Chapter 8Water Quality and Recharge
8.1 Purpose and scope
8.1.1 This chapter sets the requirements for the quality of stormwater leaving a site or a public drainage system, and for groundwater recharge. It covers:
- (a) the water quality volume (WQv) and the water quality design flow;
- (b) the treatment train, and the selection and design of best management practices (BMPs);
- (c) the criteria for infiltration and recharge;
- (d) the exclusion of sewage and dry-weather flow from storm drains;
- (e) gross pollutant traps, first-flush treatment and screens at outfalls to waterbodies;
- (f) how rainwater harvesting (RWH) fits with retention and detention;
- (g) erosion and sediment control during construction; and
- (h) monitoring.
8.1.2 This chapter applies to every development and public work to which Chapter 4 applies (Chapter 1). Clauses 8.9 (sewage) and 8.12 (construction erosion and sediment control) apply to every development that needs a building permit or layout approval, and to every public drainage work, whatever its size.
8.1.3 Retention under Chapter 4 is the first and preferred form of water quality control. Runoff retained on site is treated in full. The rest of this chapter applies to the part of the WQv that is not retained.
8.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Water quality volume (WQv) | The runoff volume that must be retained or treated, from the water quality rainfall depth (Clause 8.4). |
| Water quality rainfall depth (P_wq) | The greater of the retention depth (Annex 2E, Clause 2.10) and the 24-hour 3-month ARI depth (Annex 8A). |
| 3-month ARI depth | The 24-hour rainfall depth equalled or exceeded on average four times a year, from a partial-duration series of the long-term daily record. |
| Water quality design flow (Q_wq) | The peak flow from the 3-month ARI storm, used to size flow-through devices and diversion structures (Clause 8.4.5). |
| Runoff coefficient for WQv (Rv) | The volumetric runoff coefficient for small storms, Rv = 0.05 + 0.009·I. |
| BMP | A best management practice: a structural or non-structural measure that reduces pollutant loads or runoff volume. |
| Treatment train | Two or more BMPs in series, from source to site to regional scale (Clause 8.5). |
| Pretreatment | A BMP that removes coarse sediment, litter and oil before runoff reaches a filter or infiltration BMP. |
| First flush | The early part of a runoff event, which usually carries the highest concentrations of sediment, litter and oil. |
| Gross pollutant trap (GPT) | A device that captures litter, plastics, vegetation and coarse sediment, typically above about 5 mm. |
| Dry-weather flow (DWF) | Flow in a storm drain when it has not rained for at least 72 hours. In a separate storm system, DWF is evidence of sewage, sullage, groundwater infiltration or illicit discharge. |
| Cross-connection | Any pipe, channel or opening that lets sewage or sullage (grey water from kitchens, bathrooms and laundries) enter a storm drain. |
| Infiltration facility | A facility designed to store runoff below the ground surface, or in a depression, and let it soak into the soil: infiltration trenches and basins, unlined bioretention, permeable pavement with an open base, soakaways, recharge pits and recharge wells. |
| Seasonal high groundwater table | As defined in Clause 3.10.2: the highest level in the monsoon season. |
| Hotspot | A land use with a high risk of spills or contaminated runoff (Clause 8.8.8). |
| Level of Service (LoS) / Value Rating (VR) | The scoring system of Clause 8.6, from the MARC/APWA BMP Manual (2012). |
8.3 Objectives and pollutants of concern
8.3.1 Stormwater treatment under this Manual shall aim to:
- (a) remove litter, plastics and other gross pollutants before they reach a waterbody;
- (b) remove suspended sediment, and the metals, nutrients and oil carried on it;
- (c) keep sewage and sullage out of storm drains and waterbodies;
- (d) recharge groundwater where soils and groundwater depth allow, without polluting it; and
- (e) prevent erosion and sediment discharge during construction.
8.3.2 The design shall address the following pollutants for every site, and the hotspot pollutants of Clause 8.8.8 where they apply:
Table 8.1 — Pollutants of concern, sources and primary controls
| Pollutant | Main sources in Arunachal Pradesh towns | Primary control |
|---|---|---|
| Gross pollutants (plastics, litter, vegetation) | Streets, markets, open dumping in drains | Source collection; GPTs and screens (Clause 8.10) |
| Suspended sediment | Construction sites, unpaved roads and verges, road wear, drain silt | Erosion and sediment control (Clause 8.12); pretreatment; filtration |
| Oil, grease and fuel | Roads, parking, fuel stations, workshops, bus depots | Oil-grit separators at hotspots; bioretention |
| Pathogens and organic load (BOD) | Sewage and sullage cross-connections, animal waste | Exclusion and DWF interception (Clause 8.9) |
| Nutrients (N, P) | Sewage, fertiliser, food waste, detergents | Exclusion; bioretention; wetlands |
| Heavy metals | Roads, roofs, industrial yards | Filtration; sedimentation |
Commentary. Gross pollutants and sewage come first in Clause 8.3 because they dominate the pollution of urban waterbodies in Arunachal Pradesh, and because no treatment BMP works for long if they are not removed. CPHEEO (2019) notes that Indian drains carry night soil, urine and food waste (Part A §9.5). In its WSUD procedure it lists TSS, total nitrogen, total phosphorus and gross pollutants as the key pollutants (Part A Ch. 10). AMRUT 2.0 funds the harvesting of rainwater "through storm water drains into water body (which is not receiving sewage/effluent)" (Lok Sabha unstarred question AU1419), which only works if sewage is first kept out of the drains.
8.4 Water quality volume and design flow
8.4.1 Water quality rainfall depth. The water quality rainfall depth is:
P_wq = max (P_ret, P_3m)
where:
- P_ret = the retention depth for the site's zone (Annex 2E, Clause 2.10), mm; and
- P_3m = the 24-hour 3-month ARI depth for the site's zone (Annex 8A), mm.
8.4.2 Water quality volume. The WQv shall be computed as:
WQv = (P_wq / 1000) × Rv × A
where:
- WQv is in m³;
- A = the contributing area, m²;
- Rv = 0.05 + 0.009·I; and
- I = the impervious percentage of the contributing area (0–100), after the connectivity rules of Clause 3.9.
The Rv form above may be used only for sites under 0.5 ha and under the Tier B simplified method (Clause 4.14). This is the same limit as for the retention volume (Clause 4.4.2). For all other sites the WQv shall be computed with the SCS-CN method, as the retention volume is: WQv (m³) = 10 × Q_wq × A, where Q_wq (mm) is the SCS-CN runoff from P_wq for each sub-area and A is in ha.
8.4.3 Climate factor. The climate factor of Clause 2.8 shall not be applied to P_wq. P_ret and P_3m are frequency statistics of ordinary rainfall, not AEP design depths.
8.4.4 WQv met by retention. The volume retained on site under Chapter 4 counts toward the WQv in full. Where the retained volume is equal to or greater than the WQv, no further treatment is required for that area, except:
- (a) pretreatment of inflows to each retention facility (Clause 8.5.3);
- (b) hotspot controls (Clause 8.8.8); and
- (c) the outfall requirements of Clause 8.10, where the site discharges to a waterbody.
8.4.5 Water quality design flow. Flow-through devices (swales, filter strips, oil-grit separators, GPTs) and diversion weirs for off-line BMPs shall be sized for Q_wq. Q_wq shall be computed from the 3-month ARI intensity at the time of concentration of the contributing area:
- (a) by the Rational Method, where Chapter 3 allows it (a single element draining no more than 16 ha); or
- (b) as the peak of a hydrograph method using the 3-month ARI 24-hour depth with the alternating-block pattern of Clause 2.9.1.
8.4.6 Bypass. Flows above Q_wq shall bypass flow-through and off-line treatment devices without washing out the material already captured. The bypass shall be part of the minor or major system (Chapter 6).
8.4.7 Drawdown. Where the WQv is held in an extended-detention BMP (wet pond, constructed wetland or dry extended-detention basin), it shall be released over 24–48 hours (Chapter 4).
Commentary. The WQv depth is the runoff from the 3-month ARI storm or the retention depth, whichever is greater. The 3-month ARI is the Malaysian water quality design storm (MSMA 2, 2012). The Malaysian 2008 checklist gave its depth as about 40 mm and said it captures 90% or more of 24-hour storm runoff volume (DID, 2008). The Arunachal Pradesh value must be computed (Annex 8A). Georgia sets its WQv as the runoff from 1.2 inches (about 30 mm), the depth that covers 85% of storms in an average year, and requires 80% removal of the average annual post-development TSS load (GSMM 2016, Vol 1, Standard #4). Kansas City's water quality storm is the 1.37-inch (about 35 mm) event that produces up to 90% of the runoff from all 24-hour storms in a year (MARC BMP Manual, 2012).
The Rv formula is from the MARC/APWA BMP Manual (2012), which computes WQv = P × Rv with Rv = 0.05 + 0.009·I. Rv is used instead of the SCS curve number because the CN method greatly understates runoff from small storms on pervious ground. Not applying the climate factor (Clause 8.4.3) has no direct precedent; this Manual does so because it treats P_wq like the retention depth, as a statistic of ordinary rainfall. Bypass of larger flows and the 24–48 hour drawdown follow Chapter 4; MARC (2012) required at least 40 hours of extended detention of the WQv.
Illustrative — not design values. For a 1.0 ha site with 80% impervious cover and an assumed P_wq of 50 mm:
- Rv = 0.05 + 0.009 × 80 = 0.77
- WQv = (50 / 1000) × 0.77 × 10,000 = 385 m³
8.5 Treatment train and pretreatment
8.5.1 Treatment train. Water quality control shall be designed as a treatment train, in the order shown in Figure 8.1:
- (a) source controls on the plot: roof runoff to RWH, rain gardens, permeable paving, disconnection of impervious areas, and silt traps at inlets;
- (b) site controls: bioretention, swales, filter strips, infiltration, oil-grit separators at hotspots, wet ponds and extended detention; and
- (c) regional controls, for public drainage: GPTs and DWF interceptors at outfalls, constructed wetlands at tank inlets, and regional ponds.
8.5.2 A development shall meet the WQv on site, through (a) and (b). Regional controls under (c) may count toward a development's WQv only where a regional facility treating the same runoff has been built under a notified basin plan (Clause 7.11).
8.5.3 Pretreatment. Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland shall have pretreatment at each concentrated inflow. Pretreatment shall be a sediment forebay, grass filter strip, silt trap or proprietary device that holds at least 10% of the WQv of its contributing area, or that is sized for Q_wq for flow-through devices.
8.5.4 Pretreatment shall be accessible for cleaning without entering or disturbing the main BMP.
Commentary. The treatment train follows CPHEEO (2019, Part A §10.2.3, SuDS treatment train) and CIRIA C753 The SuDS Manual (2015). It is also the order of priorities of this Manual: preserve, retain, detain, convey (Chapter 1). The 10% forebay volume has no Indian precedent; it is a common sizing rule for forebays in US manuals. In Arunachal Pradesh, unpaved verges, construction sites and drain silt deliver a heavy sediment load. Bioretention and infiltration facilities without pretreatment clog, often within a year or two.
Figure 8.1 — Treatment train: source, site and regional controls before the receiving waterbody, with sewage and dry-weather flow kept out of the system. Original drawing for this Manual, adapted from CIRIA, The SuDS Manual (C753), 2015, and MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012.
8.6 BMP selection: Level of Service and Value Rating
8.6.1 Method. In Tier A areas, the BMPs for each site shall be selected by the Level of Service (LoS) method of this Clause. In Tier B areas, the simplified route of Clause 8.6.5 may be used.
8.6.2 Required Level of Service. For a site that is not redevelopment, the required LoS depends on the change in curve number (ΔCN) from pre- to post-development (Chapter 3):
Table 8.2 — Required Level of Service for sites that are not redevelopment
| ΔCN | Impact | Required LoS |
|---|---|---|
| 17 or more | High | 8 |
| 7 to 16 | Moderate | 7 |
| 4 to 6 | Low | 6 |
| 1 to 3 | Minimal | 5 |
For redevelopment (existing impervious cover of 20% or more of the site), the required LoS shall be taken from Annex 8B.
8.6.3 Value Rating. Each BMP treating the WQv has a Value Rating (VR) from Table 8.3. The site's composite VR is the area-weighted average of the VRs of the BMPs serving each part of the site. Treatment trains get a composite VR under Annex 8B. The composite VR shall be equal to or greater than the required LoS.
8.6.4 Conditions for a Value Rating. A BMP earns its VR only if:
- (a) it is sized for the WQv (or Q_wq for flow-through devices) of the area credited to it;
- (b) it meets the design requirements of Clause 8.7 and, for infiltration, Clause 8.8; and
- (c) it has pretreatment under Clause 8.5.3.
8.6.5 Tier B simplified route. In Tier B areas, the requirement of Clause 8.6.3 is deemed met where the whole WQv of the site is either:
- (a) retained on site under Chapter 4; or
- (b) treated by a bioretention cell, rain garden or infiltration facility designed under Clauses 8.7 and 8.8, with pretreatment.
Table 8.3 — BMP Value Ratings and suitability in Arunachal Pradesh
| BMP | VR (MARC 2012) | Main pollutants removed | Volume reduction / recharge | Terrace sands and fan heads (recharge rule) | Laterite / hard rock | Slopes, shale, colluvium and fill / floodplain and high water table | Arunachal Pradesh notes |
|---|---|---|---|---|---|---|---|
| Native vegetation (preserved) | 9.25 | All | High | Suited | Suited | Suited | Counts only for preserved, undisturbed area |
| Rain garden / infiltration | 9.0 | Sediment, metals, oil, nutrients | High | Suited if 1.0 m separation met | Conditional (test) | Not suited | Mosquito control: drain within 48 h |
| Bioretention | 8.5 | Sediment, metals, oil, nutrients | Medium–high (unlined); low (lined) | Suited | Suited, with underdrain | Lined, with underdrain | Media source and phosphorus content to be specified |
| Permeable pavement | 7.5 | Sediment, metals, oil | Medium–high | Suited | Conditional | Lined only | Not where run-on carries heavy silt |
| Extended detention wetland | 7.0 | Sediment, nutrients, metals | Low | Conditional (water balance) | Suited | Suited | Good at tank inlets (Clause 7.9.7) |
| Media / sand filter | 6.0 | Sediment, metals | Low | Suited | Suited | Suited (lined) | Needs frequent cleaning |
| Extended wet detention (wet pond) | 5.0 | Sediment, metals, some nutrients | Low | Conditional (water balance) | Suited | Suited | Dry-season water balance (Clause 8.7.8) |
| Vegetated filter strip | 5.0 | Sediment | Low–medium | Suited | Suited | Suited | Mostly as pretreatment |
| Native vegetation swale | 4.0 | Sediment, oil | Low–medium | Suited | Suited | Suited | Not where Q_wq velocity is high |
| Extended dry detention | 4.0 | Coarse sediment | Low | Suited | Suited | Suited | Combine with detention (Chapter 4) |
| Proprietary / hydrodynamic devices | 3.0–5.0 | Coarse sediment, oil, litter | None | Suited | Suited | Suited | VR from verified test data only |
| Signage (public education) | +0.25 | — | — | — | — | — | Added to composite VR |
The VR column is from the MARC/APWA BMP Manual (2012), Table 4.4. The suitability columns and notes have no direct precedent and are set by this Manual.
Commentary. The LoS and VR method is from the MARC/APWA Manual of Best Management Practices for Stormwater Quality (2012), Tables 4.2 and 4.4. The VRs combine a water quality score, based on effluent TSS concentrations in the International Stormwater BMP Database, with scores for volume reduction, temperature, and oils and floatables. The method suits Arunachal Pradesh for two reasons. It rewards volume reduction and preservation, which also serve recharge. It can also be checked by a reviewer without water quality modelling. Its weakness is that the scores come from US data. Arunachal Pradesh stormwater carries more litter and more sewage than the US runoff behind the scores (CPHEEO 2019, §9.5), so this Manual requires GPTs and DWF exclusion separately (Clauses 8.9 and 8.10) and does not let a VR stand in for them.
8.7 BMP design summaries
8.7.1 General. Each BMP shall be designed to the requirements below and to Annex 8D (BMP design sheets). The dimensions given are recommended starting values where marked; the designer shall justify any departure. Every BMP shall be designed for safe passage of flows above Q_wq (Clause 8.4.6) and shall have access for maintenance (Chapter 10).
8.7.2 Bioretention and rain gardens (Figure 8.2).
- (a) Surface ponding depth not more than 300 mm above the mulch, with an overflow at the maximum ponding level.
- (b) Surface ponding drained within 48 hours.
- (c) Filter media 600–900 mm deep: an engineered sandy loam with low fines and low phosphorus content (Annex 8D), with a 50–75 mm mulch layer.
- (d) A transition (choker) layer and a gravel drainage layer below the media.
- (e) A perforated underdrain where the design infiltration rate of the native soil (Clause 8.8.4) is below the rate needed to meet (b), or where the cell is lined.
- (f) Unlined cells shall meet the infiltration criteria of Clause 8.8. Cells that cannot meet them, and cells at hotspots, shall be lined.
- (g) Plants: native or naturalised species tolerant of both waterlogging and long dry spells.
8.7.3 Vegetated swales.
- (a) Trapezoidal or parabolic section, with side slopes no steeper than 1V:3H.
- (b) Longitudinal slope 0.5% to 4%, with check dams where steeper.
- (c) Flow depth at Q_wq not more than the height of the grass, and velocity at Q_wq not more than 0.3 m/s.
- (d) The 1% AEP flow (or the bypass) shall not erode the swale (Chapter 9 permissible velocities).
- (e) Where longitudinal slopes are below 1% or the subsoil is poorly drained, an underdrained ("dry") swale with filter media.
8.7.4 Vegetated filter strips.
- (a) Receive sheet flow only, with a level spreader where flow arrives concentrated.
- (b) Length in the direction of flow at least 5 m, and slope 1% to 8%.
- (c) Used mainly as pretreatment for bioretention, infiltration and swales.
8.7.5 Permeable pavement.
- (a) Run-on from impervious areas not more than twice the permeable area, and no run-on from unpaved or eroding areas.
- (b) Base reservoir of clean, open-graded aggregate, sized to hold its share of the WQv in its voids.
- (c) An open base (infiltrating) only where Clause 8.8 is met; otherwise lined with an underdrain, and then counted as filtration only.
- (d) Structural design for the traffic loading by the road authority's standards.
- (e) Not at hotspots, and not where the surface will be resurfaced with impermeable material.
8.7.6 Infiltration trenches and basins (Figure 8.3).
- (a) Pretreatment under Clause 8.5.3 in every case.
- (b) Trenches filled with clean washed aggregate, with a void ratio confirmed by test, wrapped in geotextile on the sides and top, on a sand base.
- (c) An observation well to the base of each trench.
- (d) Storage volume = WQv (or the retention volume of Chapter 4, where greater) held in the voids; emptied within 72 hours at the design infiltration rate.
- (e) An overflow to the minor or major system at grade.
- (f) Not brought into service until the contributing area is stabilised (Chapter 10).
8.7.7 Wet ponds (extended wet detention).
- (a) A permanent pool of at least the WQv, plus extended detention of the WQv above the pool, released over 24–48 hours.
- (b) A sediment forebay at each inlet (Clause 8.5.3).
- (c) Length-to-width ratio of the flow path at least 3:1, with no short-circuiting.
- (d) Permanent pool depth 1.0–2.5 m, with a safety bench (Clause 7.9.4).
- (e) A dry-season water balance (Clause 8.7.8).
- (f) The detention storage of Chapter 4 may sit above the extended detention level.
8.7.8 Water balance for permanent pools. Wet ponds and wetlands shall be shown, by a monthly water balance using IMD rainfall and pan evaporation, to keep at least 50% of the permanent pool volume (or the minimum wetland depth) through the driest year in 10. They shall not be topped up with groundwater, potable water or sewage. Where the balance fails, a dry extended-detention basin or a constructed wetland with a smaller permanent pool shall be used instead.
8.7.9 Constructed wetlands.
- (a) An inlet sedimentation pond (forebay) followed by a shallow vegetated macrophyte zone.
- (b) Extended detention of the WQv above the normal water level, released over 24–48 hours, with an extended detention depth not more than 0.5 m.
- (c) A flow path length-to-width ratio of at least 3:1, with deep zones across the flow path to spread the flow.
- (d) A high-flow bypass so that floods do not scour the macrophyte zone.
- (e) Where built at a tank inlet, the wetland shall sit within the tank's setback but outside its waterspread, and its storage shall not be counted as tank storage.
8.7.10 Gross pollutant traps.
- (a) Sized to treat Q_wq, with all flows up to the 1% AEP passing without washing out captured material.
- (b) Capture of gross pollutants down to about 5 mm.
- (c) Head loss included in the hydraulic grade line of the drain (Chapter 9), with the screen assumed 50% blocked.
- (d) Storage for captured material sized for the cleaning interval of the O&M plan, and not less than the 3-monthly cleaning of Chapter 10.
- (e) Vehicle access for cleaning by suction or grab.
8.7.11 Oil-grit separators.
- (a) Required at the hotspots of Clause 8.8.8 that involve fuel or oil: fuel stations, vehicle workshops and washing bays, bus and truck depots, and parking areas of more than 50 spaces.
- (b) Sized for Q_wq, with a high-flow bypass.
- (c) Not to be used as the only treatment: they shall be followed by a filtering BMP where the site needs a VR above 5.
8.7.12 Silt traps and catch pits.
- (a) At every inlet that receives runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody.
- (b) A sump at least 300 mm below the outlet invert.
- (c) Silt traps are pretreatment only and earn no VR.
Commentary. The design summaries draw on the MARC/APWA BMP Manual (2012), the Georgia Stormwater Management Manual (2016, Vol 2), CIRIA C753 The SuDS Manual (2015) and PUB Singapore's ABC Waters Design Guidelines. The dimensions are typical of those manuals but have not been calibrated in Arunachal Pradesh. Three local issues drive changes from the source manuals:
- Mosquitoes. Dengue is endemic in Arunachal Pradesh. Surface ponding in bioretention and rain gardens must drain within 48 hours (Clause 8.7.2(b)), well inside the time mosquito larvae need to develop. This is consistent with the 24–48 hour WQv drawdown of Clause 8.4.7.
- Dry seasons. Most of Arunachal Pradesh's rain falls in the monsoon season of 1 April to 31 October: at Doimukh the months of November to February bring 142.68 mm, 4.0% of the year (NERIST series, Dabral et al., 2016), and the State "receives rainfall over a period of 8 to 9 months excepting in winter" (State Action Plan on Climate Change, 2011); storms still come outside the season, in October in the east and occasionally in winter (Chapter 2). From November to March ponds fall and springs weaken: "most of the springs become dry during dry season" in Papum Pare, and in the northern hills of East Siang springs are the only source (CGWB). In the towns the feed of a drain, nallah or pond in the dry months is often sewage and sullage, because no town treats its sewage and the drains are "being used as sewers" (Master Plan of Itanagar Capital Region-2031; Clause 8.9, Commentary). A wet pond or constructed wetland whose water balance (Clause 8.7.8) cannot keep its permanent pool through the dry months on its own catchment's runoff is not to be used; on the hill slopes, where Clause 4.11 bars infiltration on slopes, shale and slope debris and there is little flat land, the practical forms are lined bioretention with an underdrain, swales on gentle ground, storage for use, and lined extended dry detention. In the high ranges, where snow lies in winter, a BMP is also designed so that ice and snow do not block its inlet and outlet (Chapter 10). Clause 8.7.8 applies to BMPs, which shall not be topped up with sewage; ponds, lakes, springs and wetlands are waterbodies under Chapter 7 and are not to be used as treatment for a development. Wet ponds that dry out turn into stagnant pools or are used for dumping. Clause 8.7.8 requires a water balance and bans topping up with sewage, which is a common practice for keeping urban ponds "full".
- Litter and silt. GPTs and silt traps are treated as essential, not optional, because Arunachal Pradesh drains carry heavy litter and silt loads. The 50% blockage factor for screens matches the grate clogging factor of Chapter 6.
The 50-space threshold for oil-grit separators, the 5 mm GPT capture size, the 0.3 m/s swale velocity and the other dimensions in this Clause have no direct precedent and are set by this Manual.
Figure 8.2 — Bioretention cell (rain garden) in section: pretreatment, surface ponding, filter media, transition and gravel layers, underdrain, overflow, and the 1.0 m separation to seasonal high groundwater for an unlined cell. Original drawing for this Manual, adapted from MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012, and CIRIA, The SuDS Manual (C753), 2015.
8.8 Infiltration and recharge criteria
8.8.1 Groundwater separation. An infiltration facility is permitted only where the seasonal high groundwater table is at least 1.0 m below the base of the facility. There is no exception in Arunachal Pradesh, which has no coastal sand areas (Clause 8.8.9). For this Clause the seasonal high groundwater table is the highest level found from April to November, which covers the season of 1 April to 31 October and the month after it (Clause 3.10.2). Arunachal Pradesh needs the three rules of Clause 4.11 here, and Clause 8.8.1 applies with the following. (i) No infiltration on hill slopes, shale or slope debris (Clause 4.11, hill rule). In sub-areas AR-C1, AR-D and AR-E of Annex 2A, on the hill rim of AR-A and AR-A1, and on any natural slope steeper than 10° anywhere, no deliberate infiltration practice (soakaway, soak or percolation pit, recharge pit, shaft or well, infiltration trench, unlined bioretention, or permeable paving with an exfiltrating base) shall be built or credited on natural ground sloping more than 10°; on Siwalik shale, at any slope; on colluvium, slope debris or fill; in a mapped landslide zone or above a landslide scarp; or upslope of a cut slope or retaining wall within twice its height, unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope. On such sites roof runoff goes to storage sized under Clause 4.11 (25 L per m² of roof), with its overflow, and all other runoff, by a lined, stepped drain through a silt trap and an energy dissipator to a stable natural channel, never onto an unprotected slope; the exception for roof water in Clause 8.11.3(c) does not apply, and no infiltration is credited toward retention or the WQv. The CGWB describes Papum Pare as "underlain mostly by Siwalik group of rocks", with hill slopes "covered by residual soil or slope debris", and the older formations "overthrusted over the Younger Tertiary Siwaliks"; the Master Plan of Itanagar Capital Region-2031 places the capital in Earthquake Zone V with "5 fault lines in the city"; and the landslide at Laptap on 11 July 2017 followed three days of rain (as reported). The bye-laws refuse earth-cutting permission "if the average slope of the topography is more than 30%" and declare such a site "not fit for construction except for plantation" (APBBL 2019, clause 4.39(14)); that is a limit on earth cutting, not on infiltration. The 10° threshold (about 18%) and the shale condition are this Manual's: no Arunachal Pradesh rule sets a slope limit for infiltration. (ii) No infiltration on the floodplain or where the water is high (Clause 4.11, floodplain rule). In sub-areas AR-A (the valley floor), AR-B and AR-C, no deliberate infiltration practice shall be built or credited on land below the 1% AEP flood level of the Dikrong, the Pachin, the Senki, the Siang, the Lohit, the Dibang or the Noa-Dihing or of a nallah; on the palaeochannels and swampy land of the Pachin and Dikrong flood plains; on the margins of a pond (its Zone 1 and Zone 2 under Chapter 7); on flood-plain silts and swamps; or wherever the seasonal high water table is less than 2.0 m below ground. The last condition alone may be set aside where a piezometer record of a full April–November season shows the water table at least 2.0 m below ground and at least 1.0 m below the base of the practice; the others may not. The CGWB gives 1 to 5 m below ground in the semi-consolidated formations of Papum Pare and 2 to 4 m before the monsoon and 2 to 5 m after it in the Dikrong valley, 1.50 to 11.13 m in East Siang, 3.58 m and 3.52 m in Lohit (2008) and 2.62 to 5.50 m in the dug wells of Bhalukpong in the lean period; and 15 of the 27 Arunachal Pradesh stations of its North Eastern Region bulletin stood at 0 to 2 m below ground in August 2025 (as summarised). On such land roof runoff goes to storage for use, the exception for roof water in Clause 8.11.3(c) does not apply, retention is met by storage for use and by surface measures that do not infiltrate below ground, and detention under Chapter 4 is lined and checked for flotation. (iii) Recharge only on tested ground outside both rules (Clause 4.11, recharge rule). Recharge is allowed, with pretreatment, the field test of Clause 8.8.3 and the separation of this Clause, with the seasonal high water table at least 2.0 m below ground, only on the sandy terrace and valley-fill soils of the Naharlagun–Nirjuli–Doimukh valley (NERIST's test at Doimukh found 95.19% sand and a double-ring infiltration rate falling from 12 cm/h to a basic rate of 1 cm/h after 250 to 300 minutes; Dabral et al., 2016) and on the coarse boulder fan heads of the foothills above the water table ("Siwalik group is the recharge zone" and the piedmont plain "is highly permeable", CGWB, East Siang; "The Bhabar is mostly composed of boulders", CGWB, Lohit), away from scarps and avulsion channels. Recharge is a choice, not a duty: the State's stage of groundwater extraction is 0.39% (CGWB, 2024, as summarised). (iv) Springs and their recharge areas. Arunachal Pradesh has no statute that keeps building or drains away from a spring; the Arunachal Pradesh Municipal Corporation Act, 2019 vests "all public streams, springs and works for the supply … of water" in the Corporation. The springs of Papum Pare discharge 0.43 to 2 L/s before the monsoon and 0.02 to 2.4 L/s after it, and "most of the springs become dry during dry season"; in the northern hills of East Siang springs are the only source (CGWB). Within the recharge area of a spring above a town's or village's drinking-water intake, as a hydrogeologist maps it, no paving is laid except for access, no road runoff is led into the ground, and no infiltration facility, soak pit or septic tank is placed; no drain, cut or fill intercepts the flow to a spring, crosses its outlet or buries it; and no infiltration facility, soak pit or septic tank lies within Zone 1 of the spring (Clause 7.4). These rules are set by this Manual; springs were not researched for this Manual, and no spring inventory was found [TBC]. (v) Quality and wells. Iron is the main quality issue: the CGWB found 0.14 to 0.78 mg/L in the springs of Papum Pare and flags iron in East Siang and Changlang, and a shallow well or spring is the first water a recharge structure reaches. No recharge pit, trench, shaft or well shall be placed within 30 m of a dug well or spring used for drinking water; no runoff from roads with heavy traffic, fuel stations, workshops, industrial yards or solid-waste sites is led to any recharge structure; and a recharge structure on a valley floor or fan takes only roof water or runoff that has passed a filtering BMP. (vi) Septic dispersion. Clause 4.16.1 of the APBBL 2019 places a septic tank's dispersion system at least 18 m from any source of drinking water and at least 6 m from buildings; on a slope this puts water into the ground that the hill rule protects. This Manual does not override the bye-law: it recommends that a dispersion trench or soak pit on a slope steeper than 10° or on shale be sited by a geotechnical engineer, downslope of buildings and cuts, and outside the recharge area of any spring, and it refers sewage to Clause 8.9. The 10° trigger, the shale condition, the distance of twice the wall height, the 2.0 m limit, the 30 m distance and the conditions of items (iv) to (vi) are set by this Manual; no Arunachal Pradesh rule on infiltration, soak pits, springs or recharge near wells was found. The seasonal high groundwater table shall be determined under Clause 3.10.2.
8.8.2 Other separation. The base of an infiltration facility shall also be at least 1.0 m above bedrock or any impermeable layer, unless the facility is designed to recharge a fractured or weathered rock aquifer under Clause 8.8.10.
8.8.3 Infiltration tests. The infiltration rate shall be measured at the proposed base level of the facility:
- (a) by a double-ring infiltrometer test (ASTM D3385) for basins, bioretention and permeable pavement;
- (b) by a falling-head borehole or trial-pit soakage test (for example BRE Digest 365) for trenches, soakaways, recharge pits and recharge wells;
- (c) with at least 2 tests per facility, and at least 1 test per 100 m² of infiltration base area or per 50 m of trench length; and
- (d) by a person competent in geotechnical testing, with the results reported on the Infiltration Test Record (Form 8-2).
Tests made in the dry season shall be reported with the groundwater level at the time of test and the seasonal high level of Clause 8.8.1.
8.8.4 Design infiltration rate. The design infiltration rate is the measured rate divided by a safety factor:
- (a) 2.0 where the tests meet Clause 8.8.3(c) and the results vary by no more than a factor of 2; and
- (b) 3.0 otherwise.
8.8.5 Minimum rates.
- (a) Full infiltration (no underdrain) only where the design rate is at least 13 mm/h.
- (b) Partial infiltration, with an underdrain, where the design rate is 3 mm/h to 13 mm/h. Only the volume that infiltrates within 72 hours is credited as retention.
- (c) No infiltration credit where the design rate is below 3 mm/h.
8.8.6 Setbacks for infiltration facilities. Infiltration facilities receiving runoff from roads, parking or other paved surfaces shall be at least:
- (a) 3 m from building foundations, and 5 m from a basement;
- (b) 1.5 m from a property boundary, unless the neighbour agrees in writing;
- (c) 30 m from a drinking-water well or borewell;
- (d) 15 m from a septic tank or soak pit; and
- (e) 6 m from the crest of a slope steeper than 1V:3H, unless a geotechnical report shows the slope remains stable.
Roof-only runoff to recharge structures is subject to (a) and (b) only, and to Clause 8.11.3.
8.8.7 Drawdown and verification. Every infiltration facility shall empty within 72 hours at the design rate (Chapter 4), and shall be tested after construction (Clause 10.9.3).
8.8.8 Hotspots. Runoff from the following shall not be infiltrated without treatment, and shall not be infiltrated at all where (d) or (e) applies:
- (a) fuel stations;
- (b) vehicle workshops, washing bays, and bus and truck depots;
- (c) industrial yards and loading areas where hazardous materials are handled or stored;
- (d) solid waste transfer stations and landfill areas; and
- (e) land known or suspected to be contaminated.
Treatment for (a) to (c) shall include an oil-grit separator and a lined filtering BMP before any infiltration.
8.8.9 Sandy coastal aquifers. This Clause applies only to coastal sand aquifers. Arunachal Pradesh has none, so the Clause has no effect in the State; it is kept only so that the clause numbers stay unchanged. The sandy terrace and valley-fill soils of the Naharlagun–Nirjuli–Doimukh valley, the boulder fans of the foothills and the alluvium along the Dikrong, the Siang, the Lohit and the Noa-Dihing are not coastal sand areas: Clause 8.8.1 applies there in full, with the floodplain rule and the recharge rule of Clause 4.11, and the reduced separation of item (d) does not. In coastal sand areas:
- (a) infiltration is the preferred means of meeting retention and the WQv wherever Clause 8.8.1 is met;
- (b) storm drains shall not be designed to lower the groundwater table: inverts below the seasonal high groundwater table shall be watertight, with no weep holes or subsoil drains that discharge groundwater to the outfall, unless a hydrogeological report shows no harm to the freshwater aquifer;
- (c) no long-term pumping of groundwater into storm drains shall be approved (for example basement dewatering); and
- (d) in notified coastal sand areas, roof-only runoff may be infiltrated with a separation of not less than 0.5 m to the seasonal high groundwater table, provided a groundwater mounding check shows that the mound stays at least 0.3 m below the facility base and does not reach adjacent foundations or basements. No other runoff may use this reduced separation;
- (e) where neither the 1.0 m separation nor clause (d) can be met, the site shall use surface retention that does not infiltrate below ground (for example shallow vegetated depressions, disconnection of roofs onto lawns, and reuse), and detention under Chapter 4.
8.8.10 Laterite and hard-rock areas. In laterite and hard-rock terrain (for example the gneiss and schist of the Bomdila Group and the higher ranges round Bomdila, Dirang, Tawang and Anini, with thin soils over rock and snow in winter, and the Siwalik sandstones, shales and boulder beds of the foothills round Itanagar, which are not hard rock in the usual sense but whose hill slopes are "covered by residual soil or slope debris" (CGWB, Papum Pare), and the Gondwana group that "acts as a run off zone" (CGWB, East Siang); on any slope steeper than 10° and on Siwalik shale at any slope the hill rule of Clause 4.11 applies first under Clause 8.8.1, and no recharge into rock is credited (Clause 4.11, recharge rule)):
- (a) tests shall be made at the facility base, below any surface crust or hardpan;
- (b) recharge into weathered or fractured rock is permitted only for roof runoff, or for runoff that has passed through a filtering BMP, because fractures give little treatment; and
- (c) infiltration on or above slopes shall be checked for slope stability.
8.8.11 Delta clays and black cotton soils. In the flood-plain silts and swamps of the Dikrong, the Pachin, the Siang, the Lohit and the Noa-Dihing, the palaeochannels and swampy land of the Pachin and Dikrong flood plains (CGWB; the Master Plan of Itanagar Capital Region-2031), the silted beds of ponds and the margins of reservoirs, and the clayey residual soil, colluvium, fill and slide debris of the hills, and in expansive black cotton soils:
- (a) infiltration facilities will usually fail Clause 8.8.5 and need not be tested where the soil survey (Chapter 3) shows HSG D; and
- (b) where infiltration is used near buildings on expansive soils, the setback of Clause 8.8.6(a) shall be doubled.
Commentary. The 1.0 m groundwater separation is a core requirement of this Manual. The other values in this Clause (the 1.0 m bedrock separation, test numbers, safety factors, minimum rates and setbacks) are typical of US and UK practice and have no Arunachal Pradesh precedent. The well setback in Clause 8.8.6(c) applies to runoff from paved surfaces, not to roof water. Arunachal Pradesh RWH practice routes roof water into open wells and recharge wells, and Clause 8.11 keeps that practice.
No map of hydrologic soil groups for Arunachal Pradesh and no soil series of the National Bureau of Soil Survey and Land Use Planning were found [TBC], and the only measured infiltration rate in the State found for this Manual is NERIST's double-ring test at Doimukh: a soil of 95.19% sand, whose rate fell from 12 cm/h to a basic rate of 1 cm/h after 250 to 300 minutes (Dabral et al., 2016). Every other infiltration design needs the tests of Clause 8.8.3. The ground is of four kinds. In the foothills round Itanagar, Papum Pare is "underlain mostly by Siwalik group of rocks", "the Siwalik Hills form hogback topography", hill slopes are covered by residual soil or slope debris, and the older metamorphic formations are "overthrusted over the Younger Tertiary Siwaliks" (CGWB, Papum Pare). In the valleys there are "Quaternary alluvium and terrace deposits", an intermontane valley between Naharlagun and Nirjuli, and an alluvial plain "along the wide flood plain areas of Pachin and Dikrong rivers" with palaeochannels, swampy land, terraces and bars; "The soils in the valley areas are sandy loamy in texture with high acidic content" (CGWB). On the eastern fans "Siwalik group is the recharge zone" and the piedmont plain "is highly permeable" (CGWB, East Siang), and "The Bhabar is mostly composed of boulders while flood plain is composed of fine sand and silt" (CGWB, Lohit). In the high ranges the gneiss and schist of the Bomdila Group carry thin soils, and the upper reaches of Tawang are "mostly devoid of vegetation, due to heavy snowfall" (CGWB). The water is shallow on the valley floors: 1 to 5 m below ground in the semi-consolidated formations of Papum Pare and 2 to 4 m before the monsoon and 2 to 5 m after it in the Dikrong valley; 1.50 to 11.13 m in East Siang; 3.58 m and 3.52 m in Lohit (2008); 2.62 to 5.50 m in the dug wells of Bhalukpong (CGWB); and 15 of the 27 Arunachal Pradesh stations of the CGWB's North Eastern Region bulletin at 0 to 2 m below ground in August 2025 (as summarised). Iron is the main quality issue (0.14 to 0.78 mg/L in the springs of Papum Pare; flagged in East Siang and Changlang, CGWB). Groundwater is not short: the State's stage of extraction is 0.39% (CGWB, 2024, as summarised). Water put into the ground is a hazard as well as a resource: on the Siwalik slopes it raises the pore pressure in slopes that slide (NEER reading), and the landslide at Laptap on 11 July 2017, after three days of rain, killed 14 people (some reports give up to 16; as reported); on the valley floors it reaches the shallow wells and springs first. The CWC report for subzone 2(a) uses a loss rate of 0.24 cm/h, about a quarter of the basic rate at Doimukh, which is consistent with catchment-scale saturation in the monsoon (NEER reading; Chapter 3). This Manual's interim soil groups follow from these: Siwalik slopes with residual soil and slope debris C (D on cut slopes, fills and shale); the terrace and valley sands of the Naharlagun–Nirjuli–Doimukh valley A to B by texture, with the water-table limit; the boulder fans A; flood-plain silts and swamps C to D (D where waterlogged); the gneiss and schist of the high ranges C to D; and urban fill C (D if clayey or compacted) (Chapter 3). The State therefore needs three rules, not one (Clause 4.11). On the tested terrace sands of the capital's valley and the coarse fan heads above the water table, recharge is allowed, with pretreatment, as a choice rather than a duty. On hill slopes, on shale, on colluvium, slope debris and fill and in landslide zones, no water is put into the ground on purpose, under the hill rule. On the floodplain, round ponds and wherever the water table is within 2.0 m, no infiltration is built or credited, under the floodplain rule. Everywhere, runoff from roads and open land goes to surface systems and never directly to a recharge well, borewell or shaft (Clause 8.11.3(b)). Clause 8.8.9 has no effect in Arunachal Pradesh, which has no coast.
Figure 8.3 — Infiltration trench in section: pretreatment sump, aggregate-filled trench in geotextile, observation well, overflow, the 1.0 m minimum separation to the seasonal high groundwater table, and setbacks to wells and foundations. Original drawing for this Manual, adapted from the Georgia Stormwater Management Manual, 2016 (Vol 2), and CIRIA, The SuDS Manual (C753), 2015.
8.9 Sewage cross-connections and dry-weather flow
8.9.1 No sewage in storm drains. No sewage or sullage (grey water from kitchens, bathrooms and laundries), septic tank effluent, or trade effluent shall be connected to, or discharged into, any storm drain, by any pipe, channel or opening.
8.9.2 Condition of approval. Before the completion certificate, the Applicant shall show, by a dye or smoke test witnessed by the Authority or the sewerage agency, that every sewage and sullage outlet on the site discharges to a sewer or to an approved on-site system, and that none discharges to a storm drain. Any existing cross-connection on the site shall be removed as a condition of approval, including on redevelopment and on additions to existing buildings.
8.9.3 Where no sewer exists. Where no sewer is available, sewage and sullage shall go to an approved on-site or decentralised treatment system. The treated effluent of such a system may be discharged to a storm drain only with the written consent of the Arunachal Pradesh State Pollution Control Board (APSPCB) and the drain owner.
8.9.4 Public drains: DWF survey. Every ULB in a Tier A area shall survey its storm drain outfalls to waterbodies for dry-weather flow at least once a year, before the monsoon, and record:
- (a) the outfalls with DWF;
- (b) the estimated DWF rate; and
- (c) the upstream sources found by tracing, CCTV, dye or smoke testing.
The results shall be published in the register of Clause 10.17.
8.9.5 DWF interception. Until the sources are removed, every outfall to a waterbody that carries DWF shall have a DWF interceptor that:
- (a) diverts the DWF to a sewer or a treatment plant;
- (b) does not reduce the capacity of the storm drain for the minor or major event (Chapter 6), with its weir or diversion head losses included in the hydraulic design (Chapter 9);
- (c) has a screen ahead of the diversion; and
- (d) is not a substitute for removing the source connections.
8.9.6 Sewage overflows. No new sewage overflow, emergency bypass or pumping station overflow shall be designed to discharge into a storm drain or waterbody, except where the sewerage agency shows that no alternative exists, and then only with screening and with the overflow frequency stated.
Commentary. The prohibition of sewage connections and the removal of existing cross-connections as a condition of approval are core requirements of this Manual, and Clause 1.10.3 allows no variance from them. Sewage in storm drains is the single largest water quality problem of urban drainage in Arunachal Pradesh. It defeats every other measure in this chapter: BMPs designed for stormwater are overloaded, GPTs fill with sludge, and the receiving tanks and channels become sewage lagoons. CPHEEO (2019) notes that Indian drains carry night soil and urine (Part A §9.5). DWF interception (Clause 8.9.5) is an interim measure. It protects the waterbody while the sources are traced and removed, but it can become permanent if the source work is not done, which is why the annual survey and publication of Clause 8.9.4 are required. The annual survey frequency is set by this Manual.
In Arunachal Pradesh no town treats its sewage, and this Clause is the normal case everywhere. "No ULB is treating sewage. Even the state capital, Itanagar-Naharlagun, lacks a sewage treatment facility" (observations on the State's report of 10 February 2025, quoted in its affidavit-cum-six-monthly report to the National Green Tribunal in O.A. 606/2018). The Master Plan of Itanagar Capital Region-2031 records the "Absence of a sewerage network, resulting in the sewerage being drained to open or vacant land as well as into ponds"; that "Most of the surface water and sewerage gets mixed up resulting in storm water drains being used as sewers"; that "There is no sewage treatment plant present in the city"; and that "City sewerage is discharged into open drains. The hilly terrain means limited scope for u/g sewer network"; industrial effluents are discharged untreated "into artificial ponds". The State's affidavit reports detailed project reports for "all 27 ULBs", sewage treatment plants for 15 census towns and faecal sludge treatment plants for 12, and 19.89 MLD of sewage in 15 towns against 4.20 MLD of existing treatment capacity (17.30 MLD proposed) and 0.19 MLD of septage against 0.14 MLD; the minutes of 11 April 2025 record that the Naharlagun plant "may be converted into a Septage Plant, and liquid waste may be collected using trucks and tankers"; the observations call it a "skewed strategy", with "3 MLD STP at Itanagar-Naharlagun against an estimated sewage generation of 14.4 MLD and having 4 MLD STP against sewage generation of only 1.2 MLD at Pasighat"; and the amicus curiae found on 20 March 2026 a "complete absence of functional sewage treatment systems" in Itanagar–Naharlagun, with a shortfall of about 16 MLD. The Naharlagun plant, under AMRUT and due in 2020, was still under construction in 2025 (as reported). Three rules already bar what this Clause bars. Clause 4.16.2(c) of the APBBL 2019 says: "Under no circumstances shall effluent from a septic tank be allowed into an open channel drain or body of water without adequate treatment." Section 203 of the Arunachal Pradesh Municipal Corporation Act, 2019 forbids discharging "foul water into a drain provided for surface water" where separate drains exist, and surface water into a foul drain without the Commissioner's permission, and any connection "directly with a storm water overflow drain". Section 194 of the Arunachal Pradesh Municipal Act, 2007 makes a municipality construct drains and sewers and "provide a safe and sufficient outfall" for storm water and sewage "in such manner as may not cause any nuisance, whether by flooding", with a proviso that "no sewage shall be discharged into any watercourse until it has been so treated" from a date the State appoints. And in O.A. 94/2020/EZ, S. D. Loda v. Union of India & Ors., on the Senki, the Pachin and the Dikrong, the National Green Tribunal directed on 5 January 2023 that "no untreated sewage or treated sewage be allowed to enter into the waterbody", with quarterly monitoring by the APSPCB, and on 8 April 2025 asked the State and IMC to file counter-affidavits on the adequacy of the faecal sludge plants (as summarised by the India Environment Portal). The gap is therefore enforcement and the absence of a sewer or septage service, not the rule. The CPCB's list of 2025 places four Arunachal Pradesh stretches in Priority V, all first listed in 2025 "as previously these sanctioned locations were not monitored by the State": the Namchik at Kharsang (BOD 3.2 mg/L), the Senki at Chandranagar, Itanagar, upstream of the Pachin (3.2 mg/L), the Dibang at Roing, upstream (3.6 mg/L) and the Subansiri at Gerukamukh (3.1 mg/L); the Pachin itself is not listed, although the master plan says that rivers "like Pachin flowing through densely populated areas had become a waste disposal site". In Arunachal Pradesh, therefore: (i) every storm-drain and nallah outfall to the Senki, the Pachin or the Dikrong, every outfall to the Siang at Pasighat, the Lohit at Tezu, the Noa-Dihing at Namsai and the Dibang at Roing, and every inflow to a pond used as storage is taken to carry dry-weather flow until the survey of Clause 8.9.4 shows that it does not, and has a DWF interceptor and a screen under Clause 8.9.5 before it reaches the river or pond; (ii) no septic tank or soak-pit overflow is connected to a storm drain or nallah on any site approved under this Manual, with clause 4.16.2(c) of the APBBL 2019 as the local hook; (iii) in the IMC area, every connection approved under section 203 keeps foul water and surface water apart, and where no foul drain exists the Applicant shows on the drawings which route the sullage takes, to a septic tank and dispersion system under clause 4.16, a sewer or a decentralised treatment unit, never to the storm drain; (iv) until sewers exist, a nallah, and a hill-town drain that receives sullage, is designed as a combined channel under Clause 6.3.6(d): for velocities that keep sludge moving in dry weather as well as for the storm flow, with access for cleaning along it, and with covers or screens where it passes homes, because of the smell and the risk to health; and (v) where no sewer or treatment plant exists to receive the intercepted flow, the interceptor delivers it to an interim treatment unit that the APSPCB approves, never to a pond, a spring or a stream. Every interceptor is sized from the measured dry-weather flow of its drain, does not reduce the drain's capacity for the minor and major events (Clause 8.9.5(b)), and passes the storm flow above its capacity on down the drain; at an outfall that the Dikrong or a main stem backs up, it and its chamber are placed above the 1% AEP level or made watertight and work with any gate shut (Clause 5.8.5(a) and (c)); and on a hill stream or nallah that carries boulders, slide debris and garbage in flood, they are placed above its 1% AEP level or protected against its scour and debris (Clause 5.8.5(b); Chapter 9). These conditions are set by this Manual.
8.10 Outfalls to waterbodies: first flush, gross pollutant traps and screens
8.10.1 Requirement. Every new storm drain outfall to a waterbody, and every existing outfall on a drain that is rebuilt, widened or extended, shall have:
- (a) a GPT designed under Clause 8.7.10; and
- (b) first-flush treatment: treatment of the WQv (or Q_wq) of the contributing catchment by the BMPs of Clause 8.7, either on the contributing sites or at the outfall.
8.10.2 Where treatment at the outfall is impracticable. Where land is not available at a public outfall, first-flush treatment may be provided by:
- (a) a proprietary first-flush or hydrodynamic device sized for Q_wq; or
- (b) a treatment wetland or forebay within the waterbody setback (Clause 7.5.1(b)), outside the waterspread.
8.10.3 Screens and trash racks. Screens at outfalls, culvert inlets and pump sumps shall:
- (a) be designed with 50% blockage for hydraulic capacity;
- (b) have an overflow or bypass path so that a fully blocked screen does not flood property;
- (c) have bar spacing chosen for the hazard: closer spacing for litter capture, wider spacing where blockage would cause flooding; and
- (d) be cleanable from a safe platform, with vehicle access.
8.10.4 Existing outfalls. Each ULB shall prepare a programme to fit GPTs and DWF interceptors to its existing outfalls to waterbodies, starting with outfalls to tanks used for drinking water supply and to notified wetlands (Clause 7.12), and shall report progress in the register of Clause 10.17.
Commentary. This Manual requires first-flush treatment and gross pollutant traps at outfalls to waterbodies. Gross pollutants are the most visible form of pollution in Arunachal Pradesh waterbodies, and plastics also block drains and culverts, which links water quality to flooding. The 50% screen blockage matches the grate clogging factor of Chapter 6. Clause 8.10.3(c) warns against fine screens on large drains, which block in the first hour of a storm and cause the flooding they were meant to prevent.
8.11 Rainwater harvesting integration
8.11.1 RWH mandate continues. The rainwater harvesting required by the Arunachal Pradesh Building Bye-Laws, 2019 (clause 9.1: "All buildings having a plot size of 100 sqm while submitting the building plans for sanction shall mandatorily include the complete proposal of rainwater harvesting"; Table 9.1 by building type; clause 9.6, under which public open spaces of more than 500 m² "shall have arrangements for complete utilization and capture of storm water"; clause 9.7, which makes recharge mandatory for all buildings of 500 m² or more and for parks, parking and plazas; clause 9.8's Rainwater Harvesting Cell and inspection before the completion certificate; and Annexure E, whose item 1.7 lets the Authority impose a levy for a failure to provide or maintain it; none sets a storage volume, a release rate or a design storm) continues to apply, subject to the limits of Clause 8.8.1: where clause 9.7's mandatory recharge falls on a site where Clause 4.11 bars infiltration, this Manual states the conflict, requires storage for use in its place, and leaves the Applicant to seek the Authority's relaxation of the bye-law, which this Manual does not override (Chapter 1). This Clause sets how RWH structures are counted under this Manual.
8.11.2 Three different functions. The designer shall keep apart, on the drawings and in the calculations:
- (a) harvesting: storage for use (sumps and tanks);
- (b) recharge: recharge pits, trenches, shafts and wells that put water into the ground; and
- (c) detention: storage with an orifice outlet that is empty at the start of a storm (Chapter 4).
8.11.3 Recharge structures.
- (a) Roof runoff may be led to recharge wells, open wells, recharge pits and shafts after a filter or settling chamber.
- (b) Runoff from roads, parking and other paved areas shall not be led directly into any well, borewell or recharge shaft. It may be recharged only through an infiltration facility that meets Clause 8.8, with pretreatment.
- (c) Recharge structures shall meet the groundwater separation of Clause 8.8.1, measured from the base of the pit or the bottom of the filter media, except recharge wells that receive filtered roof water only.
8.11.4 Credit toward retention and WQv. A recharge structure counts toward the retention volume of Chapter 4 and the WQv only where:
- (a) its infiltration rate has been tested under Clause 8.8.3;
- (b) it empties within 72 hours at the design rate; and
- (c) it has pretreatment.
A harvesting sump counts toward retention only where its contents are used, by a demand stated in the drainage report, within 72 hours (Chapter 4).
8.11.5 No credit as detention. RWH storage does not count as detention unless it is a dedicated volume that is empty when a storm arrives, with an outlet. RWH sumps are assumed full at the start of every monsoon (April–October) design storm (Chapter 4).
8.11.6 Overflow. Every RWH structure shall have an overflow that discharges at grade to the site drainage, never onto a neighbouring plot or into a sewer.
8.11.7 Surface-runoff recharge in public spaces. Recharge trenches, shafts and percolation pits in roads, medians, parks and other public spaces shall meet Clause 8.8 in full, including the hotspot rules for roads with heavy traffic, and shall have a GPT or silt trap at each inlet.
Commentary. The rule that RWH storage does not count as detention is set in Chapter 4. Arunachal Pradesh's building rules make rainwater harvesting compulsory, but they set no storage volume and no detention rule. Clause 9.1 of the APBBL 2019 says: "All buildings having a plot size of 100 sqm while submitting the building plans for sanction shall mandatorily include the complete proposal of rainwater harvesting"; Table 9.1 sets the requirement by building type, and for group housing "Concrete paving to be avoided and permeable materials are to be used for all open parking spaces"; clause 9.6 asks public open spaces of more than 500 m² for "complete utilization and capture of storm water", including "Artificial or natural Storage of storm water runoff from larger sites"; clause 9.7 makes recharge mandatory for all buildings of 500 m² or more and for parks, parking and plazas; and clause 9.8 sets up a "Rainwater Harvesting Cell", with inspection before the completion certificate, 100% monitoring above 1,000 m² with annual verification and a 10% random survey below it. Annexure E makes harvesting mandatory from 100 m² (item 1.1) and not below it (item 1.4) and lets the Authority impose a levy for a failure to provide or maintain it (item 1.7). The bye-laws state that "Rainwater can be harvested to the extent of 55,000 liters per 100sq. meters area per year from rooftops", and the Master Plan of Itanagar Capital Region-2031 says that harvesting "should be mandatory for all new buildings". None of these gives litres of storage per m² of roof, a release rate, a design storm, a test of a recharge pit or a limit on recharge on slopes, and no audit of what has been built was found. In Arunachal Pradesh harvesting is storage and reuse: springs fail in the dry season in Papum Pare (CGWB), and groundwater is not short (stage of extraction 0.39%, CGWB, 2024, as summarised), so recharge is not a design objective. This Manual credits storage of at least 25 L per m² of roof (Clause 4.11), the value of the North-East editions of this series, as retention only through its reuse, and assumes it full at the start of every monsoon design storm; it is never counted as detention. On the tested terrace sands of the Naharlagun–Nirjuli–Doimukh valley and the coarse fan heads above the water table, recharge may be one function of harvesting where Clause 8.8.1 allows it (Clause 8.11.2(b)); on hill slopes, on shale, on colluvium, slope debris and fill, in landslide zones and on land under the floodplain rule, harvesting is for storage and use only, and its overflow goes to a lined drain; where clause 9.7's mandatory recharge falls on such a site, this Manual states the conflict and requires storage in its place, and the Applicant seeks the Authority's relaxation of the bye-law (Clause 8.11.1). RWH serves water supply and recharge. It is usually full, or its soil saturated, by the time a July to September monsoon storm in the foothills, such as those of 11 July 2017 at Laptap and September 2018 at Itanagar, arrives after weeks of rain, which is why it cannot be counted as detention.
Clause 8.11.3(b) has no direct precedent; this Manual sets it because road runoff carries oil, metals and pathogens. A recharge shaft or borewell bypasses the soil that would otherwise filter it and delivers it straight to the aquifer that supplies wells nearby. The CGWB Manual on Artificial Recharge of Ground Water (2007) gives recharge structure types and filter designs; this Manual adds the source-water restrictions.
8.12 Construction-stage erosion and sediment control
8.12.1 ESC plan. Every development with land disturbance of 0.1 ha or more, and every public drainage or road work, shall have an Erosion and Sediment Control (ESC) plan, approved with the drainage report. It shall show:
- (a) the sequence of clearing, earthworks and stabilisation;
- (b) the area exposed at each stage;
- (c) the measures of Clause 8.12.3, with their locations and sizes;
- (d) the protection of infiltration and retention areas (Chapter 10);
- (e) stockpile, concrete washout and fuel storage locations; and
- (f) the inspection and maintenance schedule.
8.12.2 Monsoon timing. Earthworks shall be planned so that:
- (a) the area exposed during the monsoon (April to October) is as small as practicable;
- (b) all completed earthworks are stabilised by vegetation, mulch, matting or paving by 31 March; and
- (c) any area exposed between 1 April and 31 October has sediment controls in place before it is cleared.
8.12.3 Measures.
- (a) Silt fences along the downslope edge of disturbed areas receiving sheet flow, with the area draining to each fence limited as set in Annex 8E.
- (b) Sediment traps for concentrated flow from disturbed areas of up to 2 ha.
- (c) Sediment basins for disturbed areas of more than 2 ha. The storage volume below the outlet shall be at least the greater of the runoff from the 50% AEP (2-yr) 24-hour storm and 250 m³ per hectare of drainage area, with a dewatering outlet that draws water from the surface.
- (d) Inlet protection at every existing drain inlet that receives runoff from the site.
- (e) Stabilised construction exits, with wheel washing where vehicles enter public roads.
- (f) Stockpiles outside Zone 1 of any waterbody setback (Chapter 7), at least 10 m from any drain, and covered during the monsoon.
- (g) Dewatering discharges passed through a sediment basin, settling tank or filter bag, never pumped directly into a drain or waterbody.
- (h) Concrete washout in a lined pit, never into a drain.
8.12.4 Design storm for temporary works. Temporary ESC measures use the rainfall of Chapter 2 with a climate factor of 1.0 (Clause 2.8.2).
8.12.5 Inspection. ESC measures shall be inspected weekly and within 24 hours after every heavy-rainfall event (as defined in Chapter 10), repaired within 48 hours, and cleaned when half full of sediment.
8.12.6 Removal. Temporary measures shall be removed only after the area draining to them is stabilised. Sediment shall be removed from any permanent facility used for sediment control before its as-built survey (Chapter 10).
Commentary. The 0.1 ha threshold is the applicability threshold of Chapter 1. The sediment basin volume of 250 m³/ha is the US EPA Construction General Permit minimum of 3,600 ft³ per acre drained, converted to SI (US EPA, 2022 CGP); the CGP allows the alternative of the 2-year, 24-hour runoff. This Manual requires the greater of the two, because Arunachal Pradesh's 2-year 24-hour depths are high and construction sites are commonly left exposed through the monsoon. The 2 ha division between traps and basins, the 31 March stabilisation date, the 10 m stockpile distance and the inspection frequency have no direct precedent and are set by this Manual. The 31 March date matches the pre-monsoon deadline of Chapter 10. Construction sediment is a direct flood hazard as well as a pollutant: it fills drains, culverts and tanks, and in Arunachal Pradesh cutting debris, slide material and garbage travel with the sediment: the drains along the Bage Tinali–Naharlagun road are reported to be clogged by debris from earth cutting, with an inspection recommending de-silting "upto the Dikrong river" (as reported); the Master Plan of Itanagar Capital Region-2031 finds the drains "chocked with the solid wastes" and records "heavy silting"; in September 2018 a landslide was reported from "the dumping area of NH 415" during the Modirijo and Donyi Polo floods (as reported); and illegal earth cutting along NH-415 was blamed for a mudslide near the Donyi Polo airport (as reported). The APBBL 2019 already give the hooks for sediment control on cut sites, though they set no basin size or inspection, which Clause 8.12 supplies: earth-cutting permission is refused where the average slope exceeds 30% (clause 4.39(14)); a cut is not higher than 3 m (4.39(4)); "It is duty of plot owner to clear/dispose-of soil/debris from site or drain to suitable/safer place" (4.39(8)); and a retaining or breast wall is built "immediately" on completion of the cut (4.39(11)). The stabilisation date of 31 March is set by this Manual, before its season begins on 1 April, because the pre-monsoon months are wet (May at Doimukh brings 505.9 mm, NERIST series) and cut slopes must be stable and walled before the April storms; it is the same date as the desilting and the declaration of Chapter 10, and clause 4.39(11)'s "immediately" applies to every cut whatever its date. The reason given above for the larger basin volume, that the 2-year 24-hour depths are high, holds across Arunachal Pradesh: the capital-region table of Clause 2.3.6(c)(ii) gives 135 mm at 50% AEP (NERIST's Doimukh fit, 115.9 mm in one day, multiplied by 1.13); the interim 50% AEP depths of Clause 2.3.6(d), at 0.42 of the 2% AEP depth, are about 101 mm where that depth is 240 mm (AR-E and the floor of AR-C1) and about 118 mm in AR-D, and more on the wetter foothill plates; and the fifteen NIH-DHAARA cells give 52.5 to 288.6 mm (comparison values only, not design values; Chapter 2), with AMC III through most of the season (Chapter 3); the rule of Clause 8.12.3(c) is kept unchanged everywhere. In Arunachal Pradesh the outlet of a sediment basin or trap under Clause 8.12 discharges to a lined drain or a stable channel and never onto an unprotected slope; no sediment basin or trap is designed to infiltrate where Clause 4.11 bars infiltration, which includes every slope steeper than 10°, all shale and slope debris and all land under the floodplain rule; no spoil, debris or garbage from a site is placed in a stream, hill stream, nallah or pond, within its Zone 1, or on the recharge area of a spring; and a construction site above a spring or in the catchment of a pond or lake keeps its sediment out of every drain that reaches the water.
8.13 Monitoring
8.13.1 Outfall monitoring. Each Tier A authority shall monitor water quality at a representative set of its outfalls to waterbodies, including every outfall to a drinking-water tank or notified wetland. Monitoring shall include:
- (a) dry-weather sampling (Clause 8.9.4), at least once a year before the monsoon; and
- (b) wet-weather sampling of at least three events each monsoon at a set of index outfalls.
8.13.2 Parameters. At minimum: TSS, BOD, COD, faecal coliform, total nitrogen, total phosphorus, oil and grease, and, for industrial catchments, heavy metals. Results shall be compared with the CPCB water quality criteria for the designated best use of the receiving waterbody.
8.13.3 Gross pollutant records. The mass or volume of material removed from each GPT and screen at each cleaning shall be recorded in the O&M records (Chapter 10).
8.13.4 BMP performance monitoring. The State Stormwater Technical Committee shall run a BMP performance calibration programme and shall revise Table 8.3 and Annex 8C from its results.
8.13.5 Publication. Monitoring results shall be published in the register of Clause 10.17.
Commentary. No Arunachal Pradesh programme of stormwater quality monitoring was found during research for this Manual, and CPHEEO (2019) sets no Indian targets. The monitoring in Clause 8.13 is the minimum needed to calibrate Table 8.3 and to show whether DWF interception and source removal are working. The parameter list follows the key pollutants named in CPHEEO's WSUD procedure (TSS, nitrogen, phosphorus and gross pollutants), with BOD and faecal coliform added because of sewage contamination. The monitoring frequencies are set by this Manual.
8.14 Submittal requirements
Every drainage report under this chapter shall include:
- the Water Quality Sheet (Form 8-1): P_ret, P_3m and P_wq; the WQv and Q_wq for each drainage area; the volume retained under Chapter 4; and the BMP serving each area;
- for Tier A: the LoS calculation (ΔCN, required LoS) and the composite VR (Clause 8.6);
- the design of each BMP to Clause 8.7 and Annex 8D, with pretreatment;
- for infiltration and recharge: the Infiltration Test Record (Form 8-2), the seasonal high groundwater level and its source, the design rate, the drawdown time, and the setbacks of Clause 8.8.6;
- the sewage and sullage connection plan and the dye or smoke test record of Clause 8.9.2;
- the GPT and first-flush design for any outfall to a waterbody (Clause 8.10);
- the RWH layout, separating harvesting, recharge and detention (Clause 8.11); and
- the ESC plan (Clause 8.12).
8.15 Review and update
8.15.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). Table 8.3 shall also be reviewed when the calibration programme of Clause 8.13.4 reports, and in any case within 5 years of notification.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A: Engineering Design (§9.5, Ch. 10). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- Mid-America Regional Council and Kansas City Metro Chapter APWA (2012). Manual of Best Management Practices for Stormwater Quality (Tables 4.2–4.6). https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01; MARC factsheet and Supplement. https://www.marc.org/document/apwa-5600-manual-factsheet ; https://www.marc.org/document/apwa-stormwater-standards-supplement
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, 2016 Edition, Vols 1–2. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd Edition. https://did.sarawak.gov.my/web/attachment/show/?docid=clRsMlRycU1lNnFRcnl3eDZnNkJMdz09OjpY0au0UPvQ9zUHVWRMbCKX
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- CIRIA (2015). The SuDS Manual (C753). London: CIRIA.
- PUB, Singapore's National Water Agency. Active, Beautiful, Clean Waters Design Guidelines (current edition).
- Central Ground Water Board (2007). Manual on Artificial Recharge of Ground Water. Ministry of Water Resources, Government of India.
- US Environmental Protection Agency (2022). NPDES Construction General Permit (sediment basin sizing).
- ASTM D3385. Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer.
- BRE Digest 365. Soakaway Design. Building Research Establishment, UK.
- Government of Arunachal Pradesh, Department of Town Planning and ULBs. Arunachal Pradesh Building Bye-Laws, 2019, clauses 4.16, 4.39 and 9.1–9.8, Table 9.1 and Annexure E (Chapter 7 references).
- Government of Arunachal Pradesh. Arunachal Pradesh Municipal Corporation Act, 2019, s.203, and Arunachal Pradesh Municipal Act, 2007, s.194 (Chapter 7 references).
- Government of Arunachal Pradesh, Department of Town Planning and ULBs. Master Plan of Itanagar Capital Region-2031 (sewerage, storm water and environment chapters of the draft report read) (Chapter 7 references).
- National Green Tribunal. O.A. No. 606/2018 (Arunachal Pradesh): affidavit-cum-six-monthly progress report of the State (2025), with the minutes of 11 April 2025 and the observations on the State's report of 10 February 2025, and the observations of the amicus curiae dated 20 March 2026; O.A. No. 94/2020/EZ, order of 5 January 2023 (as summarised) (Chapter 7 references).
- Central Pollution Control Board (2025). Polluted River Stretches for Restoration of Water Quality (Arunachal Pradesh). https://dste.py.gov.in/ppcc/pdf/Laboratory/PRS-2025.pdf
- Central Pollution Control Board. Reply dated 5 January 2026 in O.A. No. 148/2025/EZ, Rakhini Mipi v. State of Arunachal Pradesh (the Dibang at Roing), https://www.greentribunal.gov.in/sites/default/files/news_updates/0a_148_of_25_cpcb_pagenumber.pdf
- Central Ground Water Board, North Eastern Region. Ground Water Information Booklets, Papum Pare, East Siang, Lohit, West Kameng, Tawang and Changlang districts (Wayback Machine captures of cgwb.gov.in); the North Eastern Region water-level bulletin of August 2025 and the dynamic groundwater resources of 2024 (as summarised).
- Dabral, P. P., Kumar, A. and Tana, G. (2016). Determination of surface drainage coefficient – a case study of Doimukh (Arunachal Pradesh), India. Agricultural Engineering International: CIGR Journal 18(4): 1–10 (Chapter 2 references).
- Government of Arunachal Pradesh. Arunachal Pradesh State Action Plan on Climate Change (draft, 2011) (Chapter 2 references); NIH-DHAARA (Chapter 2 references).
- Central Water Commission (1991). Flood Estimation Report for North Brahmaputra Subzone 2(a), Report No. NB/18/1991 (Chapter 2 references).
- Reports of the Naharlagun sewage treatment plant and the Chimpu septage plant (secondary).
- Parliament reply AU1419 on AMRUT 2.0 admissible components. https://eparlib.sansad.in/bitstream/123456789/2988692/1/AU1419_tzCIvw.pdf
Annexes and forms
| Annex / Form | Content |
|---|---|
| 8A | 3-month ARI 24-hour depth and IDF by zone |
| 8B | Redevelopment LoS table and treatment-train composite VR |
| 8C | Arunachal Pradesh BMP performance calibration |
| 8D | BMP design sheets, media specification, plant lists |
| 8E | Erosion and sediment control standard details |
| Form 8-1 | Water Quality Sheet |
| Form 8-2 | Infiltration Test Record |
Commentary. CPHEEO (2019) is the only Indian manual that covers stormwater quality in any detail. Its Chapter 9 reproduces US event mean concentrations, but cautions that "in an Indian context the values would be much higher" because drains receive night soil, urine and food waste, and it sets no Indian numeric criteria (CPHEEO 2019, Part A §9.5). Its Chapter 10 describes water-sensitive urban design, LID and SuDS treatment trains (CPHEEO 2019, Part A Ch. 10). This chapter turns that guidance into requirements. It follows the treatment approach of the MARC/APWA BMP Manual (2012), now merged into APWA 5600 (2025.01), with the Malaysian 3-month ARI water quality storm (MSMA 2, 2012) and the Georgia water quality volume (GSMM, 2016) as tropical and US benchmarks.