About this draft

Status. This is Draft v1.0 of the Jammu and Kashmir Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for the Union Territory of Jammu and Kashmir.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of the Union Territory of Jammu and Kashmir, by its Lieutenant Governor, its Council of Ministers or its Legislative Assembly, or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Housing and Urban Development Department (H&UDD), the Jal Shakti Department or its Irrigation and Flood Control (I&FC) and Public Health Engineering (PHE) wings, the Srinagar Municipal Corporation (SMC), the Jammu Municipal Corporation (JMC) or any Municipal Council or Municipal Committee, the Srinagar Development Authority (SDA), the Jammu Development Authority (JDA), the Town Planning Organisations of Kashmir and Jammu (TPO), the Urban Environmental Engineering Department (UEED), the Lake Conservation and Management Authority (LCMA), the Wular Conservation and Management Authority (WUCMA), or any other agency. Nor has it been adopted, notified or endorsed by the Ministry of Home Affairs or any other ministry of the Union. Where it names a body, such as the Revenue Department, the Public Works (Roads and Buildings) Department (R&B), the Forest, Ecology and Environment Department, the Wildlife Department, the J&K Wetland Authority, the J&K Pollution Control Committee (JKPCC), the J&K State Disaster Management Authority (J&K SDMA), the Jammu & Kashmir Economic Reconstruction Agency (JKERA), a Smart City company, a Deputy Commissioner or a district administration, a dam operator such as the J&K State Power Development Corporation (JKSPDC) or NHPC, the High Court of Jammu & Kashmir and Ladakh, the National Green Tribunal (NGT), or a body of the Union, such as the Central Water Commission (CWC), the Central Ground Water Board (CGWB), the India Meteorological Department (IMD), the National Highways Authority of India (NHAI) or the Central Pollution Control Board (CPCB), it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. A competent authority (for example H&UDD for building approvals, or the Jal Shakti Department for river and flood-basin matters) could adopt it. Until then, the Jammu and Kashmir Unified Building Bye-Laws 2021 (UBBL-2021) as amended, the Srinagar Master Plan 2035 and the Jammu Master Plan 2032 and their regulations, the J&K Development Act, 1970, the J&K Municipal Corporation Act, 2000 and the J&K Municipal Act, 2000, the J&K Water Resources (Regulation and Management) Act, 2010, drainage schemes, orders of courts and tribunals and approval conditions in force continue to apply.

Jammu and Kashmir is a Union Territory. Jammu and Kashmir has been a Union Territory with a Legislative Assembly, not a State, since 31 October 2019, under the Jammu and Kashmir Reorganisation Act, 2019 (No. 34 of 2019). The chapters of this Manual are shared with the editions written for States, and they use the word "State" throughout. In this Manual, "State" means the Union Territory of Jammu and Kashmir, and "State Government" means the Government of the Union Territory of Jammu and Kashmir, consistent with section 3(58)(b) of the General Clauses Act, 1897, under which "State" includes a Union territory. The usage is one of convenience. It does not change who holds any power. Under section 32 of the Reorganisation Act the Legislative Assembly may make laws on any matter in the State List except public order and police, so land, local government, water, drainage, flood control and building regulation are within the Union Territory's own powers: the master plans and the building bye-laws are made by its own government, through H&UDD and the Development Authorities, and not by a body of the Union. The Council of Ministers aids and advises the Lieutenant Governor, except where the Act or a law requires the Lieutenant Governor to act in his discretion (section 53), and executive action of the Government is expressed to be taken in the name of the Lieutenant Governor (section 55). The Act continues the laws of the former State on which this Manual relies, among them the Development Act, the Municipal Corporation Act and the Municipal Act, the Water Resources Act, the Flood Plain Zones Act, 2005 and the Land Revenue Act (Fifth Schedule, Table 4). Some of the bodies this Manual names are bodies of the Union rather than of the Union Territory: CWC, CGWB, IMD, NHAI and NHPC. Ladakh is a separate Union Territory and is not part of the State as this Manual defines it. Chapter 1 repeats the definition.

Supplements. The Manual carries one supplement, for a place that adjoins Jammu and Kashmir but lies outside the Union Territory's jurisdiction. Supplement S01 covers the Union Territory of Ladakh, a Union Territory without a legislature since 31 October 2019, administered by its Lieutenant Governor. Ladakh is a cold desert of the upper Indus and its tributaries, with the towns of Leh and Kargil; the creation of five new districts, seven in all, was approved in April 2026, as the Supplement explains. The supplement has not been adopted, notified or endorsed by the Administration of the Union Territory of Ladakh, the Lieutenant Governor, the Ladakh Autonomous Hill Development Councils of Leh and Kargil, the Municipal Committees of Leh and Kargil or any of its departments or agencies, nor by the Government of the Union Territory of Jammu and Kashmir. What this notice says of the Manual applies to the supplement.

Names. Some places, rivers and gauges have more than one name or spelling in statutes, sources and on IMD and CWC stations:

  • the former State of Jammu and Kashmir was reorganised on 31 October 2019 into two Union Territories, Jammu and Kashmir and Ladakh. Statistics of the former State include Ladakh: its area of 101,387 km² and its extent of 72°31′–80°20′E are not those of the Union Territory, and this Manual does not use them for it. The district map has also changed, and the Union Territory now has 20 districts. The CWC flood estimation report for zone 7 (1994) uses the districts of its time: Kashmir (North), Kashmir (South), Reasi and Udhampur among them, and Mirpur and Muzaffarabad, beyond the Line of Control, whose stations, such as Kotli, are data points of 1994 only; it prints Sonemarg, now in Ganderbal district, under "Ladakh". IMD and CWC sources, and the rainfall data in this Manual, use the districts of their time, and a clause that names a district must be checked against the current list;
  • Jammu is the city, the district and the division, and Kashmir the valley and the division; this Manual says which it means. Kokernag is also written Kukernag; Qazigund Quazigund; Bhaderwah Badarwah or Bhadarwah; Sonamarg Sonemarg, as the CWC report prints it; Akhnoor Akhnur; Basohli Basoli; Chasoti Chishoti; and Ram Munshi Bagh, the gauge on the Jhelum at Srinagar, Rammunshi Bagh. The Wular is also the Wullar; the Doodhganga the Dudhganga; Hokersar Hokarsar, and on the Ramsar list Hokera; Nigeen Nageen, as UBBL-2021 writes it; and Shallabugh Shalbug, as the Srinagar Master Plan writes it. The Tsunth Kol of Srinagar is listed by CPCB as the Chunt Kol. This Manual names the station each figure comes from;
  • CWC's zone 7 ("Western Himalayas", report No. WH/22/1994) is the hydrometeorological region of the CWC flood estimation reports that covers the whole Union Territory. Its boundary with subzone 1(e) ("Upper Indo-Ganga Plains") lies outside it, in Gurdaspur district of Punjab, so the Jammu plains, from Akhnoor and R.S. Pura to Kathua and Lakhanpur, are in zone 7 and no town of the Union Territory is in 1(e). One of the six gauged catchments on which the zone 7 report rests, that of the Sewa project in Kathua district, drains the Union Territory; the Jhelum, the Chenab, the Tawi and the Ujh are not among them. Zone 7 is not one of the four rainfall zones (JK-Z1 to JK-Z4) and five hydrologic sub-areas (JK-A, JK-B, JK-B1, JK-C and JK-D) that this Manual sets in Annex 2A, nor Zones 1 and 2 of a waterbody setback in Chapter 7, nor a "flood zone" under the Flood Plain Zones Act, 2005, which that Act defines by "the maximum probable floods", nor the three drainage zones of the Srinagar Master Plan;
  • where a shared clause names the State's main city or its municipal corporation, this Manual names Srinagar and the Srinagar Municipal Corporation (SMC), whose drainage is pumped and is served by the largest drainage organisation in the Union Territory. Jammu and the Jammu Municipal Corporation (JMC) are named with them wherever the Manual lists bodies. Srinagar and Jammu are the Union Territory's two largest cities, and each has a Development Authority under the J&K Development Act, 1970, SDA and JDA, which prepare and enforce its master plan. The other towns are governed by Municipal Councils and Municipal Committees under the J&K Municipal Act, 2000;
  • the Union Territory has two rainfall regimes and four broad belts of ground. The Jammu plains below the outer hills are made of the Kandi, a belt of boulder-gravel fans at the foot of the hills, through which the khads run and where the water table lies 7–30 m below the ground, and the Sirowal, the finer plain beyond it, where the water table is 2–5 m deep, the ground is waterlogged in places and many wells flow at the surface. The outer and middle hills of the Siwalik and Murree rocks, of alternating sandstone and clay, carry Udhampur, Katra, Reasi, Rajouri, Poonch, Ramban and Banihal, and the inner hills of the Chenab carry Doda, Kishtwar and Bhaderwah. The Kashmir valley is a flat floor of alluvium, of Gurti clay and of Nambal peat, along the embanked Jhelum, where the water table lies within 0–2 m of the ground, with the Karewas, flat-topped tablelands of old lake deposits, raised above it on both sides. The high mountains of the Pir Panjal and the Great Himalaya, above Gulmarg, Pahalgam, Sonamarg and Gurez, are fed by snow. The names describe regions, not administrative units, except where a district bears the same name;
  • the waters have their own names in Kashmiri, Urdu and Dogri, and this Manual explains them where they first appear. A talab (तालाब; تالاب; Kashmiri talāv; pond or tank) is a pond or tank, talāv "an artificial pond, a tank" in Grierson's Kashmiri dictionary (p. 1003) and tālāb "Pond, pool, tank, reservoir of water" in Platts (p. 306); UBBL-2021 writes "Talav" and "talab, village tanks", and the Jammu Master Plan "talabs", and this Manual uses it as its general term for ponds and tanks. In Kashmiri the word talab (طلب) also means "pay, wages" (Grierson, p. 1000), so this Manual always gives the script or the gloss. Natural waterbodies keep their own words: a sar (सर्) is a lake (Grierson, p. 928), as in Hokersar, Khushalsar, Gilsar, Mansar and Surinsar; a nambal (नंबल्) "a grass-grown lake, a lake choked by vegetation, a shallow lake, a marsh, swamp" (p. 637), as in Brari Nambal and Nambal Narkur; and a nāg (नाग्) a spring (p. 624), as in Kokernag and Verinag, though in Urdu (Platts, p. 1116) the word means only a snake. A cashma or chashma (چشمه) is also a spring (Grierson, p. 177; Platts, p. 434). This Manual never calls a detention basin a nāg or a nambal. A kŏl (क्वल्) is a stream, canal or irrigation channel (Grierson, p. 437), as in the Tsunth Kol; it is not Platts' kūl, a bank or pool, which is a different word. The Dal (ḍal, "a lake", Grierson, p. 210) is a name; Grierson records that its flood-gate, the Ḍal-darwāza, closes automatically when the Jhelum rises. A nallah (नाला; نالا; natural or artificial drainage channel) is nāla "an artificial watercourse, a channel, a canal" in Grierson (p. 633) and nālā "A watercourse; channel …, a ravine; a rivulet, brook, canal; a drain, gutter" in Platts (p. 1117), and UBBL-2021 writes "Nallas". A khad (खड्ड; seasonal hill torrent or ravine stream) is the boulder-laden torrent of the Jammu hills and the Kandi, which the Jammu Master Plan says are "transformed into gushing torrents" in the rains; in Grierson (khŏḍ, p. 392) and Platts (khaḍḍā, p. 873) the word means only a pit or hollow, so this Manual always glosses it. Gair Mumkin Khad is a revenue classification, land recorded as uncultivable stream-bed (khad), which the Jammu Master Plan proposes to reduce to the "true Khad"; this Manual uses it only as a revenue term. A rakh is a preserve, "for grass, or game" (Platts, p. 597), and the word survives in the names of reserved wetlands and grasslands, such as Rakh-e-Arth and Hygam Rakh, and in the "State Rakhs" of the Wildlife Department; this Manual uses it only in names and does not use it for marshes in general. A kuhl (कूहल) is a gravity irrigation channel; the Water Resources Act counts "zamindari khuls" among hydraulic works. No Dogri dictionary was consulted for this Manual, and the Dogri senses of talab, khad and kuhl are taken from the plan and statute usage only; and
  • many levels and flows in the sources are not in metric, or not on a stated datum, and there are two systems of river gauges that cannot be tied together. I&FC reads its staff gauges on the Jhelum, the Chenab and the Tawi in feet, on zeros it does not publish, so that readings can go below zero: a flood is declared at 18 ft on its Ram Munshi Bagh gauge and the danger stage is 21 ft, as reported. CWC gives its levels in metres, as transcribed by SANDRP, for the same river at the same place: a warning level of 1,584.87 m, a danger level of 1,585.48 m and a highest flood level of 1,588.99 m (8 September 2014) at Ram Munshi Bagh, with other values in an earlier list, and no source read states their datum [TBC]. This Manual never converts an I&FC reading in feet to metres, and names the gauge and its datum with every level. Flows are given in cusecs (cubic feet a second; 1 cusec = 0.0283 m³/s), often in lakh (100,000): the Jhelum carried 72,585 cusecs at Ram Munshi Bagh in September 2014 and about 1,15,000 cusecs at Sangam.

This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies and laws need a word of explanation:

  • the Jammu and Kashmir Unified Building Bye-Laws, 2021 (UBBL-2021, the form H&UDD's notification of 2025 uses) are the Union Territory's building rules. They were adopted by each local body on a common text, as by the Doda Municipal Council on 21 October 2021, as listed, and were read in the copy published by JMC in the J&K Official Gazette (Extraordinary, Vol. 134, No. 39-4) of 24 December 2021; H&UDD's original notification was not found [TBC]. They were amended by JMC's notification in the Gazette of 9 March 2022 and by H&UDD's S.O. 304 of 1 December 2025, made under section 395(d) of the J&K Municipal Corporation Act, 2000 and section 202 of the J&K Municipal Act, 2000, which brought online scrutiny, deemed rejection after 15 days and online no-objection certificates; a further amendment, S.O. 58 of 26 February 2026, is known only from a listing, and draft amendments of 9 September 2026, reported to be made under section 397 of the Corporation Act, are known only from the press [TBC]. This Manual cites clauses as "UBBL-2021 (as amended), cl. 7.12";
  • the Srinagar Master Plan 2035 (SMP; Town Planning Organisation Kashmir, February 2019) covers a local planning area of 766 km², and the Jammu Master Plan 2032 (JMP) the Jammu area; both are made under the J&K Development Act, 1970. The SROs that notified them (SRO 160 of 7 March 2019 and SRO 90 of 3 March 2017) and the amendments to the JMP of 2022 and 2024 are known only from listings and were not read; a revision of the JMP is reported to be pending [TBC];
  • the J&K Water Resources (Regulation and Management) Act, 2010 (WRA; Act XXI of 2010) gives I&FC control of the bed and banks of water sources, "city channels and flood spill channels", and lets the Government declare a "flood basin" after survey and notification (Part VI). It was read in a copy whose section numbers were stripped, and the numbers this Manual gives were assigned from a title index and must be confirmed against an official copy [TBC]. No flood basin has been found notified under it. The J&K Flood Plain Zones (Regulation and Development) Act, 2005 (Act XVII of 2005) comes into force only on a date the Government appoints by notification; no such notification was found, and this Manual does not treat the Act as in force or any flood plain zone as notified;
  • a Municipal Corporation (SMC and JMC) is constituted under the J&K Municipal Corporation Act, 2000, and a Municipal Council or Municipal Committee under the J&K Municipal Act, 2000; their sections on drains were not read for this Manual [TBC]. In Srinagar, UEED plans, designs and builds sewerage and drainage, with the Town Drainage wings of SMC and of the Directorate of Urban Local Bodies, Kashmir (DULBK); in Jammu, UEED's Sewerage and Drainage Division (West) works within JMC's limits. LCMA, formerly the Lakes and Waterways Development Authority (LAWDA), manages the Dal and Nigeen and their catchment and issues no-objection certificates under S.O. 304, and WUCMA manages the Wular;
  • the Jal Shakti Department has two wings that this Manual names: I&FC, which holds the rivers, nallahs, embankments, flood spill channels and city channels and their gauges, and PHE, which supplies water and registers bore wells; this Manual names the Jal Shakti Department as the State groundwater agency, and CGWB's regional office at Jammu keeps the observation wells. R&B keeps the Union Territory's roads and their drains and culverts, and NHAI the national highways;
  • the J&K Wetland Authority was constituted on 25 November 2020; no wetland had been notified under Rule 4 of the Wetlands (Conservation and Management) Rules, 2017 by September 2024. Seven wetlands, among them Hokersar, Shallabugh and Hygam, are Wildlife Conservation Reserves of the Wildlife Department, first notified by an order of 17 July 1945;
  • J&K SDMA is the Union Territory's disaster management authority. JKERA runs the World Bank's Jhelum and Tawi Flood Recovery Project (JTFRP), approved in 2015 after the floods of 2014, which has funded the rehabilitation of pumping stations in Srinagar and was extended to 31 August 2026, as reported;
  • the High Court of Jammu & Kashmir and Ladakh has acted as "Custodia Legis of river Jhelum and other water bodies" in a public interest case on the floods of 2014 (PIL 8/2017 with PIL 2/2014 and PIL 18/2018), and has kept a 200 m no-construction zone around the Dal since 2002, as quoted; its judgment of 30 October 2025 in that case is reported to keep the 200 m ban but was not read. A 200 m zone around the Wular, ordered in November 2020, is known only from the press. This Manual cites them with their status and treats the lines they draw as binding where they apply; and
  • a tehsil is the revenue subdivision of a district, under a Tehsildar. A district is headed by a Deputy Commissioner (DC).

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any Municipal Council or Committee;
  • SMC is the Srinagar Municipal Corporation and SMP the Srinagar Master Plan 2035. In other editions of this series and in some sources the same letters stand for other municipal bodies; in this Manual they mean only these;
  • JDA is the Jammu Development Authority and SDA the Srinagar Development Authority. The J&K Development Act, 1970, under which both work, is written in full, and so is the Srinagar Smart City company;
  • UBBL-2021 is the Jammu and Kashmir Unified Building Bye-Laws 2021, as amended. It is not the Model Building Bye-Laws 2016 of the Union or the unified bye-laws of any other State or Union Territory;
  • J&K SDMA is the disaster management authority of the Union Territory of Jammu and Kashmir. The Ladakh Disaster Management Authority (LDMA) of Supplement S01 is a different body, and neither acts in the other's territory;
  • HFL is the highest flood level recorded at a gauge, as CWC uses it. It is not a design level, and sources sometimes give different values for the same gauge. WL and DL are CWC's warning and danger levels, in metres; I&FC's "flood declaration" and "danger" stages are readings in feet on its own gauges and are not the same levels. The building rules and plans measure setbacks from three other lines: UBBL-2021 cl. 7.12 from the "edge" of the bank, cl. 5.2.5 from "the highest water level", and the Jammu Master Plan from the Full Tank Level (FTL); Chapter 7 says how each maps onto this Manual's design flood line;
  • FRL (full reservoir level) is used for the reservoirs of the dams on the Chenab and the Ravi, and FSC for the flood spill channel of the Jhelum at Srinagar; and
  • SWD is a storm water drain.

The sense is clear from the context. Kashmiri, Urdu and Dogri terms used in the text, such as talab, sar, nambal, nāg, kŏl, nallah, khad, rakh and kuhl, are explained where they first appear.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Jammu and Kashmir's towns flood, and fail, for three reasons. September 2014 showed the first, when the Jhelum, carried above the floor of the Kashmir valley between its embankments, broke out into Srinagar, 34% of the city's planning area went under water and the floods of that month killed 304 people across the then State, as the CAG counted; 26–27 August 2025 showed the second, when Jammu recorded 380 mm of rain and Udhampur 630 mm in 24 hours, as IMD reported, and the Tawi rose to the highest level recorded on it at Jammu, as reported; and the hill towns of Ramban and Doda showed the third, when the ground under Pernote cracked and slid in April 2024 and the Geological Survey of India found that "ingress of surface runoff through these cracks may have developed the pore pressure".

  1. A valley-floor city behind river embankments, which drains by pumps once the Jhelum rises. Srinagar is built on the flat floor of the Kashmir valley, on alluvium, Gurti clay and Nambal peat, where CGWB found the water table within 0–2 m of the ground over the central valley in November 2014, wells flowing on both sides of the river, and "no scope for artificial recharge to ground water" in Srinagar. The Jhelum runs through the city above the land on either side, between embankments, and its channel at Ram Munshi Bagh carried about 27,000 cusecs, raised to about 32,000 by the first phase of the works that followed 2014, as reported. In September 2014 it carried 72,585 cusecs there and about 1,15,000 cusecs at Sangam upstream, as a study of the flood reports; the flood spill channel, built after the great flood of the early 1900s (the sources give 1902 and 1903) to take 17,000 cusecs past the city, could take only 4,000 by then, as the CAG found. The Srinagar Master Plan 2035 records that 34% of its planning area, 262 km², was flooded, and studies report water up to 16 ft deep that stood for up to 25 days. It was a river flood, not a city storm: Srinagar's own gauges recorded only about 140–152 mm over the four days, while Qazigund, at the head of the valley, recorded 599.8 mm. Once the river reaches flood-declaration stage on I&FC's gauge, the city's gravity outfalls are shut and its drains empty only through pumps: the Master Plan counted 89 drainage pumping stations in 2019, and H&UDD told the Legislative Assembly on 12 February 2026 of 104 permanent dewatering stations of about 2,300 cusecs and 281 mobile units, as reported. Those pumps, spread over the city's drainage area of about 767 km², lift the equivalent of about 0.3 mm of rain an hour, by this Manual's reckoning, so the city holds what it cannot lift; and even an ordinary storm floods it, as the 26.4 mm of 1 August 2019 did the city centre, as reported. The marshes that once held the river's floods have shrunk: Hokersar from 18.75 km² in 1969 to about 13 km² in 2008, when it had "lost nearly half of its flood storage capacity", and the Wular from 157.74 km² in 1911 to 86.71 km² in 2007, as reported, while the flood basins west of the city were built over after 1971, as the Master Plan records.
  2. An outer-hill front whose storms outrun the design maps, and khads narrowed by building and land release. Where the monsoon meets the first ranges above the Jammu plains it brings the Union Territory's heaviest rain, 2,151.1 mm a year at Katra, and the records exceed the national maps. IMD's press release of 27 August 2025 gave 38 cm at Jammu and 63 cm at Udhampur's air force station in the 24 hours to 08:30 that day; Jammu's highest day in IMD's own tables, kept since 1910, had been 299.2 mm on 31 July 1961. The CWC map for zone 7 gives Jammu a 50-year day of about 240–280 mm, and 380 mm exceeds even its 100-year value; Udhampur's 630 mm is about 2.3 times the map's 100-year value there, though the period of record of that gauge was not found in any IMD table read [TBC]. The front has done this before: Batote recorded 316.2 mm and Katra 292.4 mm on 25 September 1988, and in September 2014 Katra recorded 698.6 mm in 72 hours. Through Jammu the khads, which the Jammu Master Plan says are "transformed into gushing torrents" in the rains, run as the city's storm drains; the plan finds that only 20% of the roads have side drains, covering about 40% of the city, that the drains carry "considerable quantities of raw and untreated effluents", and that land recorded as Gair Mumkin Khad is more than 30% of JDA's land, which it proposes to reduce to the "true Khad" fixed with I&FC. Its buffers along the khads are 15 m, or 5 m along the smaller ones, from the Full Tank Level.
  3. Hill towns where water put into the ground moves the ground, and cloudbursts that no gauge measures. The Murree and Siwalik hills on which Ramban, Udhampur, Rajouri and Poonch are built are made of "alternating layers of permeable sandstone and weak impermeable clay", as the Geological Survey of India described the slope at Pernote in Ramban district, where about 35 houses were damaged in April 2024; it recommended "diverting the surface runoff away" from the slope, that "Drains present in the affected slope should be lined/trained", and "No new construction". At Thathri Nai Basti in Doda district in 2023 the Survey reportedly named "poor drainage" among the causes, and a committee of the NGT found "unplanned PVC pipes for the purpose of sewerage disposal to the road side drainage downslope", as reported. JKPCC lists Budgam district and Duksar in Ramban among the places prone to land sinking. Above the towns, the worst storms are not measured at all. The Ministry of Earth Sciences defines a cloudburst as "10 cm/ hour or more" over about 20–30 km², and no gauge in Jammu and Kashmir has recorded that in any primary source read; the automatic weather station at the Amarnath cave recorded 25 mm in the hour of 8 July 2022, which "does not satisfy the criteria for cloud burst", although 16 people died there, as reported; and no gauge recorded the cloudburst at Chasoti in Kishtwar district on 14 August 2025, in which more than 60 people were killed, as reported. Like the debris flows they bring, such events set where towns may build, not how their drains are sized.

Behind all three lie sewage in the drains, the lakes, marshes, springs and talabs that set the level at the outfall, and the dams upstream. In April 2024 Srinagar generated 193.34 MLD of sewage and could treat 62.01 MLD, 32.07%, as JKPCC told the NGT, which also found that "Untreated sewage gets entry into the Dal Lake from areas like Telbal, Lalbazar"; in October 2025 CPCB listed seven polluted river stretches in the Union Territory, among them the Chunt Kol in Srinagar, the Jhelum from its confluence with the Vishav to Baramulla, and the Tawi from Tawi Bridge to the Balol Nallah. The Wular (18,900 ha), Hokersar (1,375 ha), Surinsar–Mansar (350 ha), Hygam (802 ha) and Shallabugh (1,675 ha) are Ramsar sites, and the Dal, with a catchment of about 314 km², drains through the lock and weir at Dal Gate and through the Nallah Amir Khan to the Nigeen and the Anchar, but no wetland in the Union Territory has been notified under the Wetlands Rules, no rule or buffer protects a spring, and most of Jammu's talabs survive only as place names. The Chenab is held by the Dul Hasti, Baglihar and Salal dams, whose gate and flushing operations may now be unannounced, as reported, and the Tawi by a new barrage at Jammu, whose pool level was not found [TBC]. Two laws allow the river's floodplain to be zoned, the Flood Plain Zones Act, 2005 and Part VI of the Water Resources Act, 2010, but no zone or flood basin has been notified under either, and the Srinagar Master Plan's proposal to protect the 25-year floodplain between Lelhar and Lasjan as a "Protected Natural Flood Absorption Basin" is a plan proposal only. And no document of any agency in the Union Territory states a design storm for a drain.

Design for Jammu and Kashmir therefore has to cover two rainfall regimes, divided by the Pir Panjal. The Jammu division follows the south-west monsoon: Jammu receives 1,401.9 mm a year, 77% of it from June to September, with its wettest month in July, and Katra 2,151.1 mm, with its wettest in August; the monsoon reaches Jammu about 28 June and withdraws about 21 September under IMD's new normals, and leaves most of Jammu and Kashmir by 1 October. The Kashmir valley does not: Srinagar receives 697.5 mm a year, only 30% of it from June to September, and its wettest month is March; as the CWC report puts it, Srinagar receives "only 28% of the annual rainfall during south west monsoon season as against over 55% in the months of December - April in association with western disturbances", and Banihal, Batote and Bhaderwah are wettest in February. Storms large enough to design for have come in every season: Srinagar's highest day, 147.8 mm, on 31 January 1930; Gulmarg's 293.4 mm on 20 February 1967; Katra's 261.9 mm on 13 March 2007; and Jammu's 160.0 mm and Basohli's 229 mm in October 1955. The largest floods of both divisions came in September, in 1988, 1992 and 2014, when monsoon moisture met a western trough over the mountains, and the Jammu division's largest days in late August. After the winter's snow, CGWB finds the valley's water levels shallowest in May. Underground, the Union Territory draws 22.28% of its extractable groundwater, and all 149 of its assessed units were safe in 2024; Jammu, Samba and Kathua have been safe in every assessment since 2017, and Srinagar's urban unit, semi-critical in 2022, was safe in 2024.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site, in the ground where the ground can take it and in tanks where a high water table or a slope means it cannot;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the receiving river, khad, nallah, lake, nambal or talab is high, when the river has shut the outfall's gate, when a dam upstream is releasing, or when a drain is choked with debris.

The Manual also sets how public drains, pumping stations, hill roads and their drains, nallahs, khads, rivers, lakes, nambals, talabs, springs and kuhls, outfalls and basin-wide master plans are designed, and how drains in steep catchments are protected against debris and sediment, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Jammu and Kashmir's two regimes: the south-west monsoon from late June to late September in the Jammu division, with its storms against the outer hills, and the western disturbances from December to April, with the snowmelt of spring, in the Kashmir valley and on the Pir Panjal, and to the late-August and September storms in which the two meet; to the Jhelum, embanked through the valley floor, with its flood spill channel, its gates and pumps, the Dal and the Anchar, and the Wular and the marshes of Hokersar, Narkara and Shallabugh that store its floods; to the Chenab under the Dul Hasti, Baglihar and Salal dams; to the Tawi with its barrage at Jammu, the Ujh, the Basantar and the Devak, and the Ravi below the Ranjit Sagar dam; to the khads of the Kandi and the outer hills; to the boulder fans of the Kandi, the Sirowal, the sandstone and clay of the Siwalik and Murree hills, the Karewa tablelands, the alluvium, Gurti clay and Nambal peat of the valley floor, and the moraine and snow-fed slopes of the high mountains; to the sars, nambals, nāgs, talabs and kuhls; and to towns built below river embankments and on slopes across the natural lines of drainage.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes, including IRC:SP:42-2014 on hill roads, and the NDMA urban flood guidelines are also used. The drainage chapter of the IRC's hill road manual, IRC:SP:48, was not read for this Manual.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Report for zone 7, Western Himalayas (1994), as the interim source for the whole Union Territory. It rests on only six gauged catchments, of which one, the Sewa in Kathua district, drains the Union Territory; it warns against using its relations without checking them, and does not apply them to snow-fed catchments, which this Manual leaves to site-specific study with a screening for glacial lake outbursts, landslide lakes, debris flows and avalanches. Its ratios of the short-duration to the 24-hour rain, 0.425 for one hour, are used across the Jammu plains, the hills and the Kashmir valley: the hours they give at Srinagar and Gulmarg lie above or around the largest hours recorded there (32–40 mm and 62 mm), and the lower ratios of the long storm of 2014 do not justify lowering them. Inside the closed low that the maps draw over Srinagar, this Manual takes the enclosing contour, never a lower value. It checks the design day against the largest reliable days recorded nearby, and the 380 mm recorded at Jammu in August 2025, which IMD's own tables allow to be checked, raises the 100-year day within 25 km of the Jammu gauge to that value. IMD's national set of rainfall intensity curves (Das et al., 2022) has panels for Srinagar and Jammu, but both repeat the curve printed for many other cities, and the 100-year day that the Srinagar panel implies, about 360 mm, is more than twice the largest day recorded there in over a century; they are not used. The gridded rainfall of NIH-DHAARA is used only to cross-check the 24-hour depth in the Jammu plains, never for the hour, because its ratios of the hour to the day are implausibly low.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. UBBL-2021 as amended by JMC's notification of 9 March 2022 and by S.O. 304 of 1 December 2025; the Srinagar Master Plan 2035 and the Jammu Master Plan 2032 and their regulations, under the J&K Development Act, 1970; the J&K Water Resources (Regulation and Management) Act, 2010; the J&K Flood Plain Zones (Regulation and Development) Act, 2005, which is not in force; the J&K Municipal Corporation Act, 2000 and the J&K Municipal Act, 2000; the Jammu and Kashmir Reorganisation Act, 2019; the Wetlands (Conservation and Management) Rules, 2017 and the constitution of the J&K Wetland Authority in 2020; and the orders of the High Court of Jammu & Kashmir and Ladakh on the Jhelum and the Dal, and of the NGT on the Dal, the wetlands, the polluted stretches of the Jhelum and the Chenab, and land sinking at Pernote and Thathri. This Manual follows them or, where disclosed, makes them stricter. The statutory orders that notified the master plans, the later amendments to UBBL-2021, the Municipal Acts' sections on drains, an official copy of the Water Resources Act with its section numbers, and the Dal judgment of 30 October 2025 were not read. Every rule cited must be checked against the current text.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 5–25 years for road drains and 10–50 years for culverts, by class of road and size of culvert. An engineer designing a drain in Jammu and Kashmir can cite 1, 2, 5, 10 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period. The State Action Plan on Climate Change of the former State (2012–13) expects the intensity of rainfall to rise by 1–2 mm a day and annual rainfall by 5–13% by the 2030s, but gives no factor for design, and the observed trends at the valley's stations are mixed.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has panels for Srinagar and Jammu, but both repeat a curve printed for many other cities: the Srinagar panel gives about 109 mm in the 100-year hour, where the largest hours recorded at Srinagar are 32–40 mm, and implies about 360 mm in the 100-year day, where the largest day recorded since 1901 is 147.8 mm. The one CWC report that covers the Union Territory dates from 1994 (zone 7); its maps give Srinagar a 50-year day of less than 120 mm and Jammu one of about 240–280 mm, but Jammu recorded 380 mm in a day in 2025, and the hour it implies for Jammu, about 102–119 mm for 50 years, has never been tested against an hour recorded at a Jammu gauge, because no such record has been published. The only published curve for a town of the Union Territory, for Kupwara, does not reproduce its own tabulated intensities.

Jammu and Kashmir has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of H&UDD, UEED, I&FC, SMC, JMC, SDA, JDA or any other body that fixes a return period, a runoff coefficient, a time of concentration, a minimum drain size or a freeboard for town storm drains. The drainage master plan and detailed project report prepared for about 767 km² of Srinagar in 2023 design the storm drains "separate from the sewage system", as reported, but publish none of these values; the Srinagar Master Plan sets "stormwater performance standards" of 100% coverage and no waterlogging, and calls for detention and retention "source controls", without a return period, a runoff coefficient or an intensity; the Jammu Master Plan says that a storm-water detailed project report is "to be prepared immediately after the approval" of the plan, and none was found; and the roads rebuilt after 2014 under JTFRP follow the IRC codes. These are plans and projects, not a standard. This Manual is offered as a technical companion to UBBL-2021, the Srinagar and Jammu Master Plans, the Water Resources Act and the Flood Plain Zones Act: it supplies the design storm, detention, slope, water-level and buffer values that they leave open. It has not been adopted by H&UDD, the Jal Shakti Department or any other body. In particular:

  • UBBL-2021 requires rainwater harvesting, but not detention. Chapter 10 requires every building on a plot of 100 m² or more to "mandatorily include the complete proposal" for rainwater harvesting, makes recharge mandatory above 500 m², requires public open spaces above 500 m² to capture storm water, asks group housing to use permeable paving for open parking, and sets up an inspection before completion; it describes a yield of "55,000 litres per 100 sq. m." a year but sets no storage volume. The Srinagar Master Plan makes storage mandatory only for plots of 1,000 m² or more and for group housing. No rule requires on-site detention, limits peak runoff, sets "zero runoff" or deals with basements that flood; and on the valley floor, where the water table is within 2 m of the ground, a recharge pit can only fill with groundwater;
  • The setbacks are the widest in this series, but they are measured from three different lines. UBBL-2021 cl. 7.12(b) keeps building 50 m from the edge of the Chenab, the Jhelum, the Tawi, the Ravi, the Ujh "or any other river/khad", 30 m from the Mansar, Surinsar, Wular, Nageen, Manasbal and other lakes, and 20 m from rivulets and the Ranbir and Sindh canals, "or as per building regulation whichever is more", and cl. 5.2.5 keeps a green buffer "minimum 30 m from the highest water level" along nallahs and rivers. The Srinagar Master Plan sets buffers of 20–200 m around its lakes, marshes and nallahs, measured from their edges, and the Jammu Master Plan sets 50 m along the Tawi, the Devak and the Basantar (30 m in built-up areas), 15 m along the Balol, Thather and Bhalwal khads and 5 m along the others, measured from the Full Tank Level. The High Court has kept 200 m around the Dal. No rule says where the edge, the highest water level or the Full Tank Level lies on a khad or a nallah, or sizes a buffer by the flood it carries;
  • The flood-zoning laws have never been used. UBBL-2021 cl. 7.12(a) leaves flood areas to I&FC "or the flood zonation maps notified by the department from time to time", and none was found; the Flood Plain Zones Act, 2005 has not been brought into force, and no flood basin has been declared under the Water Resources Act; the Srinagar Master Plan records I&FC's zonation of 125 km² of its area as undevelopable and 136.50 km² as vulnerable, and proposes the Lelhar–Lasjan basin, but nothing has been notified. This Manual offers a technical method for drawing a design flood line and corridors (Chapter 7); it does not replace any line that the State notifies, a master plan draws or a court orders, and where such a line binds and is wider, it governs;
  • The slope rules stop building, not infiltration. UBBL-2021 asks for contours at 0.3 m where a site slopes more than 1 in 20, a plinth of at least 45 cm and sloping roofs in snowfall areas whose water may be piped to a drain, but no rule restricts soak pits, recharge pits or infiltration trenches on slopes, on the clay and sandstone of the hills or above a cut or retaining wall, and the rainwater rule applies on the slopes of Ramban and Doda as on the plains; and
  • No document sets the river, lake or khad level for which an outfall is designed. Seven CWC sites in the Union Territory have levels, known from SANDRP's transcriptions, such as the danger level of 1,585.48 m and the highest flood level of 1,588.99 m (2014) for the Jhelum at Ram Munshi Bagh and the highest flood level of 321.1 m (2025) for the Tawi at Sidhra; I&FC reads the same rivers in feet on gauges whose zeros are not published; the khads and nallahs are ungauged; and the levels of the Dal, the Anchar and the Wular, and of the Tawi barrage, were not found on a stated datum, or only in the press. Danger levels and highest flood levels are flood-warning levels and records, not design levels.

So each agency and each local body interprets the central manual its own way. SMC and JMC, the Municipal Councils and Committees, SDA and JDA, UEED and the Town Drainage wings of SMC and DULBK, I&FC and PHE, R&B, NHAI, LCMA and WUCMA, the Smart City companies, JKERA, their consultants and funding agencies fill the gaps differently. No rule divides the drains between them: in Srinagar a drain may be designed by UEED, kept by SMC's or DULBK's Town Drainage, pass under a road of R&B, end at a pumping station on the embankment and discharge through a gate that I&FC controls on a river whose banks I&FC holds, and every outfall to a river, a flood spill channel or a city channel needs I&FC's consent; in Jammu the roadside drains of the roads are the storm drains, carry sewage, and end in khads that are partly recorded as Gair Mumkin Khad. The pumping stations of Srinagar are counted differently from year to year (about 56 in the World Bank project's papers of 2015, 89 in the Srinagar Master Plan of 2019 and 104 in 2026, as reported), and their capacities and sump levels were not found in any public list [TBC]. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one standard for the Union Territory:

  • one source and method for design rainfall across the Union Territory, in four rainfall zones and five hydrologic sub-areas, with a checked station analysis to govern where one exists, the zone 7 ratios throughout, the enclosing contour inside the closed low over Srinagar, a check of the design day against the largest reliable days recorded nearby, which raises the design day around Jammu to its record of 2025, two design cases for the Kashmir valley floor, a summer storm and a long western-disturbance or snowmelt event; and, in the snow-fed catchments of the high mountains, site-specific hydrology with a screening for glacial lake outbursts, landslide lakes, debris flows and avalanches (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater check for outfalls to rivers, khads, nallahs, lakes, nambals, talabs and reservoirs, against a design river or lake level: CWC's levels where they exist, I&FC's stages in feet with their gauge named and never converted, the levels of the dam and barrage operators and the releases of the dams upstream, and, on the ungauged khads and nallahs, surveyed flood marks and a 1% AEP study that allows for debris; and, wherever the Jhelum can shut an outfall, a check with the outfall closed for the time the river stays high, with the drains, storage and pumps analysed together (Chapter 5);
  • a design flood line, and corridors and setbacks along rivers, khads and nallahs and around lakes, nambals, talabs and springs, proposed by this Manual for use where nothing wider binds, with the 50, 30 and 20 m lines and the 30 m green buffer of UBBL-2021, the buffers of the master plans and the 200 m of the High Court wherever those are wider; the marshes that store the Jhelum's floods kept as storage; and land recorded as Gair Mumkin Khad released only after a hydraulic study of the functional khad (Chapter 7);
  • recharge first on the Kandi fans, with protection for Jammu's groundwater supply, and none on the floor of the Kashmir valley or where the water table rises within 2 m of the ground, where rainwater is stored for use; no deliberate infiltration on slopes steeper than 10°, on the clay and sandstone of the Siwalik and Murree hills, in areas of land sinking such as Pernote and Thathri, on slide debris, or above a cut slope or retaining wall, unless a geotechnical certificate allows it; roof runoff to the storage UBBL-2021 already requires, with its overflow to lined drains; sewage kept out of roadside drains on slopes; protection of springs, talabs and kuhls; and treatment where drains carry sewage (Chapter 8);
  • debris racks and traps, allowances for sediment and blockage, energy dissipation in steep drains, flap gates and pumping stations with standby power on the valley floor, and hill-road drainage that never discharges onto an unprotected slope (Chapters 6 and 9), with drains cleared across the Union Territory by 31 May, a post-winter clearance and a test of every pump in the Kashmir valley by 15 March and a second clearance there by 15 August, standby kept to 31 October for the late storms, and inlets kept clear of snow and ice in winter (Chapter 10); and
  • basin-wide master plans, so that the agencies that share a basin plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, a Development Authority in a master plan, or H&UDD can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 cl. 7.1.4 and 8.5.1; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Jammu and Kashmir Reorganisation Act, 2019 (No. 34 of 2019), ss. 13, 32, 53 and 55 and Fifth Schedule, Table 4; J&K Unified Building Bye-Laws, 2021, J&K Official Gazette (Extraordinary) Vol. 134 No. 39-4 of 24 December 2021 (JMC), cl. 2.6, 2.18, 5.2.5, 6.1, 6.20 and 7.12 and ch. 10, the JMC notification of 9 March 2022, and H&UDD S.O. 304 of 1 December 2025; Srinagar Master Plan 2035 (Town Planning Organisation Kashmir, February 2019), §§4.2, 8.2.3, 13.3 and 14.4.4.2 and Tables 8-2 and 8-3; Jammu Master Plan 2032, §§2.4, 5.1.3, 7.3.3, 11.1.3 and 12.2.3; J&K Water Resources (Regulation and Management) Act, 2010 (Act XXI of 2010); J&K Flood Plain Zones (Regulation and Development) Act, 2005 (Act XVII of 2005), ss. 1–4; MoEFCC, list of Ramsar sites of India (31 January 2024); High Court of Jammu & Kashmir and Ladakh, PIL 8/2017 with PIL 2/2014 and PIL 18/2018, order of 29 May 2024, and PIL 159/2002 (as quoted and reported); NGT O.A. 504/2024 (JKPCC report of 14 August 2024), O.A. 239/2024 (Forest, Ecology and Environment Department report of 9 September 2024), O.A. 413/2025 (JKPCC report of March 2026, with CPCB, Polluted River Stretches, October 2025) and O.A. 642/2024 (JKPCC report of 13 September 2024, with the GSI note on Pernote); CAG Report No. 4 of 2016 (Disaster Management, Jammu and Kashmir) and CAG audit of the Prime Minister's Development Package (2021); CWC, Flood Estimation Report for Western Himalayas – Zone 7 (WH/22/1994), Annexes 3.1, 4.3 and 4.4 and Plates 8–10, read by eye; CWC levels as transcribed by SANDRP (2018 and 2022); IMD, Extremes of Rainfall and Temperature (up to 2012), climatological normals 1991–2020, monsoon onset and withdrawal normals (2020), Meteorological Centre Srinagar station pages, and press release of 27 August 2025; MoES reply in the Lok Sabha (27 July 2022); Das et al. (2022), MAUSAM 73(4); NIH-DHAARA; Ray et al. (2015) on the floods of September 2014; Malik (2021), Natural Hazards 110(3); Grierson, A Dictionary of the Kashmiri Language (1916–1932), and Platts, A Dictionary of Urdū, Classical Hindī, and English (1884); CGWB, Dynamic Ground Water Resources of Jammu and Kashmir 2017–2024, NAQUIM reports for the Kashmir valley and the Jammu plains, and district booklets; Government of Jammu and Kashmir, State Action Plan on Climate Change (2012–13); World Bank, Jhelum and Tawi Flood Recovery Project (P154990); reports of the floods of 2014, 2022 and 2025, of the Srinagar drainage master plan, of the pumping stations and of the river gauges (press and secondary sources).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Supplements. The supplement follows the annexes. It applies the Manual to the Union Territory of Ladakh and states where its rules differ.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Lakes, Marshes (Nambals) and Talabs (Ponds) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

Supplements

No. Title Status
S01 Ladakh (Union Territory) Not adopted by the Administration of the Union Territory of Ladakh

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Working assignment of drainage elements under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Jammu and Kashmir
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Jammu and Kashmir locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies
7E.2Springs, streams and channels
7E.3Land and Revenue classes
7E.4Terms not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published
S1.1Modifications to the Manual for Ladakh
S1.2Roles in Ladakh
S1.3Local terms

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3A valley-floor town behind the river and a Jammu Kandi town: lakes, nambals, khads and talabs. Panel A: a Kashmir valley-floor town behind an embanked river, its drains to a gated gravity outfall and a pumping station over the bund, a lake with a gated outlet, a nambal kept as flood storage downstream, a flood spill channel, sediment traps before the lake, and no infiltration where the water table is within 2 m. Panel B: the Jammu Kandi and Sirowal, with Siwalik hills, khads crossing the Kandi fan and its recharge zone, the spring line, a talab, the waterlogged Sirowal, and a hill-town slope with lined drains and no soakaways
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
AEP Annual exceedance probability
AMC Antecedent moisture condition
APWA American Public Works Association
ARF Areal reduction factor
AWS Automatic weather station
BOD Biochemical oxygen demand
BPIA Building Permit Issuing Authority (UBBL-2021)
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CGWA Central Ground Water Authority
CGWB Central Ground Water Board
CN Curve number (SCS/NRCS method)
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
CSE Centre for Science and Environment
CWC Central Water Commission
DC Deputy Commissioner
DDMP District Disaster Management Plan
DL / WL Danger level / warning level (CWC)
DPR Detailed project report
DULBK Directorate of Urban Local Bodies, Kashmir
DWF Dry-weather flow
EIA Environmental impact assessment
ESC Erosion and sediment control
FAR Floor area ratio
FER Flood Estimation Report (CWC)
FRL / MWL Full reservoir level / maximum water level
FSC Flood spill channel (of the Jhelum at Srinagar)
FSTP Faecal sludge treatment plant (Supplement S01)
FTL Full Tank Level (the line from which the Jammu Master Plan 2032 measures its buffers)
GLOF Glacial lake outburst flood
GSI Geological Survey of India
GWRA Ground water resource assessment (CGWB)
H&UDD Housing and Urban Development Department, Jammu and Kashmir
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Jammu and Kashmir)
HFL High flood level (the highest level recorded at a gauge)
HGL Hydraulic grade line
HSG Hydrologic soil group
I&FC Irrigation and Flood Control, a wing of the Jal Shakti Department
IAF Indian Air Force (the IAF station at Udhampur, an IMD rain gauge)
IDF Intensity–duration–frequency
IMD India Meteorological Department
IMDAA Indian Monsoon Data Assimilation and Analysis (a regional reanalysis)
IRC Indian Roads Congress
J&K SDMA Jammu and Kashmir State Disaster Management Authority
JDA Jammu Development Authority
JKERA Jammu & Kashmir Economic Reconstruction Agency
JKPCC Jammu and Kashmir Pollution Control Committee
JKSPDC Jammu and Kashmir State Power Development Corporation
JMC Jammu Municipal Corporation
JMP Jammu Master Plan 2032
JTFRP Jhelum and Tawi Flood Recovery Project (World Bank)
KLD Kilolitres a day
LAWDA Lakes and Waterways Development Authority (now LCMA)
LCMA Lake Conservation and Management Authority (formerly LAWDA)
LDMA Ladakh Disaster Management Authority (Supplement S01)
LG Lieutenant Governor
LPCC Ladakh Pollution Control Committee (Supplement S01)
MLD Million litres a day
MoEF&CC Ministry of Environment, Forest and Climate Change
MoES Ministry of Earth Sciences
MoHUA Ministry of Housing and Urban Affairs
NAQUIM National Aquifer Mapping (CGWB)
NCMRWF National Centre for Medium Range Weather Forecasting
NDMA National Disaster Management Authority
NGT National Green Tribunal
NHAI National Highways Authority of India
NHIDCL National Highways and Infrastructure Development Corporation Limited (Supplement S01)
NHPC NHPC Limited (operator of the Salal and Dul Hasti dams)
NIH National Institute of Hydrology, Roorkee
NOC No-objection certificate
OA Original application (before the NGT)
OBPS Online Building Permission System
PHE Public Health Engineering, a wing of the Jal Shakti Department
PIL Public interest litigation
PMDP Prime Minister's Development Package
PSD Permissible site discharge
R&B Public Works (Roads and Buildings) Department
RRV Required retention volume
RTP Registered Technical Person (UBBL-2021)
RWH Rainwater harvesting
S.O. / SRO Statutory order / statutory rules and orders (notifications in the Gazette)
SANDRP South Asia Network on Dams, Rivers and People
SAPCC State Action Plan on Climate Change
SDA Srinagar Development Authority
SLA Sea-level allowance (coastal term; not applicable in Jammu and Kashmir)
SMC Srinagar Municipal Corporation
SMP Srinagar Master Plan 2035
SoI Survey of India
SPV Special purpose vehicle (a Smart City company)
SRRG Self-recording rain gauge
STP Sewage treatment plant
SUH Synthetic unit hydrograph (CWC)
SW monsoon / JJAS South-west monsoon, June–September
SWD Storm water drain
TPO Town Planning Organisation (Kashmir; Jammu), of H&UDD
UBBL-2021 The Jammu and Kashmir Unified Building Bye-Laws 2021, as amended
UEED Urban Environmental Engineering Department
ULB Urban local body (a Municipal Corporation, Municipal Council or Municipal Committee)
UTM Universal Transverse Mercator
WD Western disturbance
WQv Water quality volume
WRA The J&K Water Resources (Regulation and Management) Act, 2010
WSUD Water-sensitive urban design
WUCMA Wular Conservation and Management Authority