laws, 2019 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6.
Compliance calculator The State-issued tool for computing and reporting compliance (Clause 10.5).
Maintenance declaration The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10).
Variance Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10).
Waiver Approval that a requirement does not apply to a site, on the grounds in Clause 1.10.
Notified Published by the Government or the State Stormwater Technical Committee in the Arunachal Pradesh Gazette.
Competent authority for the area The body that grants permission for the site, or executes the work, under the instrument that applies there: in the area of the Itanagar Municipal Corporation (IMC), the Authority under the Arunachal Pradesh Building Bye-Laws, 2019 for the building permit and the earth-cutting permission, and IMC for its own drains and the connections to them (sections 60, 200 and 203 of the Arunachal Pradesh Municipal Corporation Act, 2019); in the Pasighat municipal area, the Pasighat Municipal Council for its drains and building sanction (sections 102, 194, 196 and 340–343 of the Arunachal Pradesh Municipal Act, 2007); in a Local Planning Area, the Local Planning Authority (the Itanagar Planning Authority in the Itanagar Capital Region) for layouts, the master plan and Town Planning Schemes; elsewhere, the Authority under the bye-laws, which extend to the whole State; for a public work, the department or agency that executes it; WRD for any work in or on a river; and, on community or clan land where no permission is sought and no plan applies, the owners or the community by agreement, for whom this Manual is guidance. Where this Manual says "the Authority", the competent authority for the area is meant. This Manual does not bind a community or clan on its own land.
Community land Land held by a community, which under the Arunachal Pradesh (Land Settlement and Records) Act, 2000 means "residents of a village as a whole and includes a clan, sub-clan, kindred" (s.2(d)), including "common land", land "used or reserved for the common use of a community or a village" (s.2(c)), held under customary rights that the Act incorporates. The beds of rivers, streams, nallahs, lakes and tanks are Government property only where they "are not the property of any person or community" (s.9(1)). Much land near the towns is community, clan or individually held; individual titles were introduced by an amendment of 2018 (s.1A, as reported). Where this Manual reserves a drainage corridor, an easement or a facility site on community, clan or private land, the land is secured by agreement with the owners or the community, by donation, by purchase, or by reservation in a master plan, layout or Town Planning Scheme; it is never taken (set by this Manual).
Jhot "A strip of land permanently left open for drainage purposes. It is not to be used as an access way or a street and is not to be included as a part of setbacks" (Arunachal Pradesh Building Bye-Laws, 2019, definition 69). The bye-laws give it no width. This Manual uses the word for that strip only.
Nallah A natural or open urban channel that carries storm water, and often waste water, to a river, as the capital's nallahs carry it to the Senki, the Pachin and the Dikrong; the word of the bye-laws ("Distance from Nallah/Stream", 2.10.1(e)), of the Land Settlement and Records Act (s.9(1)) and of the master plan of the Itanagar Capital Region ("natural drainage system (Nallah)"), and of place names such as Papu Nallah. A nallah draining 8 ha or more is treated as a natural channel under Chapter 7.
Itanagar Capital Region The area of the Master Plan of Itanagar Capital Region-2031, approved on 3 June 2022 under the Arunachal Pradesh Urban and Country Planning Act, 2007: Itanagar, Naharlagun, Nirjuli, Doimukh and Banderdewa, with the Itanagar Planning Authority as its Local Planning Authority. It is not the Itanagar Capital Complex, the district of the Deputy Commissioner who chairs that Authority.

Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).


1.5 Applicability

1.5.1 Who is covered. This Manual applies to:

  • (a) all development requiring planning permission, building permit or layout approval under the Arunachal Pradesh Building Bye-Laws, 2019;
  • (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
  • (c) works executed by Central agencies or their contractors within Arunachal Pradesh, to the extent that the Authority's approval or no-objection is required.

1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:

  • (a) land disturbance of 0.1 ha or more; or
  • (b) new or replaced impervious area of 500 m² or more.

1.5.3 RWH. The existing RWH mandate continues to apply under Chapter 9 and Annexure E of the Arunachal Pradesh Building Bye-Laws, 2019 to every building on a plot of 100 m² or more, whose building plans must include "the complete proposal of rainwater harvesting" (9.1; Annexure E 1.1), with recharge mandatory for buildings of 500 m² and more and for parks, parking and plazas (9.7), "complete utilization and capture of storm water" on public open spaces of more than 500 m² (9.6) and inspection by a Rainwater Harvesting Cell before the completion certificate (9.8), but with no storage volume, release rate or design storm, as now. This Manual does not change it.

1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:

  • (a) no sewage connection to a storm drain (Chapter 8);
  • (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
  • (c) waterbody setbacks and the no-fill zone (Chapter 7); and
  • (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).

1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.

1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.

1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.

1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:

  • (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
  • (b) linear road resurfacing that adds no impervious area.

Exempt development remains subject to the RWH mandate and to Clause 1.5.4.

1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.

Figure 1.2 — Applicability decision flowchart Flowchart for Clause 1.5: approval test, exemption test, size threshold test, and flood-sensitive catchment test, leading to the requirements that apply. Development or public work (Clause 1.5.1) Needs building-rules approval, or is it a public work? No Manual not triggered; other rules apply Yes Exempt under Clause 1.5.8? (single dwelling below the threshold, or road resurfacing that adds no impervious area) Yes Exempt from Chapters 4–5. RWH (where mandated) and Clause 1.5.4 still apply No Land disturbance ≥ 0.1 ha, or new or replaced impervious area ≥ 500 m² (Clause 1.5.2)? No Below threshold: RWH (where mandated) and Clause 1.5.4 apply Yes Chapters 4 and 5 apply: retention, detention, downstream and tailwater analysis (+ RWH, 1.5.4) In a flood-sensitive catchment (Annex 1B)? Yes Mixed-frequency rule; full methods only; no Policy Supplement alternatives No Standard rule: Q_post ≤ 0.9 × Q_pre Tier B: design-aid route may be used (Clause 1.7) Decision Chapters 4–5 requirements Chapters 4–5 do not apply

Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.

Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:

  • Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
  • Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
  • The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
  • MBBL 2016 makes recharge mandatory for buildings over 500 m².

The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Arunachal Pradesh plots are small and the cumulative effect of many small plots is what fills Itanagar's drains. For small buildings in Arunachal Pradesh, the APBBL 2019 already require "the complete proposal of rainwater harvesting" with the building plans of every building on a plot of 100 m² (9.1; Annexure E 1.1), not below it (Annexure E 1.4); ask every site plan to show the existing drains and the distance from the nallah or stream (2.10.1(j), (e)); and let the Authority require rain-water pipes to be connected to a drain (4.19.1.1). None sets a volume, and a harvesting tank is full when the season's storm arrives, so none of it limits what leaves the plot in a design storm. The bye-laws place a septic dispersion system at least 18 m from drinking-water sources and 6 m from buildings (4.16.1), which on a slope puts water into the ground that the hill rule of Clause 4.11 protects; they refuse earth cutting above an average slope of 30% and require a retaining or breast wall "immediately" after a cut (4.39(11), (14)), but no rule asks a single building to carry the water from uphill around its foundations or to discharge its roof water to a lined drain or stable channel rather than down the slope; the 2009 draft's clause on "diversion of the natural flow of water coming from uphill side" is not in the 2019 text. Clause 1.5.4(b) applies to every building whatever its size for this reason. The bye-laws extend to the whole State (2.1), so every building that needs a permit is within reach; where no permission is sought, as for many houses on community or clan land, this Manual is guidance only: a household or a community could use the small-site method of Chapter 4 and the hill rule of Clause 4.11 as guidance. A small building on a hill slope is where a soak pit or soakaway can do most harm, and the Authority may make the hill rule of Clause 4.11 a condition of every building permit, whatever the size of the site (a recommendation of this Manual, not a requirement of Clause 1.5.4); where a septic dispersion trench or soak pit on a slope of more than 10° or on shale cannot be avoided, this Manual recommends that a geotechnical engineer site it, downslope of buildings and cuts, and refers sewage questions to Clause 8.9; the Manual does not override bye-law 4.16.1. Where the recharge that 9.7 makes mandatory for buildings of 500 m² and more falls on a site where the hill rule or the floodplain rule of Clause 4.11 forbids infiltration, the two conflict: this Manual requires storage in place of recharge there, and the applicant seeks the Authority's relaxation; the Manual does not override the bye-law (Table 1.3).

Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.


1.6 Tiered adoption

1.6.1 Tier A authorities. The following are Tier A:

  • (a) the Itanagar Municipal Corporation (IMC); and
  • (b) every approving authority within the area of the Master Plan of Itanagar Capital Region-2031 (Itanagar, Naharlagun, Nirjuli, Doimukh and Banderdewa), that is, the Itanagar Planning Authority for layouts and the Authority under the APBBL 2019 for building permits, whichever has jurisdiction over a site.

1.6.2 Tier B authorities. All other urban local bodies, Local Planning Authorities and other authorities under the bye-laws are Tier B.

1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:

Table 1.1 — Differences between Tier A and Tier B authorities

Item Tier A Tier B
Performance criteria (Chapters 2–9) Apply in full Apply in full
Hydrologic method for storage Hydrograph method (Chapter 3) Hydrograph method, or the design-aid route of Clause 1.7 where eligible
Compliance calculator (Clause 10.5) Required as a summary Required; may be the sole calculation on the design-aid route
Policy supplement alternatives (Clause 1.7) Only with State Stormwater Technical Committee concurrence May be adopted by council resolution
Technical review By the Authority By the Authority, with Urban Affairs regional support or an empanelled reviewer (Clause 10.7)
Flood-sensitive catchment rule Applies Applies

1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the area of the Master Plan of Itanagar Capital Region-2031 (Itanagar, Naharlagun, Nirjuli, Doimukh and Banderdewa), which contains the area of the Itanagar Municipal Corporation, or is found by a post-event review (Clause 10.16) to need the full methods.

1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.

Commentary. Itanagar Municipal Corporation, with no drain inventory or drain design standard found, a proposal for 64 km of integrated drains (as reported, undated), "only 3.7% storm drains along main roads" in its capital region (master plan of the Itanagar Capital Region) and administrators in charge from the dissolution of the council in June 2018 until the Corporation's first mayor was elected in January 2021 (PIL 22(AP)/2018; as reported), and a small municipal council with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Itanagar.


1.7 Policy supplement: adoptable alternatives

1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.

1.7.2 The alternatives are:

Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5

No. Main-text requirement Adoptable alternative Eligibility
S-1 Storage sized by hydrograph method (Chapter 3) Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1)
S-2 Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule Any site outside flood-sensitive catchments
S-3 Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 Waterbodies with no mapped 1% AEP extent
S-4 Downstream analysis by hydraulic model (Chapter 5) Screening checklist of downstream capacity and known flooding, with a model only where the screen fails Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall
S-5 On-site detention Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) Where a basin plan has been notified

1.7.3 Conditions on adoption.

  • (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
  • (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
  • (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
  • (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
  • (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).

Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.


1.8 Relationship with other instruments

1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.

Table 1.3 — Relationship with other instruments

Instrument Relationship
Arunachal Pradesh Building Bye-Laws, 2019 (Department of Town Planning and ULBs, Government of Arunachal Pradesh; notification number, date and gazette reference [TBC]: the "Gazette Notification" page of the copy read is blank); named as the State's building bye-laws by s.2(c) of the Arunachal Pradesh Fire and Emergency Services Act, 2026 (Act No. 12 of 2026); no amendment found. Not the current rule: the "Arunachal Pradesh Building Bye-Law 2010" listed on the Town Planning portal (as summarised; not read) and the 2009 "FINAL DRAFT" Continue. They "shall extent to whole of Arunachal Pradesh with effect from the date of notification" (2.1), are read with any master plan or other statutory plan in force, and are applicable "for a period of FIVE years after which they shall be reviewed. Till such time the reviewed building byelaws are notified, these building byelaws will continue to be in force" (2.2). The Authority is "The Director/Chief Town Planner of Town Planning & Urban Local Body … till an executing authority is notified" (definition 12); permits are processed through the Online Building Permission System, launched on 30 July 2025 and "customised" to the bye-laws (as reported). "Drain" is "A conduit or channel for the carriage of storm water, sewage, waste water or other waterborne wastes in a building drainage system" (definition 35); Jhot is "A strip of land permanently left open for drainage purposes. It is not to be used as an access way or a street and is not to be included as a part of setbacks" (definition 69), with no width; "Street" includes "storm water drains, culverts". The site plan shows "existing physical features such as well, drains" (2.10.1(j)), the "Distance from Nallah/Stream as per the notified rules/norms" (2.10.1(e)) and the "Distance from Disaster Prone Area as per norms set by Disaster Management Authority" (2.10.1(f)), neither set of norms having been found; a retaining wall on a sloping site stands at least 0.60 m from the building (2.10.2(a)); a layout is approved under the Arunachal Pradesh Urban and Country Planning Act, 2007 (2.10.3); and a certificate of supervision of "drainage/sanitary works" accompanies the notice (2.10.10, Appendix 'A-3'). The norms for hill towns are "only indicative" (3.2); the plinth is "not less than 300 mm" above the surrounding ground, so located "that adequate drainage of the site is assured" (4.2.1.1); surface drainage must not enter a basement; and natural hazard prone areas include those flooded by "back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area". They set no storm-water volume, peak-flow, detention, setback number, flood plinth above 300 mm or design-storm rule. The design criteria of Chapters 2–6, the hill, floodplain and recharge rules of Clause 4.11 and the corridors of Chapter 7, whose Zone 1 is at least 15 m and is offered as the "norms" to which 2.10.1(e) refers, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where the APBBL 2019, a master plan or a statute is stricter, it governs (Clause 1.3.3).
Rainwater harvesting and storm-water capture: APBBL 2019, Chapter 9 and Annexure E; environmental conditions for large sites, Tables 14.1–14.3 Continue unchanged. "All buildings having a plot size of 100 sqm while submitting the building plans for sanction shall mandatorily include the complete proposal of rainwater harvesting" (9.1; Annexure E 1.1), not mandatory below 100 m² (Annexure E 1.4); group housing avoids concrete paving, with "permeable materials … for all open parking spaces" (Table 9.1); public open spaces of more than 500 m² "shall have arrangements for complete utilization and capture of storm water", including "Artificial or natural Storage of storm water runoff from larger sites" (9.6); recharge is mandatory for all buildings of 500 m² and more and for parks, parking and plazas (9.7); a "Rainwater Harvesting Cell" inspects before the completion certificate, with 100% monitoring above 1,000 m² and a 10% random survey below (9.8); the Authority "may impose a levy" for failure (Annexure E 1.7); and every urban local body and planning authority is to "identify, demarcate, protect and maintain the water bodies that come under their jurisdiction" and prepare a list (Annexure E 1.8). Sites of 5,000 m² of built-up area and more keep at least 20% of their recreational open space unpaved and "The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water" (Table 14.1). None sets a storage volume, release rate or design storm. This Manual counts stored rainwater against its retention requirement only as reuse (Clause 4.4.3), never as detention. Where 9.7's mandatory recharge falls on a site where the hill rule or the floodplain rule of Clause 4.11 forbids infiltration, the two conflict: this Manual requires storage in place of recharge there, and the applicant seeks the Authority's relaxation; the Manual does not override the bye-law.
Effluents and roof drainage: APBBL 2019, 4.16, 4.19 and 4.33 Continue. Septic tanks follow Part 9 of the National Building Code, with the dispersion system at least 18 m from drinking-water sources and 6 m from buildings (4.16.1), and "Under no circumstances shall effluent from a septic tank be allowed into an open channel drain or body of water without adequate treatment" (4.16.2(c)); "The Authority may require rain-water pipes to be connected to a drain or sewer" (4.19.1.1); rainwater harvesting is "desirable" under Part 9 of the National Building Code (4.19.1.3); and large buildings treat their waste water (4.33.4). The rule against septic effluent in open drains is already in force; the gap is enforcement and the absence of a sewer or septage service (Chapter 8). A dispersion system on a slope of more than 10° or on shale conflicts with the hill rule of Clause 4.11; the Manual recommends that a geotechnical engineer site it and does not override the bye-law.
Earth cutting and sloping sites: APBBL 2019, 4.39 Continue. Earth-cutting permission is valid for six months; a cut is not more than 3 m high (4.39(4)) and keeps 2.5 m from the property line on the upper terrace (4.39(5)); the owner clears "soil/debris from site or drain to suitable/safer place" (4.39(8)) and builds a retaining or breast wall "immediately" (4.39(11)); and "Earth cutting permission shall not be granted if the average slope of the topography is more than 30%. And the site will be declared as not fit for construction except for plantation", with a penalty of one lakh rupees for cutting without approval and a recommendation by the Building Permission Committee to cancel the land allotment (4.39(14)). The 30% limit (about 17°) is an earth-cutting rule, not an infiltration rule; the hill rule of Clause 4.11 bars deliberate infiltration on natural slopes of more than 10°, and the slope drainage of Chapter 6 attaches to the earth-cutting permission.
Arunachal Pradesh Municipal Act, 2007 (Act No. 4 of 2008; Notification No. LAW/LEGN-21/2007, 19 March 2008; Gazette Extraordinary No. 23, Vol. XV, 19 March 2008; assent 17 March 2008); notification of the Pasighat municipal area (No. DTPMUN-43/2010-2011, 24 August 2010) Continue. "Drainage and sewerage" is a core municipal service (s.47(1)(a)(ii)), which the municipality may "decide not to take up, or postpone" (s.47(2)) and the State may direct (s.47(3)); other functions include "improving river banks" (s.49). "Notwithstanding anything contained in any other law", the Act vests in the municipality "all public tanks, streams, reservoirs, and wells" and "all public sewers and drains, channels, tunnels, culverts and watercourses, alongside, or under, any street" (s.102(b), (d)). The municipality "shall … construct and maintain drains and sewers, and provide a safe and sufficient outfall … for … proper discharge of storm-water and sewage … in such manner as may not cause any nuisance, whether by flooding", with a proviso that "no sewage shall be discharged into any watercourse until it has been so treated" from a date the State appoints (s.194); public drains and sewage works vest under s.196; "Water-course" includes a river, stream or channel, natural or artificial (s.2(85)); and buildings are sanctioned by a Municipal Building Committee (ss.340–343). Compulsory acquisition runs "under the Land of Acquisition Act, 1894" (as printed) at the municipality's request, and "other methods of land assembly including the use of transferable development rights" are allowed (s.104). Pasighat is the State's Municipal Council under this Act (municipal area 10.21 km²; 8 wards, as reported); the Itanagar municipal area was notified under it on 14 September 2010 (No. DTPMUN-02/2008-2009), and the Gauhati High Court records notifications of 06.02.2012 (Itanagar) and 20.12.2012 (Pasighat) (PIL 22(AP)/2018), a date conflict with the 2010 gazettes; both may exist. Councils first elected on 16.05.2013 were dissolved in 2018 and administrators appointed (PIL 22(AP)/2018).
Arunachal Pradesh Municipal Corporation Act, 2019 (Act No. 8 of 2019; Notification No. Law/Legn-4/2019, 30 September 2019; Gazette Extraordinary No. 373, Vol. XXVI, 1 October 2019; assent 17 September 2019); the notification constituting the Itanagar Municipal Corporation under sections 3 and 4 (not found [TBC]); the Delimitation of Ward Rules, 2019 (as summarised) Continue. The obligatory functions include "(a) the maintenance and cleaning of drains and drainage works", "(c) the reclamation of unhealthy localities" and "(p) survey of buildings and lands" (s.60); "all public streams, springs and works for the supply, storage and distribution of water" and "all public sewers and all drains, and sewers, culverts and water courses in or under any public street" vest in the Corporation, and public drains and sewage disposal works in the municipal area vest in it under s.200. An owner may connect a private drain to a Corporation drain on application, but may not discharge "foul water into a drain provided for surface water" where separate drains exist, nor, "except with the permission of the Commissioner, surface water into drain provided for foul water", nor connect "directly with a storm water overflow drain" (s.203). Its town-planning-scheme "internal services" include "sewers and drains both for storm and sullage water and necessary provision for their treatment and disposal". The Itanagar Municipal Corporation (IMC) has 20 wards and elected councils in January 2021 and January 2026, and a notice of March 2026 proposed extending its limits to Jullang, Chimpu and nearby villages (all as reported).
Arunachal Pradesh Urban and Country Planning Act, 2007 (Act No. 3 of 2008; Notification No. LAW/LEGN-6/2007, 11 March 2008; Gazette Extraordinary No. 18, Vol. XV, 14 March 2008; the copy prints the assent as "7th March, 2007", probably a misprint for 2008); the Arunachal Pradesh Urban and Country Planning (Amendment) Ordinance, 2025 (Ordinance No. 5 of 2025; date of promulgation not legible [TBC]); an amending Bill reported passed by the Assembly on 9 March 2026 (as reported; Act number, assent and final text not found [TBC]); the Master Plan of Itanagar Capital Region-2031 (approved under s.24 on 3 June 2022; Notice of approval of 30 June 2022) Continue. "Building operations" include changes affecting "drainage or sanitary arrangements", and amenities include "sewerage, drainage, public works and other utilities"; Local Planning Authorities are bodies corporate (s.10(2)), among them the Itanagar Planning Authority, chaired by the Deputy Commissioner, Itanagar Capital Complex. The Ordinance adds Town Planning Schemes, land pooling and local area plans; a scheme may include "the filling-up or reclamation of low-lying, swampy or unhealthy area, or levelling-up of land" and "drainage, inclusive of sewerage, surface or sub-soil drainage and sewage disposal"; it defines a "sponge city" as "an area that acts like a sponge, soaking up and retaining water during rain and storms and releasing it slowly", and lets the Government "prepare policy documents for … Sponge City … Risk Informed master Plan" (new s.71(2)(za)). These provisions are cited from the Ordinance; whether and in what form the amending Act keeps them was not found [TBC]. The master plan of the Itanagar Capital Region finds "no proper storm water network for the overall town area", existing drains "not engineered … open drains or kutcha drains without any flow gradient", "only 3.7% storm drains along main roads" and "storm water drains being used as sewers", and proposes a new drainage network (Maps 28–30) and a sewage treatment plant near the Dikrong, with no design storm, return period or runoff coefficient; the report read is titled "Draft" [TBC]. No master plan or drainage plan for Pasighat was found [TBC]. Plans and schemes would show the flood-sensitive catchments, drainage reserves and regional facility sites of this Manual (Chapter 11), and this Manual's compensatory-storage rule applies to reclamation under a scheme.
Arunachal Pradesh (Land Settlement and Records) Act, 2000 (Act No. 10 of 2000), as amended in 2018 (s.1A, as reported); Constitution of India, Article 371H Apply as they stand. The Act provides "a comprehensive law for land revenue administration for the whole of the State of Arunachal Pradesh incorporating customary rights on the land", commences by notification for different areas (s.1(3)), and defines "common land", "community" (including "a clan, sub-clan, kindred"), "competent authority" ("any officer appointed by the Government"), "Government land" (land acquired "or through donation of the public" for administrative purposes) and "improvement" (including "works for the drainage of" land) (s.2); the beds of rivers, streams, nallahs, lakes and tanks and "all standing and flowing water" are the Government's only where they "are not the property of any person or community" (s.9(1)). Article 371H gives the Governor special responsibility for law and order and does not protect customary law or land (as quoted); the State has no Sixth Schedule area. This Manual takes no land: its corridors and setbacks are conditions of building permission and layout approval wherever the bye-laws apply and recommendations elsewhere, and land for public drains is secured by agreement with the owners or the community, by donation, by purchase, or by reservation in a plan or scheme; the route of s.104 of the 2007 Municipal Act is stated, not invoked.
Official language English is the language of the State's laws and administration and of this Manual (as reported; no Act was checked for this Manual).
Floodplains, waterbodies, springs and wetlands: no State law found; APBBL 2019 Annexure E 1.8 and Chapter 12; the Wetlands (Conservation and Management) Rules, 2017, with the State Wetland Authority (as reported; its exact name and notification [TBC]) No floodplain zoning Act or Bill, and no statute or bye-law protecting a stream, nallah, spring, pond or wetland with a numerical buffer, was found; no flood zone exists in law. The bye-laws' Chapter 12 lists "sacred groves, hills, hillocks, water bodies (and the areas adjoining the same)" among natural features to be "listed in notification(s) … / identified in Master Plan"; none was found listed. No wetland notified under rule 4 was found; Glaw Lake was announced as a Ramsar site on 3 August 2026 (as reported). The first Water Bodies Census counts 993 water bodies in the State, none encroached (as summarised). The corridors and the spring rule of Chapter 7 are this Manual's proposals.
National Green Tribunal: OA 94/2020/EZ, S. D. Loda v. Union of India & Ors. (the Senki, the Pachin and the Dikrong); OA 606/2018 (State affidavit-cum-six-monthly report, 2025; amicus observations of 20.03.2026); OA 148/2025/EZ (Dibang muck); Gauhati High Court, Itanagar Bench: PIL 22(AP)/2018 (municipal elections; judgment 28.09.2018), PIL 21/2021 and the road PIL of 2024 (both as reported) Apply as directions where they bind; none sets a design standard or a setback. On 5 January 2023 the Tribunal directed in OA 94/2020/EZ that "no untreated sewage or treated sewage be allowed to enter into the waterbody", with quarterly monitoring by APSPCB, and on 8 April 2025 asked the State and the Itanagar Municipal Corporation to file counter-affidavits on faecal sludge treatment (as summarised). In OA 606/2018 the observations quoted in the State's affidavit say that "no ULB is treating sewage. Even the state capital, Itanagar-Naharlagun, lacks a sewage treatment facility". In the Itanagar Bench, PIL 21/2021 directed IMC to fine littering, and the 2024 PIL gave PWD (Highways) two months to repair the Itanagar–Jullang–Naharlagun–Nirjuli road (as reported). No order on the capital's drains, earth cutting or landslides was found. Sewage in storm drains is dealt with in Chapter 8.
Groundwater: no State rule found Continue. The State's stage of groundwater extraction is 0.39% (CGWB, 2024, as summarised), so recharge is not a design objective of this Manual (Clause 4.11, recharge rule). No State observation-well network was found; the network is CGWB's [TBC].
Environment (Protection) Act, 1986; Water (Prevention and Control of Pollution) Act, 1974; the Arunachal Pradesh State Pollution Control Board (APSPCB) Continue. CPCB lists four stretches in the State, all Priority V and first listed in 2025: the Namchik at Kharsang, the Senki at Chandranagar, Itanagar (upstream of the Pachin), the Dibang at Roing and the Subansiri at Gerukamukh; the Pachin itself is not listed (CPCB, 2025). Sewage in storm drains is dealt with in Chapter 8.
Disaster Management Act, 2005; the Arunachal Pradesh State Disaster Management Authority (APSDMA), the Department of Disaster Management, the Deputy Commissioners and the District Disaster Management Authorities Continue. No "Disaster Prone Area" norms under APBBL 2.10.1(f) and no order of the State fixing a date for pre-monsoon desilting were found; the works calendar of Chapter 10 sets this Manual's dates, beginning with 31 March.
The drainage master plan for the Itanagar Capital Region (expression of interest of 31 October 2017; a consultant's plan reviewed in June 2021, as reported) and the State Action Plan on Climate Change (draft, 2011) Neither was found adopted, and neither states a design storm. The Action Plan budgets "Storm water draining in twenty six urban settlements" at Rs 15,000.0 million with no criteria; that is a budget line, not a design basis. A drainage master plan, once adopted, would be carried into Chapter 11.
IRC:SP:42-2014, IRC:SP:48 (Hill Road Manual) and the practice of PWD and PWD (Highways) on hill-road drainage; PMGSY's rule that "a drainage plan" be prepared "for each rural road project" (as cited by CAG) Apply to the drainage of hill roads, cross-referenced from Chapter 6, where they do not conflict with it; the drainage clauses of IRC:SP:48 were not read for this Manual [TBC]. CAG found ₹46.15 crore spent on 49 km of rural roads "wherein no drains were constructed" (CAG, Audit Report 2022-23).
CPHEEO Manual on Storm Water Drainage Systems (2019) Engineering reference. This Manual sets higher return periods under Clause 1.3.2.
NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF.
NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create.
IRC:SP:42-2014 and IRC:SP:50-2013 Apply to road drainage only where they do not conflict with Chapter 6.
MBBL 2016, Chapter 9 Model for RWH and for the inspection regime in Chapter 10.

Commentary. RWH in Arunachal Pradesh is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the monsoon, because RWH sumps are usually full or the ground saturated by the time a July to September monsoon storm in the foothills, such as those of 11 July 2017 at Laptap and September 2018 at Itanagar, arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.

Arunachal Pradesh is planning and spending on its town drains, but without a design basis. The State Action Plan on Climate Change (draft, 2011) budgets "Storm water draining in twenty six urban settlements" at Rs 15,000.0 million with no design criteria; the Department of Town Planning and ULBs invited expressions of interest in October 2017 for a "GIS based Integrated Drainage Master Plan and DPR for Itanagar Capital City" over 65 km², with a horizon year of 2038 and no return period stated; a plan prepared by a consultant was reviewed by the Chief Minister in June 2021, who asked for "a GIS-based and scientifically approved drainage master plan" with trial sectors in Itanagar and Naharlagun (as reported); a storm-water drainage and seepage-management project for Itanagar had its foundation stone laid in June 2018 (as reported); the Itanagar Municipal Corporation sought central funds for 64 km of integrated drains (as reported, undated); and the Itanagar and Pasighat Smart City companies list storm-water drains among their works, Pasighat's with "improperly constructed drainage systems" noted by its Member of Parliament (as reported). The adoption of the drainage master plan was not found, and none of the documents found states a design storm, return period or runoff coefficient. The Comptroller and Auditor General found that three rural road projects costing ₹47.70 crore were taken up "without provision of drain", with "₹46.15 crore on construction of 49 Km roads wherein no drains were constructed", although "It is mandatory under PMGSY to have a drainage plan prepared for each rural road project" (CAG, Audit Report 2022-23). No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.

The State's law holds more of the tools than most. The APBBL 2019 apply to the whole State (2.1); ask the site plan to show existing drains and a distance from the nallah or stream (2.10.1(j), (e)) and a certificate of supervision of "drainage/sanitary works" (2.10.10); refuse earth cutting where the average slope exceeds 30% (4.39(14)); let the Authority require roof water to be connected to a drain (4.19.1.1); bar septic effluent from open drains (4.16.2(c)); ask public open spaces of more than 500 m² for "Artificial or natural Storage of storm water runoff from larger sites" (9.6); and ask large sites to keep at least 20% of their recreational open space unpaved and the "inlet and outlet point of natural drain system" open (Table 14.1). The Arunachal Pradesh Municipal Act, 2007 makes "drainage and sewerage" a core municipal service (s.47(1)(a)) and requires a municipality to "construct and maintain drains and sewers, and provide a safe and sufficient outfall … for … proper discharge of storm-water and sewage … in such manner as may not cause any nuisance, whether by flooding" (s.194); the Arunachal Pradesh Municipal Corporation Act, 2019 makes "the maintenance and cleaning of drains and drainage works" an obligatory function (s.60(a)), vests the public drains in the Corporation (s.200) and keeps foul water out of drains provided for surface water where separate drains exist (s.203). The Arunachal Pradesh Urban and Country Planning Act, 2007 makes Local Planning Authorities bodies corporate (s.10(2)) and counts "drainage" among the amenities a plan provides; the master plan of the Itanagar Capital Region, approved on 3 June 2022, proposes a new drainage network for Itanagar and Naharlagun (Maps 28–30); and Ordinance No. 5 of 2025 adds Town Planning Schemes, whose contents include "drainage, inclusive of sewerage, surface or sub-soil drainage and sewage disposal", and defines a "sponge city" as "an area that acts like a sponge, soaking up and retaining water during rain and storms and releasing it slowly". The courts and the tribunal have acted on the rivers: the National Green Tribunal directed on 5 January 2023, in OA 94/2020/EZ on the Senki, the Pachin and the Dikrong, that "no untreated sewage or treated sewage be allowed to enter into the waterbody" (as summarised). What the law lacks is a design standard. None of these instruments says how large a drain must be, which storm it must carry, how much water a hill site may put into its slope, how far a building must stand from a stream, nallah or spring, or how much storage a paved plot removes; and the master plan designs its proposed network on the "topography of the region and flow gradient", with no design storm. This Manual's checks are framed as part of the permission given by the competent authority for the area under the APBBL 2019, not as a separate no-objection certificate. This Manual is offered as a technical companion to these instruments, to the orders of the tribunal and to the drainage works of the towns: it supplies the design storm, detention, hill-site drainage, infiltration and corridor numbers they do not set, and its storage-first rules are an engineering form of the Ordinance's sponge-city definition, as a proposal for the Government, the urban local bodies, the planning authorities and the communities to consider. It is not a policy document under the Ordinance, and none under section 71(2)(za) was found. Neither the Department of Urban Affairs, the Itanagar Municipal Corporation, the Pasighat Municipal Council, the Itanagar Planning Authority, the Water Resources Department nor any other body has adopted it.


1.9 Roles and responsibilities

1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.

Table 1.4 — Roles and responsibilities under this Manual

Agency Role under this Manual
Department of Urban Affairs (Urban Affairs; formerly the Department of Town Planning and ULBs, "Re-named as Department of Urban Affairs in 2021"), with its Urban Development, Town Planning, Housing and Urban Local Bodies wings Its functions include "Storm Water Drains; Drainage; Sewerage; Septage Management"; a works department since 2005, with a Chief Engineer and 28 divisions, it builds storm drains, sewerage and septage works and hands them to the urban local bodies (department website). Its Town Planning wing (the Directorate of Town Planning) issued the APBBL 2019, administers the Arunachal Pradesh Urban and Country Planning Act, 2007, prepared the master plan of the Itanagar Capital Region and invited the drainage master plan of 2017. Could carry this Manual into the five-year review of the APBBL 2019 (2.2), notify its 15 m corridor as the "norms" of 2.10.1(e), carry the flood-sensitive catchments, drainage reserves, 1% AEP areas and regional facility sites into master plans and Town Planning Schemes, design its drainage works to this Manual, and give regional support to Tier B authorities (Table 1.1), if the Manual were adopted.
The Authority under the APBBL 2019 (the Director/Chief Town Planner of Town Planning & Urban Local Body, "till an executing authority is notified", definition 12) and its Building Permission Committees Grants building permits and earth-cutting permission (4.39) throughout the State, through the Online Building Permission System since 30 July 2025 (as reported). Would require the drainage report of Chapter 10 with each application, make the hill rule and the corridor of this Manual conditions of permission, and inspect and enforce (Clauses 10.12–10.15).
State Stormwater Technical Committee (Clause 1.3.2) Would set the higher standards of Clause 1.3.2, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12).
Itanagar Municipal Corporation (IMC) (Arunachal Pradesh Municipal Corporation Act, 2019) Holds the public drains, sewers, streams and springs of its area (s.200; vesting of "all public streams, springs and works for the supply … of water"), with "the maintenance and cleaning of drains and drainage works" an obligatory function (s.60(a)), and controls connections to its drains (s.203). Twenty wards; councils elected in 2021 and 2026 (as reported); a respondent in NGT OA 94/2020/EZ. The notification constituting it under sections 3 and 4 was not found [TBC]. Would apply this Manual to its own works and to drain connections, keep the drain register of its area, receive handed-over assets (Clause 10.14), and could make bye-laws under the 2019 Act.
Pasighat Municipal Council (Arunachal Pradesh Municipal Act, 2007) Holds the public drains, tanks and streams of its area (s.102, "Notwithstanding anything contained in any other law"), with "drainage and sewerage" a core service (s.47(1)(a)) and the duty to "construct and maintain drains and sewers, and provide a safe and sufficient outfall" (s.194); sanctions buildings through its Municipal Building Committee (ss.340–343). Area 10.21 km² (2010 notification); 8 wards (as reported). Would require the drainage report of Chapter 10, apply this Manual to its works, keep the drain register of its area and could act under sections 194 to 196.
The Itanagar Planning Authority and the other Local Planning Authorities (Arunachal Pradesh Urban and Country Planning Act, 2007), and the Deputy Commissioner, Itanagar Capital Complex, as chairman of the Itanagar Planning Authority Prepare master plans and approve layouts (APBBL 2.10.3) and, under Ordinance No. 5 of 2025, Town Planning Schemes; notifications of Local Planning Authorities for Ziro, Namsai, Raga, Anini, New Sagalee, Tuting and Nafra are listed on the Town Planning portal (file titles, as summarised). Could carry the drainage reserves, flood-sensitive catchments and storage sites of this Manual into plans, layouts and schemes, and apply its compensatory-storage rule to the "filling-up or reclamation of low-lying, swampy or unhealthy area" that a scheme may include.
The Itanagar and Pasighat Smart City companies Build works under the Smart Cities Mission, among them storm-water drains (as reported; company names and drain DPRs not read [TBC]). Would design their drainage works to this Manual from the dates of Clause 1.11 and hand them over under Clause 10.14.
Water Resources Department (WRD) Builds and maintains river and anti-erosion works, among them the Siang schemes for the Mebo villages (as reported). Would supply river levels and flood marks for Chapter 5, consent to any work in or on a river, and apply this Manual to its works. Its works on rivers keep its own calendar. Holds the groundwater role of this Manual (WRD); no State observation-well network was found [TBC].
Public Health Engineering and Water Supply Department (PHED) Develops and operates water supply, with intakes on the Senki, the Poma and the Niorch for Itanagar (master plan); not researched for this Manual [TBC]. Would protect the spring-recharge areas above its intakes and keep its works clear of the drains of Chapter 8.
Public Works Department (PWD) and PWD (Highways) Build and maintain the roads, among them NH-415 between Itanagar and Naharlagun, with their side drains, catch-water drains and culverts, which in the hill towns are much of the minor drainage system (as reported). Would apply Chapter 6 and the hill-road rules to them and never discharge a road drain onto an unprotected slope.
The Arunachal Pradesh State Disaster Management Authority (APSDMA), the Department of Disaster Management (DDM) and the State Emergency Operation Centre, the Deputy Commissioners and the District Disaster Management Authorities, and the land revenue offices of the Deputy Commissioners Prepare for and respond to floods and landslides and report their tolls (DDM's daily situation reports and the Centre's damage reports, as reported; APSDMA's own documents not read [TBC]). Would supply the landslide, flood and glacial-lake inventories used in the screening of Clause 2.3.6(i), set the "Disaster Prone Area" norms that APBBL 2.10.1(f) anticipates, and lead post-event reviews with the Authority (Clause 10.16). The land revenue offices hold the records of settled land; most community and clan land is not in any register.
Arunachal Pradesh State Pollution Control Board (APSPCB) Monitors the Senki, the Pachin and the Dikrong, quarterly under the Tribunal's order (as summarised). Would receive the records of sewage found in storm drains under Chapter 8.
Department of Environment, Forest and Climate Change and the State Wetland Authority (as reported; its exact name and notification [TBC]) Truthed and demarcated the State's wetlands; administer the Wetlands Rules, 2017; no wetland has been found notified under rule 4. The Authority's consent would be needed before a notified wetland is used for storage or as an outfall (Chapter 7).
NEEPCO (the Pare, Ranganadi and Kameng projects) and NHPC (the Lower Subansiri project, and the Dibang project under construction) Operate the dams and their gates, whose releases set the river in the reaches below them. Operators, not approving authorities: would supply reservoir levels, release records and release protocols, none of which was found [TBC], for Chapter 5 and the screening of Clause 2.3.6(i).
Communities, clans and village authorities on their own land Hold much of the land near the towns on which streams, nallahs, springs and corridors lie (Land Settlement and Records Act, 2000). This Manual has no force on community or clan land unless a permission or a plan carries it or the community adopts it: a community could agree drainage corridors, easements and facility sites on its land (Chapter 7), by agreement, donation or sale, and keep its drains and springs clear.
Central Water Commission (CWC), a body of the Union Publishes the Flood Estimation Reports for subzones 2(a) and 2(b) used in Chapters 2 and 3, and runs the gauges at Pasighat, Namsai, Tezu, Yazali and other sites (as transcribed by SANDRP). Would supply stage records with their datum for Chapter 5 and say whether any revision of the 2(a) report extends its isopluvials into the hills.
Central Ground Water Board (CGWB), North Eastern Region, a body of the Union Assesses the State's groundwater (stage of extraction 0.39% in 2024, as summarised) and holds the observation wells. Would supply groundwater levels and quality with WRD.
IMD (the Meteorological Centre Itanagar) and NERIST, Nirjuli; road and rail owners IMD's stations and the automatic stations of its Itanagar centre supply the rainfall records of Chapter 2; NERIST's daily gauge at Doimukh (1988–2012) is the basis of the capital-region table of Clause 2.3.6(c)(ii); both are first data requests of Clause 2.3.6(a). Road and rail owners would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7).

Commentary. Stormwater in Arunachal Pradesh is split, first, by land. The APBBL 2019 apply to the whole State, and the Authority under them grants building permits and earth-cutting permission everywhere; in the two municipal areas the Itanagar Municipal Corporation and the Pasighat Municipal Council hold the public drains under their Acts; in a Local Planning Area the Local Planning Authority approves layouts and plans. But much of the land near the towns is held by communities, clans and individuals, with customary rights recognised in the Land Settlement and Records Act, 2000, and the beds of streams and nallahs on that land are not Government property (s.9(1)). The split is then repeated among the bodies that drain the land: the Department of Urban Affairs and the Smart City companies build drains, sewerage and septage works and hand them to the urban local bodies; PWD and PWD (Highways) build the road drains that are much of the minor system in the hill towns; WRD holds the rivers; PHED the water supply; and NEEPCO and NHPC the dams whose releases set the rivers below them. The capital shows why the split matters. Its drains "end up mostly into the Nallah and in some cases, into local ponds or open fields", "Most of the surface water and sewerage gets mixed up resulting in storm water drains being used as sewers", and "no scheme or work for storm water drains is under execution" (master plan of the Itanagar Capital Region). Both municipal Acts vest the public drains in the urban local body and make drainage its duty (2007 Act, ss.47, 102, 194 and 196; 2019 Act, ss.60(a) and 200), but no notification divides the drains of any Arunachal Pradesh town among their owners (NEER reading). Until the State issues such a rule [TBC], this Manual assigns the drainage elements as in Table 1.5, as Chapter 6 does for the drains themselves, and recommends that each town keep a drain register giving every reach its owner under this split, its land status (community, clan, individual, municipal or Government land), whether it carries sewage or septic overflow, and its outfall (set by this Manual). The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers, and on community, clan or private land it is put into effect by agreement with the owners or the community, not by acquisition.

Table 1.5 — Working assignment of drainage elements under this Manual

Element Assigned to
Public drains, sewers, culverts and watercourses in or under streets, and public streams and springs, within the area of the Itanagar Municipal Corporation IMC (Arunachal Pradesh Municipal Corporation Act, 2019, s.200 vesting; s.60(a) "the maintenance and cleaning of drains and drainage works"; s.203 connections)
The same within the Pasighat municipal area The Pasighat Municipal Council (Arunachal Pradesh Municipal Act, 2007, s.47(1)(a)(ii); s.102 vesting "Notwithstanding anything contained in any other law"; s.194 drains and outfalls; s.196)
Storm drains, sewerage and septage works built by the Department of Urban Affairs or the Smart City companies The builder, until handed over in writing to the urban local body
Roadside drains, culverts and scuppers of State roads and of NH-415 PWD and PWD (Highways)
Rivers, their beds and banks, and anti-erosion works The WRD
Water supply PHED (not researched [TBC])
Dams, reservoirs and their release reaches NEEPCO and NHPC (operators)
Drains on community or clan land outside an urban local body The community (no statutory owner)

This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.


1.10 Variances and waivers

1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:

  • (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
  • (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.

1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Arunachal Pradesh has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to a nallah backed up by the Dikrong, to the Siang, the Lohit or the Noa-Dihing at Pasighat, Tezu or Namsai, to a reservoir or its release reach, or to any river in flood, is in the outfall-closed condition of Chapter 5 whenever the receiving water is high, and detention is not waived for it; nor is it waived for a site because it drains to a steep stream or nallah in the hills.

1.10.3 No variance or waiver. No variance or waiver shall be granted for:

  • (a) a sewage connection to a storm drain;
  • (b) the lowest habitable floor level of Chapter 6;
  • (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
  • (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.

1.10.4 Procedure.

  • (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
  • (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
  • (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
  • (d) A variance runs with the approval. It lapses if the approval lapses.

Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Arunachal Pradesh no statute or bye-law sets a numerical setback from a stream, nallah, spring or drain: the Arunachal Pradesh Building Bye-Laws, 2019 ask the site plan to show the "Distance from Nallah/Stream as per the notified rules/norms" (2.10.1(e)), but no such rules or norms were found, and the master plan of the Itanagar Capital Region reports that the 2017 floods badly damaged the "land protection wall of several nallahs and rivulets" and that the Pachin, "flowing through densely populated areas", had "become a waste disposal site".


1.11 Transition provisions

1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).

1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.

1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.

1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.

1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.

Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).


1.12 Review and amendment

1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.

1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.

1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.


References (chapter)

  • Department of Town Planning and ULBs, Government of Arunachal Pradesh. Arunachal Pradesh Building Bye-Laws, 2019 (the "Gazette Notification" page of the copy read is blank: notification number, date and gazette reference [TBC]). http://arunachaltp.nic.in/sites/default/files/APBuildingByelaws2019.pdf (Wayback Machine capture of 20 November 2020)
  • Directorate of Town Planning, Government of Arunachal Pradesh. Arunachal Pradesh Building Byelaws – 2009, "FINAL DRAFT" (not in force; cited for the hill-site clause only). http://arunachaltp.nic.in/sites/default/files/files/AP_Building_Bye_Laws.pdf
  • Government of Arunachal Pradesh. Arunachal Pradesh Fire and Emergency Services Act, 2026 (Act No. 12 of 2026), s.2(c). https://prsindia.org/files/bills_acts/acts_states/arunachal-pradesh/2026/Act12of2026AR.pdf
  • Government of Arunachal Pradesh. Arunachal Pradesh Municipal Act, 2007 (Act No. 4 of 2008; Notification No. LAW/LEGN-21/2007, 19 March 2008; Gazette Extraordinary No. 23, Vol. XV, 19 March 2008). http://arunachaltp.nic.in/sites/default/files/files/AP_Municipality_Act_2007_2.pdf
  • Government of Arunachal Pradesh. Arunachal Pradesh Municipal Corporation Act, 2019 (Act No. 8 of 2019; Notification No. Law/Legn-4/2019, 30 September 2019; Gazette Extraordinary No. 373, Vol. XXVI, 1 October 2019). https://prsindia.org/files/bills_acts/acts_states/arunachal-pradesh/2019/Act%208%20of%202019%20Arunachal%20Pradesh.pdf
  • Government of Arunachal Pradesh. Notifications of the Itanagar municipal area (No. DTPMUN-02/2008-2009, 14 September 2010; Gazette Extraordinary No. 124, Vol. XVII, 20 September 2010) and the Pasighat municipal area (No. DTPMUN-43/2010-2011, 24 August 2010; Gazette Extraordinary No. 112, 25 August 2010). The notification constituting the Itanagar Municipal Corporation under sections 3 and 4 of the 2019 Act was not found [TBC].
  • Government of Arunachal Pradesh. Arunachal Pradesh Urban and Country Planning Act, 2007 (Act No. 3 of 2008; Notification No. LAW/LEGN-6/2007, 11 March 2008; Gazette Extraordinary No. 18, Vol. XV, 14 March 2008; the copy prints the Governor's assent as "7th March, 2007", probably a misprint for 2008). https://prsindia.org/files/bills_acts/acts_states/arunachal-pradesh/2008/Act3of2008AR.pdf
  • Government of Arunachal Pradesh. Arunachal Pradesh Urban and Country Planning (Amendment) Ordinance, 2025 (Ordinance No. 5 of 2025; date of promulgation not legible in the copy read [TBC]); the amending Bill reported passed on 9 March 2026 (as reported; Act number, assent and final text not found [TBC]). https://prsindia.org/files/bills_acts/bills_states/arunachal-pradesh/2025/Ord5of2025AR.pdf
  • Government of Arunachal Pradesh. Arunachal Pradesh (Land Settlement and Records) Act, 2000 (Act No. 10 of 2000), ss.1(3), 2 and 9(1) (scanned copy; amendments not consolidated); the amendment of 2018 inserting s.1A (as reported). https://faolex.fao.org/docs/pdf/ind193861.pdf
  • Constitution of India, Article 371H (inserted by the Constitution (Fifty-fifth Amendment) Act, 1986; as quoted from constitutionofindia.net).
  • Department of Urban Affairs, Government of Arunachal Pradesh. Website: history ("Re-named as Department of Urban Affairs in 2021"), wings and functions. https://udarunachal.gov.in/
  • Gauhati High Court, Itanagar Bench. PIL 22(AP) of 2018, Kali Bogo v. State Election Commission & Ors., judgment of 28.09.2018. https://ghcitanagar.gov.in/ghcita/new/2018/PIL%20No.%2022%20(AP)%202018.pdf
  • National Green Tribunal. OA 94/2020/EZ, S. D. Loda v. Union of India & Ors. (orders of 18 August 2022, 5 January 2023 and 8 April 2025, as summarised by the India Environment Portal); OA 606/2018, affidavit-cum-six-monthly report of the State of Arunachal Pradesh (2025) and observations of the amicus curiae dated 20.03.2026; OA 148/2025/EZ, reply of CPCB dated 5 January 2026. https://www.greentribunal.gov.in/
  • Comptroller and Auditor General of India. Audit Report for the year ended 31 March 2023, Government of Arunachal Pradesh, Chapter III (PMGSY). https://cag.gov.in/
  • Central Pollution Control Board (2025). Polluted River Stretches for Restoration of Water Quality.
  • Department of Environment, Forest and Climate Change, Government of Arunachal Pradesh. Status of Truthing and Boundary Demarcation of Wetland of Arunachal Pradesh (undated).
  • Central Ground Water Board, North Eastern Region. Ground Water Information Booklets: Papum Pare, East Siang, Lohit, Changlang, West Kameng and Tawang districts; Dynamic Ground Water Resources, 2024 (as summarised [TBC]).
  • Press reports of the Online Building Permission System (30 July 2025), the Itanagar Municipal Corporation's councils (2021 and 2026), the Smart City works, the 2018 amendment of the Land Act, the Ganga Lake and Glaw Lake reports, and the amending planning Bill (March 2026) (secondary sources).
  • MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Table 4.1 and notes).
  • Kakkar, R. (CPHEEO) (2023). Understanding Urban Stormwater Management. CSE, Aug 2023.
  • National Disaster Management Authority (2010). National Guidelines on Management of Urban Flooding.
  • MoHUA (2016). Model Building Bye-Laws, Chapter 9.
  • Lok Sabha Unstarred Question 1847, 30 Jul 2026 (MoHUA). https://sansad.in/getFile/lsapps/loksabhaquestions/annex/188/AU1847_x29brZ.pdf
  • India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012): Pasighat (A) (42220), Tezu (01203), Hayuliang (01212) and Ziro ("Zero", 42312). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
  • South Asia Network on Dams, Rivers and People (2019). Overview of CWC's flood forecasting sites 2019: North East India (transcriptions of CWC data, including the Pasighat level of 11 June 2000; secondary source). https://sandrp.in/2019/10/02/overview-of-cwcs-flood-forecasting-sites-2019-north-east-india/
  • Analyses of the Yigong landslide-dam outburst of June 2000 (peer-reviewed analysis as summarised; AGU Landslide Blog, SANDRP and press accounts; secondary sources).
  • Press reports of the Laptap landslide (July 2017), the Modirijo and Donyi Polo floods (September 2018), the Siang turbidity of November 2017, the Itanagar events of June and July 2024, the Remal storm (May 2024), the floods and landslides of late May–June 2025, the Poosa / NEEPCO colony flood at Yazali (June 2025 or 2026) and the Department of Disaster Management's situation reports of 2026 (secondary sources). https://www.downtoearth.org.in/
  • Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
  • Mid-America Regional Council (2025). APWA 5600 Manual Factsheet; APWA Stormwater Standards Supplement (7 Nov 2025). https://www.marc.org/document/apwa-stormwater-standards-supplement
  • Mid-America Regional Council. The Evolution of Regional Stormwater Design Standards (presentation). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
  • Kansas City Metro Chapter APWA (2006). Section 5600, §5601.6 Waivers.
  • PUB Singapore (2018, with Addendum No. 3 of 16 Apr 2025). Code of Practice on Surface Water Drainage, 7th ed.
  • Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management.
  • Centre for Science and Environment (2023). Urban Stormwater Management (presentation).
  • Directorate of Town Planning, Government of Arunachal Pradesh. Master Plan of Itanagar Capital Region-2031: Notice of approval (Form-II, File No. TP-ULB-21011/3/2021-DirTPULB [E-31358], 30 June 2022; approval No. TP-ULB-21011/3/2021-Dir-TP-ULB (E-31358) dated 3 June 2022); and the "Draft Master Plan Report for Itanagar Capital Region, GIS Based Master Plan under AMRUT Scheme" (whether the approved text differs from the draft was not checked [TBC]). https://arunachaltp.nic.in/sites/default/files/Notification%20of%20Itanagar%20Master%20Plan%202031.pdf
  • Department of Town Planning and ULBs. Expression of Interest, "Preparation of GIS based Integrated Drainage Master Plan and DPR for Itanagar Capital City" (File No. DTP/MP-76/2015-16, 31 October 2017). http://arunachaltp.nic.in/docs/tender/EOI-%20Drainage%20Master%20Plan.pdf
  • Integrated drainage master plan for the Itanagar Capital Region reviewed in June 2021 (as reported; not seen; adoption not found [TBC]).
  • Government of Arunachal Pradesh. Arunachal Pradesh State Action Plan on Climate Change (draft, July 2011).

Annexes and forms

Annex / Form Content
1A List of Tier A authorities, with the boundaries of the Itanagar Municipal Corporation area and of the Master Plan of Itanagar Capital Region-2031
1B Maps of flood-sensitive catchments
1C Policy Supplement: text of alternatives S-1 to S-5 and model council resolution
1D Model APBBL 2019 amendment and model ULB bye-law
Form 1-1 Applicability Determination
Form 1-2 Variance / Waiver Request