Draft v1.0 prepared by NEER. Not adopted by the Government of Arunachal Pradesh or any authority, local body or community, and has no legal force. About this draft

Annexes to Chapter 2Design Rainfall and Design Storms

These annexes support Chapter 2. Annexes 2A to 2E will hold the statewide rainfall tables that Chapter 2 refers to: the benchmark checks and zone map, sub-daily ratios, grid-to-point factors, temporal patterns and retention depths. Each needs analysis of NIH-DHAARA and IMD records that has not yet been done for this Manual, so each is marked "To be prepared" and gives its intended layout and the rule to use until it is published (Clause 1.11.5). Form 2-1 is a draft form for the Design Rainfall Sheet that every hydrologic submittal must include (Clause 2.13). The Manual is a draft; it is not adopted by any government or agency.


Annex 2A — NIH-DHAARA vs IMD station and IMD gridded checks at benchmark points; zone map

Supports Clauses 2.3.1 to 2.3.5 of Chapter 2.

To be prepared. This annex will compare, at benchmark points across the State, the NIH-DHAARA design depths with frequency analyses of long IMD daily station records and of IMD gridded daily data (converted to point values with Annex 2C), for 24 hours and longer and for the AEPs of Table 2.1. It will also contain the map of rainfall zones used by Annexes 2B, 2C and 2E and by the Tier B tables of Chapter 4. It needs NIH-DHAARA values at the benchmark coordinates (NIH), IMD daily and recording-gauge station records and IMD gridded rainfall (IMD), State rain-gauge records (the IMD stations of IMD's Extremes in the State, Pasighat (A) (42220, rainfall data 1916–2012), Tezu (01203, 1969–2012), Ziro ("Zero", 42312, 1965–2012 as printed) and Hayuliang (01212, 1971–1985), the automatic weather stations and automatic rain gauges of the Meteorological Centre Itanagar, whose list and archive were not obtained, the daily gauge of the NERIST meteorological laboratory at Doimukh, 1988–2012, and any gauges of APSDMA, the Department of Disaster Management or the Smart City companies [TBC]), and district and basin boundaries (Survey of India, WRD). Until it is published, design depths are taken from NIH-DHAARA under Clause 2.3.1, the cross-checks of Clause 2.3.3 are reported on Form 2-1, and the zone of a site is the one agreed with the Authority and recorded on Form 2-1.

Table 2A.1 — Benchmark comparison of design depths (layout)

Benchmark point IMD station ID Latitude, longitude Years of record Duration (h) AEP NIH-DHAARA (mm) IMD station analysis (mm) IMD gridded, point value (mm) NIH-DHAARA / IMD station Remarks
        24            
        48            
        72            

2A.1 The zone names below are the working names used in the Tier B table template of Chapter 4 (Clause 4.14.2). Their boundaries, and whether further zones are needed, are to be set by the analysis of this annex.

Table 2A.2 — Rainfall zones (layout)

Zone (working name) Extent (districts, basins) Representative stations Notes
AR-Z1 Western foothills The Siwalik foothills and valleys of the Dikrong, Pare, Ranganadi, Pakke and Kameng (Jia Bharali) and the Lower Subansiri foothills, from the State border to the last contour of the plates, in CWC subzone 2(a), North Brahmaputra, contoured (Clause 2.3.6(b)); part of the foothill domain of the record check (Clause 2.3.6(h)); catchments that cross a zone line take the higher zone value NERIST meteorological laboratory, Doimukh (daily, 1988–2012); the automatic stations of the Meteorological Centre Itanagar (list and record lengths [TBC]); North Lakhimpur (A) / Lilabari (42309) across the border, for context AR-A: the capital-region table of Clause 2.3.6(c)(ii); AR-A1: the plates, not below that table. Arunachal Pradesh interim ratios (Clause 2.3.6(f)) and the short-storm floors of Clause 2.3.6(g); 72-h = 24-h × 2.05. Siwalik sandstone, shale and boulder beds with residual soil and slope debris; intermontane valley sands; hill rule of Clause 4.11 on the slopes, floodplain and recharge rules on the valley floors
AR-Z1 Western foothills: AR-A Itanagar capital region (Itanagar–Naharlagun–Nirjuli–Doimukh–Banderdewa) The area of the Master Plan of Itanagar Capital Region-2031 and of the Itanagar Municipal Corporation: the Senki, the Pachin, Papu Nallah and the Dikrong, the hill slopes round the valley and the Dikrong reach below the Pare dam; boundaries [TBC] NERIST Doimukh (27°08′39″ N, 93°45′05″ E, 118 m; daily, 1988–2012); MC Itanagar automatic stations (first data request of Clause 2.3.6(a)) 24-h 135 / 175 / 205 / 240 / 265 / 290 mm at 50% / 20% / 10% / 4% / 2% / 1% AEP (Clause 2.3.6(c)(ii); NERIST lognormal 1-day × 1.13, rounded up to 5 mm). FER 2(a) plates at Itanagar about 180 / 200 / 240 mm (Plates 8 / 9 / 10), in an open "<200" cell with no contour north of the town (NEER reading; recorded, not used). NIH-DHAARA 472 / 528 mm at Itanagar and 409 / 458 mm at Naharlagun (50 / 100-yr), flagged, not used. 1-h at 2% / 1% AEP 95 / 105 mm after the floors of Clause 2.3.6(g). Annual normals in conflict: Itanagar 3,942.44 mm (CGWB, as summarised) and "2289 mm" (master plan, no source); Doimukh 3,531.8 mm (NERIST) and 3,251.67 mm (CGWB, as summarised). Records: NERIST 185 mm (1990; not an IMD gauge); IMD 40 mm in 2 h (23 Jun 2024, as quoted) and 52.0 mm "till 12:30" (27 Jun 2024, as summarised), flags only. Doimukh field soil 95.19% sand, basic infiltration 1 cm/h (Dabral et al., 2016); Dikrong valley water table 2–4 m below ground before the monsoon and 2–5 m after it (CGWB). Receiving waters: the Senki, the Pachin and the Dikrong, with the Pare releases and the Ranganadi tailrace; no CWC gauge
AR-Z1 Western foothills: AR-A1 Western foothills (Bhalukpong–Seijosa–Kimin–Yazali) The Kameng (Jia Bharali), Pakke and Ranganadi foothills and the Lower Subansiri foothills on the State border; the Ranganadi reach at Yazali; boundaries [TBC]; Seijosa and Yazali lie near zone lines, and the site's coordinates decide [TBC] No IMD station; MC Itanagar automatic stations [TBC] FER 2(a) 2% / 1% AEP 24-h: Bhalukpong 240 / 280 mm and Kimin 240 / 280 mm, at the open ends of the 240 and 280 lines (NEER reading, low confidence); Seijosa and Yazali not read [TBC]; not less than the AR-A table at every AEP (Clause 2.3.6(c)(i)), which therefore governs at both towns read. NIH-DHAARA 464 mm at Bhalukpong (50-yr), flagged. 72-h = 24-h × 2.05. Receiving waters: the Kameng at Bhalukpong (no gauge in the State); the Ranganadi below the Ranganadi project (CWC highest flood level 623.1 m at Yazali, 14 Jun 2008, as reported)
AR-Z2 Eastern foothills The bhabar fans and flood plains of the Siang, Dibang and Lohit north of the 2(a)/2(b) boundary, which leaves the Lohit at about Tezu, in subzone 2(a) at its edge, where the 2(b) contours also reach (Clause 2.3.6(b)); part of the foothill domain of the record check; catchments that cross a zone line take the higher zone value Pasighat (A) (IMD 42220, rainfall data 1916–2012); Tezu (IMD 01203, 1969–2012) The higher of the 2(a) and 2(b) plates (Clause 2.3.6(c)); Arunachal Pradesh interim ratios with the short-storm floors; 72-h = 24-h × 1.95. Bhabar boulder fans and flood-plain silts; floodplain rule of Clause 4.11; main stems whose stage is set upstream
AR-Z2 Eastern foothills: AR-B Siang–Dibang–Lohit foothills (Pasighat–Ruksin–Likabali–Roing–Tezu) Pasighat, Ruksin, Likabali, Roing and Tezu, the fans and flood plains of the Siang, Dibang and Lohit north of the 2(a)/2(b) boundary; boundaries [TBC] Pasighat (A) (IMD 42220); Tezu (IMD 01203) 2% / 1% AEP 24-h (NEER reading, low confidence): Likabali 440 / 520 mm (2(a) ">400" and ">480" cells); Pasighat 320 / 400 mm (2(a) blank; 2(b) at the open ends of the 320 and 400 lines); Roing 320 / 400 mm (2(a); 2(b) 280 / 320); Tezu 280 / 320 mm (2(a); 2(b) 240 / 280). Plate 8: Likabali 360, Pasighat 320, Roing 280, Tezu 240 mm. Record check (Clause 2.3.6(h)): within 25 km of the Pasighat gauge, not less than 652.2 / 612.2 mm at 1% / 2% AEP until IMD rules on the record (476.7 / 436.7 mm if it is withdrawn); within 25 km of the Tezu gauge, not less than 338.4 / 298.4 mm. NIH-DHAARA 657 mm at Pasighat, 726 mm at Roing and 515 mm at Tezu (50-yr), flagged. Records: Pasighat 652.2 mm (5 Oct 1988) [U], 476.7 mm (22 Aug 1988), 467.9 mm (11 Jul 1948; 467.0 mm in FER 2(a) Table 7); Tezu 338.4 mm (2 Jul 1974) (IMD). Annual normals: East Siang 2,910.18 mm, Lohit 5,179 mm (CGWB). East Siang water table 1.50–11.13 m below ground; Lohit 3.58 / 3.52 m (2008) (CGWB). Receiving waters: the Siang at Pasighat (CWC danger level 153.96 m, highest flood level 157.54 m, 11 Jun 2000, an outburst stage); the Lohit at Tezu (highest flood level 192.14 m, 16 Jul 1996); the Dibang at Roing (no CWC site) (CWC data as transcribed by SANDRP)
AR-Z3 South-east The Noa-Dihing and Burhidihing plain south of the Lohit and the Patkai hills of Changlang, Tirap and Longding districts, in subzone 2(b), South Brahmaputra (Clause 2.3.6(b)); the plain is part of the foothill domain of the record check and the hills part of the hill domain; catchments that cross a zone line take the higher zone value No IMD station in the State in IMD's Extremes; MC Itanagar automatic stations [TBC] FER 2(b) plates; the 2(b) ratios on the plain and the Arunachal Pradesh interim ratios in the hills (Clause 2.3.6(f)). Recent alluvium on the Bordumsa–Miao plain and older alluvium in the foothills (CGWB)
AR-Z3 South-east: AR-C Noa-Dihing plain (Namsai–Chowkham–Bordumsa–Miao) Namsai, Chowkham, Bordumsa and Miao, the plain south of the Lohit and the Noa-Dihing and Burhidihing flood plains; boundaries [TBC] No IMD station; MC Itanagar automatic stations [TBC] FER 2(b) 2% / 1% AEP 24-h: Namsai 280 / 320 mm (between the 240 and 280 lines on both Plates 9 and 10, so 1% = 2% + 40 mm); Miao 240 / 280 mm (NEER reading, low confidence); Plate 8 240 and 200 mm. 2(b) ratios: on Namsai's 280 mm about 134 mm in 1 hour at 2% AEP, against 92 mm in NIH-DHAARA's Namsai cell. 72-h = 24-h × 1.70. NIH-DHAARA 461 mm at Namsai (50-yr), flagged. Remal storm: Namsai 70 mm and Miao 120 mm in 24 hours to 29 May 2024 (IMD bulletin, as summarised; flags only). Receiving waters: the Noa-Dihing (CWC Namsai danger level 145.8 m, highest flood level 146.6 m; Miao highest flood level 241.57 m; as reported)
AR-Z3 South-east: AR-C1 Patkai hills (Changlang–Jairampur–Deomali–Khonsa–Longding) Changlang, Tirap and Longding districts above the plain; the Tirap and Burhidihing headwaters; the Myanmar and Nagaland borders; boundaries [TBC]; Jairampur and Deomali lie near zone lines [TBC] No IMD station; MC Itanagar automatic stations [TBC] Not less than 240 / 280 mm at 2% / 1% AEP (Clause 2.3.6(c)(i)); plate readings Jairampur 240 / 280, Changlang and Deomali 200 / 240 (in the closed "<200" pocket), Khonsa 240 / 280 (on its edge) and Longding 240 / 280 mm (NEER reading, low confidence). The adjoining Nagaland edition reads one contour higher across the Longding border; the plate governs on each side. NIH-DHAARA 233 / 260 mm at Khonsa and 261 / 293 mm at Changlang (50 / 100-yr), within about 10% of the floor. Arunachal Pradesh interim ratios; no short-storm floor; 72-h = 24-h × 1.75. Changlang annual normal 2,913.8 mm (3,800–4,866 mm in parts) (CGWB); hill rule of Clause 4.11
AR-Z4 Hills and high ranges The middle hills and high ranges of the Subansiri, Siang, Kameng, Dibang and Lohit basins and of Tawang, inside subzone 2(a) but beyond its last contour, where the plates are blank (Clause 2.3.6(b)); the hill domain of the record check; catchments that cross a zone line take the higher zone value Ziro ("Zero", IMD 42312; rainfall data 1965–2012 as printed, with large gaps); Hayuliang (IMD 01212, 1971–1985) No contour: floors of Clause 2.3.6(c)(iii). Arunachal Pradesh interim ratios; no short-storm floor. Gneiss and schist of the Bomdila Group and the higher ranges, thin soils, slope debris; rain-shadow valleys beside large single days; hill rule of Clause 4.11
AR-Z4 Hills and high ranges: AR-D Middle hills (Ziro–Daporijo–Aalo–Seppa–Basar–Yingkiong) Lower and Upper Subansiri, Kra Daadi, Kurung Kumey, Kamle, West Siang, Leparada, Siang, Upper Siang below the snow, East Kameng and Pakke-Kessang above the foothills; the NH-13 landslide corridor (district names as reported for 2024, not verified); boundaries [TBC] Ziro (IMD 42312) Not less than 280 / 320 mm at 2% / 1% AEP; at Ziro, at the open ends of the 2(a) 320 and 400 lines on the plateau edge, 320 / 400 mm (NEER reading, very low confidence), which governs there (Clause 2.3.6(c)(iii)). 72-h = 24-h × 1.90. NIH-DHAARA 308 mm at Ziro, 288 mm at Daporijo, 513 mm at Aalo and 351 mm at Seppa (50-yr), a bracket only. Ziro 150.7 mm (4 Feb 1974) excluded [U]. Receiving waters: the Subansiri at Daporijo (CWC highest flood level 213.9 m, 15 Oct 1987, as reported); the Siang at Yingkiong (danger level 304.0 m, as reported); steep streams and nallahs to free outfalls
AR-Z4 Hills and high ranges: AR-E High ranges (Tawang–Bomdila–Dirang–Mechuka–Anini–Hayuliang) Tawang, West Kameng above the foothills, Shi Yomi, Upper Siang above Tuting, Dibang Valley and Anjaw; snow in winter, glaciers and glacial lakes; boundaries [TBC]; Tuting and Hayuliang lie near zone lines [TBC] Hayuliang (IMD 01212, 1971–1985) Not less than 240 / 280 mm at 2% / 1% AEP (Clause 2.3.6(c)(iii)); snow-fed and glaciated catchments site-specific, with the outburst screening of Clause 2.3.6(i). 72-h = 24-h × 1.80. NIH-DHAARA 328 mm at Bomdila and 129 mm at Tawang (50-yr), a bracket only; Tawang's cell is not a safe minimum. Records: Hayuliang 280.0 mm (3 Oct 1979) and 278.5 mm (24 Apr 1980) (IMD; under 20 years of data, flags only); Bomdila 190 mm (29 May 2024, as summarised). Annual normals: Tawang about 1,600 mm, West Kameng 1,607 mm (CGWB). Glaciers: 52 (66 km²) in the Kameng basin, 91 (146 km²) in the Subansiri and 14 (11 km²) in the Dibang (State Action Plan on Climate Change); NDMA's high-risk glacial lakes: Tawang 6, Kurung Kumey 1, Shi Yomi 1, Dibang Valley 16, Anjaw 3 (as reported). Receiving waters: the Tawang Chu (to Bhutan), the Kameng, the Siang at Tuting (CWC highest flood level 420.43 m) and the Lohit at Kibithu (1,229.8 m) (as reported)

Annex 2B — Sub-daily ratios P(t)/P(24h) by zone: NIH-DHAARA (hourly-based) vs the one-third rule

Supports Clauses 2.6.1 to 2.6.4 of Chapter 2.

To be prepared. This annex will tabulate, for each zone of Annex 2A, the ratios of the t-hour to the 24-hour design depth from NIH-DHAARA, which are derived from hourly records, against the ratios implied by IMD Das et al. (2022) and by the one-third rule. It needs NIH-DHAARA depths for each duration at representative points in each zone (NIH), IMD recording-gauge data and the IDF values of Das et al. (2022) (IMD). Until it is published, sub-daily depths are read directly from NIH-DHAARA or an approved station IDF (Clause 2.6.1). Where only daily depths are available, the ratios used are those agreed with the Authority, which in Arunachal Pradesh are those of Clause 2.3.6 for the site's sub-area in Table 2B.1 (the 2(b) ratios in AR-C; the Arunachal Pradesh interim ratios in AR-A, AR-A1, AR-B, AR-C1, AR-D and AR-E), applied to the 24-hour depth of Clause 2.3.6(c) or (d) before the record check of Clause 2.3.6(h), with the short-storm floors of Clause 2.3.6(g) in AR-A, AR-A1, AR-B and AR-C and its 1-hour limits where a station fit replaces them (Clause 2.6.2), and are recorded on Form 2-1. The one-third rule is not used (Clause 2.6.4).

2B.1 The first row of Table 2B.1 gives the ratios of the one-third rule P(t) = P(24)·(t/24)^(1/3), for comparison only. The 1, 3, 6 and 12 h values are those stated in the commentary to Clause 2.6; the 2 h value is computed from the same formula. The rule shall not be used for design unless this annex confirms it for the zone concerned (Clause 2.6.4).

Table 2B.1 — Ratios P(t)/P(24h) by zone (layout)

Zone Source 1 h 2 h 3 h 6 h 12 h 24 h
All (reference only, not for design) One-third rule 0.35 0.44 0.50 0.63 0.79 1.00
AR-Z3 (AR-C Noa-Dihing plain) CWC FER 2(b), §4.3.2 and Table 4.1, p. 20, 10-yr basis, six recording gauges (interim design ratios, Clause 2.3.6(f); 2-h value interpolated on logarithmic axes; 9 h 0.81, 15 h 0.91, 18 h 0.95). Applied to the 24-h depth of Clause 2.3.6(c) or (d) before the check of Clause 2.3.6(h), with the short-storm floors of Clause 2.3.6(g); 72-h = 24-h × 1.70 (Clause 2.3.6(e)) 0.48   0.62 0.74 0.87 1.00
AR-Z1 (AR-A Itanagar capital region; AR-A1 Western foothills), AR-Z2 (AR-B Siang–Dibang–Lohit foothills), AR-Z3 (AR-C1 Patkai hills) and AR-Z4 (AR-D Middle hills; AR-E High ranges) Arunachal Pradesh interim ratios, set by this Manual: the upper envelope, rounded up to 0.01, of the fifteen Arunachal Pradesh NIH-DHAARA cells (50-yr), the CWC FER 2(a) ratios (NB/18/1991, §3.1.2, p. 24) and the adjoining Nagaland edition's interim ratios, which it equals (Clause 2.3.6(f); 9 h 0.84, 15 h 0.92, 18 h 0.95). Applied before the check of Clause 2.3.6(h); short-storm floors of Clause 2.3.6(g) in AR-A, AR-A1 and AR-B. 72-h = 24-h × 2.05 in AR-A and AR-A1, × 1.95 in AR-B, × 1.75 in AR-C1, × 1.90 in AR-D and × 1.80 in AR-E (Clause 2.3.6(e)) 0.33 0.52 0.61 0.76 0.88 1.00
AR-A, 24-h depths The capital-region table of Clause 2.3.6(c)(ii), set by this Manual from the NERIST Doimukh series (Dabral et al., 2016, Table 8, lognormal 1-day, × 1.13, rounded up to 5 mm): 135, 175, 205, 240, 265 and 290 mm at 50%, 20%, 10%, 4%, 2% and 1% AEP; also the minimum in AR-A1 at every AEP; not ratios of duration            
AR-A1, AR-B, AR-C, AR-C1, AR-D and AR-E, every 24-h depth below 2% AEP Growth factors of Clause 2.3.6(d), set by this Manual: the 50%, 20%, 10% and 4% AEP 24-h depths = the 2% AEP depth of Clause 2.3.6(c), before the check of Clause 2.3.6(h), × 0.42, 0.61, 0.73 and 0.89 (upper envelope of the NIH-DHAARA growth curves), with the 4% AEP depth not below Plate 8 where a contour reaches the site; not ratios of duration            
AR-C1, AR-D and AR-E, 24-h depths at 2% / 1% AEP Floors of Clause 2.3.6(c), set by this Manual: AR-C1 not less than 240 / 280 mm; AR-D not less than 280 / 320 mm (Ziro 320 / 400 mm where the 2(a) lines reach it); AR-E not less than 240 / 280 mm; not ratios of duration            
AR-A, AR-A1, AR-B and AR-C, 1-, 3- and 6-h depths at 10% AEP and rarer Short-storm floors of Clause 2.3.6(g), set by this Manual (the adjoining Assam edition's floors): 1 h 70 / 85 / 95 / 105 mm, 3 h 120 / 145 / 165 / 185 mm and 6 h 130 / 160 / 180 / 200 mm at 10% / 4% / 2% / 1% AEP; none in AR-C1, AR-D and AR-E            
Every sub-area, where a station fit replaces Clause 2.3.6(f) 1-hour limit of Clause 2.3.6(g), set by this Manual: 1-h ratio not below 0.33, or 0.48 in AR-C, until Annex 2B is published            
AR-Z1 (AR-A): Itanagar and Naharlagun cells NIH-DHAARA, IMDAA, 50-yr (queried 14 Nov 2026; comparison only) 0.17 / 0.21 0.28 / 0.34 0.37 / 0.43 0.55 / 0.61 0.75 / 0.78 1.00
AR-Z2 (AR-B): Pasighat and Tezu cells NIH-DHAARA, IMDAA, 50-yr (comparison only) 0.13 / 0.18 0.22 / 0.32 0.30 / 0.40 0.48 / 0.57 0.72 / 0.77 1.00
AR-Z3: Namsai (AR-C) and Changlang (AR-C1) cells NIH-DHAARA, IMDAA, 50-yr (comparison only; Changlang gives the 1-h and 2-h maxima of the fifteen cells) 0.20 / 0.29 0.34 / 0.48 0.44 / 0.57 0.63 / 0.72 0.82 / 0.84 1.00
AR-Z4: Ziro (AR-D) and Tawang (AR-E) cells NIH-DHAARA, IMDAA, 50-yr (comparison only) 0.23 / 0.13 0.35 / 0.23 0.41 / 0.31 0.55 / 0.49 0.74 / 0.73 1.00

2B.2 Depths from fixed observation windows are converted to true-interval depths with the factors of Clause 2.6.3, repeated in Table 2B.2. They are the standard WMO (Hershfield) values and are not provisional.

Table 2B.2 — Fixed-interval adjustment factors (Clause 2.6.3)

Number of fixed observation intervals in the duration Factor
1 1.13
2 1.04
3–4 1.02

Annex 2C — Grid-to-point factors

Supports Clauses 2.7.1 and 2.7.4 of Chapter 2.

To be prepared. This annex will give the factors that convert grid-average design depths (for example from 0.25° cells) to point depths, by zone, duration and AEP. It needs paired frequency analyses of IMD gridded rainfall and of the IMD and State gauges inside each cell (IMD, the automatic weather stations and automatic rain gauges of the Meteorological Centre Itanagar, the NERIST meteorological laboratory at Doimukh and any gauges of APSDMA, the Department of Disaster Management or the Smart City companies [TBC]), the benchmark points of Annex 2A, and a stated method for deriving the factors. Until it is published, design depths are taken as point values from NIH-DHAARA or an approved station IDF (Clauses 2.3.1 and 2.3.2). Grid-average values are not used as design depths unless a conversion agreed with the Authority is recorded on Form 2-1 (Clause 1.11.5).

2C.1 The commentary to Clause 2.7 shows why the factors matter. In Arunachal Pradesh NIH-DHAARA was queried at fifteen points for this Manual. In the foothills, where it can be checked, its reanalysis cells give 1.7 to 2.4 times the CWC plates and about 1.5 times the NERIST gauge at Doimukh: 472 mm at 50 years in 24 hours over Itanagar, against 265 mm from the gauge and about 200 mm on the plate; in the south-east its Khonsa and Changlang cells lie within one contour of the plates; and in the interior its Tawang cell gives 129 mm, below the 190 mm that Bomdila received on 29 May 2024 (NIH-DHAARA, queried 14 Nov 2026; Dabral et al., 2016; IMD bulletin, as summarised). Values of this kind are grid- or area-average values and need these factors before any use as point depths; under Clause 2.3.6 NIH-DHAARA is never a design value in Arunachal Pradesh, and is reported in every sub-area for comparison only (Clause 2.3.6(m)).

Table 2C.1 — Grid-to-point factors (layout)

Zone Grid product and cell size Duration (h) AEP Factor (point / grid) Stations used Years of record
    24        
    48        
    72        

Annex 2D — Arunachal Pradesh temporal patterns (Huff curves)

Supports Clauses 2.9.3 and 2.9.4 of Chapter 2, and Clause 11.7.3 of Chapter 11.

To be prepared. This annex will give dimensionless time-distribution (mass) curves of Arunachal Pradesh storms, in the form introduced by Huff (1967), by zone, storm-duration class and quartile, at stated probability levels. It needs storm hyetographs from recording gauges and automatic weather stations (IMD, its automatic weather stations and automatic rain gauges in the State under the Meteorological Centre Itanagar, whose hourly archive is the first data request of Clause 2.3.6(a), and any hourly record of the NERIST meteorological laboratory at Doimukh [TBC]), separated into independent storms by a stated rule, and the Modirijo and Donyi Polo storm of about 14 September 2018 at Itanagar, the Remal storm of 28–29 May 2024, with 190 mm at Bomdila, the Itanagar storm of 23 June 2024, with 40 mm between 10:30 and 12:30 as quoted from IMD, the reported Itanagar cloudburst of July 2024, the storms of late May and June 2025, and the Poosa storm at Yazali of 24 June 2025 or 2026 among them. Until it is published, design storms use the alternating-block pattern of Clause 2.9.1 and the 48- and 72-hour pattern of Clause 2.9.2; for catchments of 25–5,000 km², the CWC Flood Estimation Report curves may be used with a sensitivity run under Clause 2.9.1 (Clause 2.9.4). SCS Type distributions are not used (Clause 2.9.3). For the disaggregation of daily records in continuous simulation (Clause 11.7.3), the method is agreed with the Authority and recorded (Clause 1.11.5).

Table 2D.1 — Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)

Fraction of storm time 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
10% probability curve 0                   1.0
50% probability curve 0                   1.0
90% probability curve 0                   1.0

2D.1 Each table shall state the zone, the duration class, the quartile (the quarter of the storm in which most rain fell), the number of storms analysed and the period of record.

Reference: Huff, F.A. (1967). Time distribution of rainfall in heavy storms. Water Resources Research 3(4), 1007–1019.


Annex 2E — Retention percentile depths by zone

Supports Clauses 2.8.3 and 2.10.1 to 2.10.2 of Chapter 2, Clause 4.4 of Chapter 4 and Chapter 8.

To be prepared. This annex will give, for each zone of Annex 2A, the retention design depth P_R: the 24-hour rainfall depth not exceeded on 90% of days with rain (≥ 2.5 mm) in the long-term record (Clause 2.10.1). It needs long daily records at stations in each zone (IMD, the automatic weather stations and automatic rain gauges of the Meteorological Centre Itanagar, the NERIST meteorological laboratory at Doimukh and any gauges of APSDMA, the Department of Disaster Management or the Smart City companies [TBC]) and IMD gridded data with the factors of Annex 2C where stations are sparse. Until it is published, P_R is computed by the definition of Clause 2.10.1 from the long-term daily record of a station agreed with the Authority, by the steps in 2E.1, and recorded on Form 2-1 (Clause 1.11.5).

2E.1 Computing P_R from a daily record.

  1. Take the daily (24-hour) rainfall series of the station for its full record.
  2. Keep only the days with rain of 2.5 mm or more (wet days).
  3. Rank the wet-day depths and take the depth not exceeded on 90% of them (the 90th percentile).
  4. Do not apply the climate factor (Clause 2.8.3) or the fixed-interval factor; P_R is a statistic of everyday rainfall, not an AEP design depth.
  5. Record the station, the period of record, the number of wet days and P_R on Form 2-1.

Table 2E.1 — Retention depth P_R by zone (layout)

Zone Stations or grid cells used Period of record Number of wet days (≥ 2.5 mm) P_R, 90th percentile (mm) Issued on
AR-Z1 Western foothills          
AR-Z2 Eastern foothills          
AR-Z3 South-east          
AR-Z4 Hills and high ranges          

Form 2-1 — Design Rainfall Sheet

Supports Clauses 2.3 to 2.13 of Chapter 2, and Clause 10.4.1(d) of Chapter 10.

Draft form — Arunachal Pradesh Stormwater Design Manual, Draft v1.0. One sheet for each hydrologic submittal. The steps follow Figure 2.3 of Chapter 2.

Table 2F.1 — Form 2-1: site, source and storms

No. Item (clause) Entry
A. Site (Clause 2.13, item 1)
A1 Project and site ______
A2 Site coordinates (latitude, longitude, decimal degrees) ______
A3 Rainfall zone (Annex 2A, or as agreed with the Authority) ______
A4 Contributing catchment area (km²) (Clause 2.7) ______
A5 Design life: more than 25 years / temporary works, 5 years or less (Clause 2.8.2) ______
A6 Outfall under tidal or river backwater influence: Yes / No (Clauses 2.5.3, 2.12) ______
B. Source (Clauses 2.3, 2.3.5; item 2)
B1 NIH-DHAARA: version or access date ______
B2 Coordinates queried ______
B3 Screenshot or export of the values extracted attached: reference ______
B4 Station IDF used (Clause 2.3.2): No / Yes — station, ID, distance from site (km) ______
B5 Station IDF: years of recording-gauge data (30 or more); published or approved by ______
B6 Station IDF: change of terrain or coastal exposure between gauge and site: None / describe ______
C. AEPs and durations (Clauses 2.4, 2.5)
C1 Elements designed and their AEPs (Table 2.1) ______
C2 Conveyance: Tc and design duration (not less than 10 min) (Clause 2.5.1) ______
C3 Storage: durations checked from {1, 2, 3, 6, 12, 24, 48, 72 h}; 24, 48 and 72 h included (Clause 2.5.2) ______
C4 Critical duration found for each storage element ______
D. Conversions
D1 Sub-daily depths: read directly / from Annex 2B ratios / from ratios agreed with the Authority (Clauses 2.6.1, 2.6.2) ______
D2 Fixed-interval factor applied: none (true-interval source) / 1.13 / 1.04 / 1.02 (Clause 2.6.3) ______
D3 Grid-to-point factor: not needed (point source) / Annex 2C / agreed value (Clause 2.7.1) ______
D4 ARF: 1.0 (10 km² or less; single-site storage) / CWC curve / interpolated (Clauses 2.7.2–2.7.4) ______
D5 Climate factor: 1.20 (≤ 6 h) and 1.10 (> 6–72 h) / 1.0 temporary works / projected depths under Clause 2.8.4 ______
E. Cross-checks (Clause 2.3.3; item 4)
E1 IMD Das et al. (2022) values for 1–24 h: reported in Table 2F.2 ______
E2 CWC subzone 2(a) or 2(b) (in AR-D and AR-E enter "none: beyond the last 2(a) contour") 24-hour point value, catchments of 25–5,000 km²: subzone used ______
E3 CWC floor governs for any AEP: No / Yes — AEPs ______
F. Retention depth (Clause 2.10)
F1 P_R (mm) and source: Annex 2E zone value / computed under Annex 2E, 2E.1 — station and period ______
F2 No climate factor applied to P_R (Clause 2.8.3): confirmed ______
G. Design storms (Clauses 2.9, 2.11, 2.12; items 5 and 6)
G1 Storms up to 24 h: alternating block, peak at 50%; time step (≤ Tc/3 and ≤ 15 min) ______
G2 48 and 72 h storms: built under Clause 2.9.2 (Table 2F.3) ______
G3 Other pattern used: none / Annex 2D / CWC FER with sensitivity run (Clauses 2.9.3, 2.9.4) ______
G4 Hyetographs attached as a table and a plot for each design storm: reference ______
G5 AMC: III for every design storm of 1 May–15 October in sub-areas AR-A, AR-A1, AR-C and AR-C1, of 1 April–31 October in AR-B and of 1 June–15 October in AR-D and AR-E, whatever its duration; III for every design storm of 1 April–31 October on land below the 1% AEP level of a river, stream or nallah, on the Pachin and Dikrong palaeochannels and swamps, on pond margins and where the seasonal high water table is within 2 m of ground; III at any time in catchments draining to a reservoir, its backwater or a release reach (Pare, Ranganadi, Kameng, Lower Subansiri); at any other site or time, III for a storm that follows or contains a 5-day total of more than 53 mm; II otherwise (Clause 2.11.4) ______
G6 Pre-development condition: greenfield, open land in good condition for the mapped HSG (Clause 2.11.5) ______
G7 Release criterion: standard, Q_post ≤ 0.9 × Q_pre (Clause 2.11.2) / flood-sensitive, mixed-frequency rule (Clause 2.11.3) ______
G8 Tailwater joint cases run (Clause 2.12): case (a) MHWS + sea-level allowance; case (b) 10% AEP 48 h storm with 1% AEP still-water level + sea-level allowance; governing case ______
H. Prepared by
H1 I confirm that the values above are those extracted and used in the submittal. Name, registration number, signature, date ______

Design depth = source depth × fixed-interval factor × grid-to-point factor × ARF × climate factor. Where the design depth is lower than the CWC floor for the same AEP, the floor is adopted (Clause 2.3.3).

Table 2F.2 — Form 2-1: depth table (Clause 2.13, item 3)

AEP (T-yr) Duration Source depth (mm) Fixed-interval factor Grid-to-point factor ARF Climate factor Design depth (mm) IMD Das et al. (2022) (mm) CWC floor (mm) Adopted depth (mm)
                     
                     
                     
                     

Table 2F.3 — Form 2-1: 48- and 72-hour storm construction (Clause 2.9.2)

AEP (T-yr) Duration (h) Total design depth (mm) 24 h design depth, final 24 h (mm) Remainder (mm) Hours before the final 24 h Uniform intensity before the final 24 h (mm/h)
  48       24  
  72       48