Chapter 6Minor and Major Drainage Systems
6.1 Purpose and scope
6.1.1 This chapter sets the level of service and the hydraulic criteria for the conveyance system that carries runoff from a development, a road or a public drainage scheme to a receiving waterway, tank or outfall. It covers:
- (a) the dual drainage concept: a minor system and a major system (Clause 6.3);
- (b) design return periods by land use and road class (Clause 6.4);
- (c) street hydraulics: spread, depth and flow hazard (Clause 6.5);
- (d) inlets, including clogging (Clause 6.6);
- (e) pipes and open and covered drains (Clause 6.7);
- (f) hydraulic grade line analysis (Clause 6.8);
- (g) overland flow paths, ponding at sags and building floor levels (Clauses 6.9 to 6.11);
- (h) culverts and road crossings (Clause 6.12); and
- (i) Jammu and Kashmir construction-practice requirements for covered drains, silt, solid waste, utilities and desilting access (Clause 6.13).
6.1.2 The detailed hydraulic design of individual structures (culverts, channels, energy dissipators, screens, pumps, gates, manholes) is in Chapter 9. Rainfall is in Chapter 2, runoff methods in Chapter 3, on-site storage in Chapter 4, tailwater in Chapter 5, waterbodies in Chapter 7 and water quality in Chapter 8.
6.1.3 This chapter applies to all public drains, all roads with kerbs or roadside drains, and all private drainage systems in developments that meet the applicability thresholds of Chapter 1. In Tier B local bodies, the simplified procedures and design aids referred to in Chapter 1 may be used for elements serving ≤ 16 ha, but the criteria of this chapter still apply.
6.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Minor system | Inlets, pipes, covered drains and open drains that carry runoff up to the minor design AEP of Table 6.1 without surcharge above the limits of Clause 6.8. |
| Major system | The surface flow paths (streets, overland flow paths, open channels, floodways and storage) that carry flow above the capacity of the minor system, up to the 1% AEP (100-yr) event. |
| Overland flow path | A defined surface route, in public land or a recorded easement, that carries major-system flow to a receiving waterway. |
| Spread (T) | Width of flow in the gutter and carriageway, measured from the face of the kerb. |
| Sag | A low point on a road or flow path from which water can leave only through an inlet or by ponding to an overflow level. A trapped sag has no surface overflow route. |
| Clogging factor | The fraction of an inlet's clean hydraulic capacity assumed lost to debris (Clause 6.6.3). |
| Hydraulic grade line (HGL) | The line joining the free-surface levels in a conduit system, or the piezometric levels where the system is under pressure. |
| Covered drain | A rectangular drain, usually beside a road, closed by cast-in-situ or precast cover slabs that form a footpath. |
| Sediment allowance | The depth or area of a drain or pipe assumed filled with silt when its design capacity is computed (Clause 6.7.8). |
| Check event | An AEP rarer than the design AEP at which the combined minor and major system must still meet the limits of Table 6.2. |
| High-density area | An area notified as such by the approving authority under Clause 6.4.4. |
| Class I area | An urban local body with a population of 1 lakh or more (the CPHEEO definition). |
6.3 The dual drainage concept
6.3.1 Every drainage system shall be designed as two systems that work together:
- (a) a minor system that carries the minor design flow of Table 6.1 below ground or in drains, keeping streets usable and spread within Table 6.2; and
- (b) a major system that carries all flow above the minor-system capacity, up to the 1% AEP (100-yr) flow, on the surface without entering buildings and within the depth and hazard limits of Clause 6.5.
6.3.2 Every element has a 1% path. Every inlet, sag, pipe, drain, culvert and storage element shall have an identified 1% AEP overland flow path to a receiving waterway, tank or outfall. The path shall be shown on the drainage plan (Clause 6.15).
6.3.3 Major-system design flow. The major system at any point shall carry the 1% AEP peak flow less the minor-system capacity at that point. The minor-system capacity used in this subtraction is the capacity of the inlets after the clogging factors of Clause 6.6.3, or the pipe capacity, whichever is less. At sags and at any location used to set building floor levels, the major system shall also be checked with the minor system fully blocked (Clause 6.10.3).
6.3.4 Rainfall and method. Design flows shall use the rainfall of Chapter 2 (including the climate factor of Clause 2.8) and the methods of Chapter 3:
- (a) the Rational Method only for catchments ≤ 16 ha and a single conveyance element. It shall not be used to accumulate flows down a network whose total catchment exceeds 16 ha;
- (b) a hydrograph method with hydraulic routing (for example SWMM, HEC-HMS with a hydraulic model, or an equivalent 1D/2D model) for networks above 16 ha and for any network with storage, pumping or a tidal outfall;
- (c) a minimum time of concentration of 10 minutes.
6.3.5 No transfer between catchments. Neither the minor nor the major system shall divert flow from one natural catchment to another unless the approving authority accepts a catchment-wide study showing no adverse effect.
6.3.6 Hill catchments: debris, sediment, steep drains and streets, hill roads and sloping sites. This clause applies to every element of the minor and major systems that receives runoff from a hill catchment, which in this Manual means land in sub-area JK-B, JK-B1 or JK-D of Annex 2A, the slopes of sub-areas JK-A and JK-C (among them the Siwalik hills above the Kandi belt, the Karewa scarps and the Zabarwan hills above Srinagar), any catchment whose natural ground slopes more than 10% on average, and any khad, nallah or other seasonal stream that comes down from the hills or runs across the Kandi fans of Jammu, Samba and Kathua. Such elements shall meet Clauses 6.4 to 6.14 and, in addition (all set by this Manual):
- (a) Debris racks and traps. Every inlet, drain or pipe entrance and culvert that receives flow from 1 ha or more of unbuilt hill land (forest, scrub, orchard, terraced or bare slope, or a slide scar), or from a khad or nallah whatever its catchment, shall have a debris rack or a debris trap upstream of it, designed under Chapter 9 (Clause 9.8), with machine access and a stable place to stockpile what it catches, which shall not be a slope, a khad, a nallah or a wetland. With 50% of the rack blocked, the element it protects shall still pass its design flow, and the overflow route shall not send the flow onto a building or an unprotected slope. Racks and traps shall be cleared by 31 May and, in the hill towns of sub-areas JK-B, JK-B1 and JK-D, again after the monsoon by 31 October (Chapter 10). The volume of a debris basin is to be set in Chapter 9 [TBC].
- (b) Bulking factor. The design flow of every channel, drain, pipe, culvert and crossing that receives flow from a hill catchment shall be the clear-water peak flow of Chapter 3 multiplied by a bulking factor of 1.25, for the minor design flow, the check event and the 1% AEP flow; elsewhere the factor is 1.0. The factor applies to capacity, freeboard and velocity; it does not apply to the runoff volume used for storage (Chapter 4). A larger factor shall be used where a sediment study of the catchment gives one. A catchment that the screening of Clause 2.3.6(i) shows to be prone to debris flow, or that drains a mapped debris-flow fan, landslide, slide scar or subsidence zone, is not designed by a bulking factor: no building, outfall, pumping station or storage shall be placed in the debris-flow path, and the drains are designed for the bulked flow only [TBC].
- (c) Blockage. The blockage check of Clause 6.12.4 shall assume 50% of the inlet area blocked for every culvert and pipe entrance with a span or diameter below 3.0 m, and 20% for larger ones, whether or not a debris rack is provided. Grate inlets keep the clogging factor of Table 6.5, and kerb openings on grade take the sag value of 20%.
- (d) Sediment and minimum velocity. Drains and pipes that receive flow from a hill catchment, or that run across the Kandi fans of Jammu, Nagrota, Samba and Kathua–Hiranagar, shall reach a velocity of at least 1.0 m/s at the minor design flow, in place of the minimum of Clause 6.7.3(a). Where the gradient does not allow it, a sediment trap shall be provided upstream and the sediment allowance of Clause 6.7.8 doubled (Clause 6.7.4).
- (e) Steep drains and energy dissipation. Where the gradient of a drain gives a velocity above the limits of Clause 6.7.3(b), or a Froude number above 0.8, at the design flow, the drain shall be a lined chute, a stepped channel or a series of drop structures designed under Chapter 9 for the bulked flow of item (b), with the freeboard of Table 6.7 for steep channels and an energy dissipator at every change to a flatter gradient and at the outlet. No unlined drain shall be laid on a gradient on which the velocity exceeds the limit of Chapter 9 for its bed material.
- (f) Steep streets. On a street steeper than 5%, grate-only inlets shall not be used, and inlets shall be placed by the calculation of Clause 6.6.4 with the bypass flows of a steep gutter. On a street steeper than 10%, the flow shall be intercepted by transverse grated channels or kerb inlets at a spacing that keeps the street flow within the limits of Table 6.3 in the check and 1% AEP events. Where the 1% AEP flow cannot be kept within those limits on the carriageway, the excess shall be carried in a lined side channel or stepped drain under item (e), and the street, unless it is a notified evacuation route, is treated as closed in that event. Steps and footpaths that carry flow shall have a lined side channel.
- (g) Hill roads as the minor system. In sub-areas JK-B, JK-B1 and JK-D, and on any road elsewhere that crosses a hill catchment, the drainage of a road is the minor system for the land above it as well as for the road. Every road and street there shall have, as works of the road's owner, the Public Works (R&B) Department, NHAI or the local body:
- (i) a lined catch-water drain above every cut slope where the land above drains towards the road, discharging to a natural channel or a cross-drainage work and not over the cut;
- (ii) lined side drains on the hill side (IRC:SP:42-2014, cl. 8.5.1);
- (iii) a cross-drainage work at every khad and nallah, and culverts or scuppers at intervals such that no side drain exceeds its capacity at the design AEP of Table 6.1 with the factors of items (b) and (c);
- (iv) at the outlet of every scupper, culvert and side drain on the valley side, a lined chute, cascade or pipe carrying the flow to a stable natural channel, with an energy dissipator, so that road runoff is never discharged onto an unprotected slope, fill, retaining wall or the land of a building below;
- (v) culverts of at least the size of Clause 6.12.5, designed under Clause 6.12 and not less than IRC:SP:42-2014 cl. 7.1.4 requires for the road; where the drainage provisions of IRC:SP:48, the Hill Road Manual, which were not read for this Manual [TBC], are stricter than this item, they apply;
- (vi) no muck, spoil or excavated material from the construction, widening or maintenance of the road, or from a tunnel or a hydropower work, placed in or beside a khad, nallah, khul or other line of natural drainage, or on a slope from which a storm can carry it into one, and every natural drain or stream that such material has blocked cleared before the monsoon so that the runoff of its catchment reaches the nearest river, khad or nallah; and
- (vii) no sewage pipe, and no outlet of a septic tank or soak pit, connected to a road drain or discharged onto the slope below the road (Clause 8.9).
- (h) Sloping sites and moving ground. On a site where the land above drains towards a building, its cut or its retaining wall, the runoff of that land shall be intercepted above them by a lined diversion drain sized for the minor design flow of Table 6.1 from the land above it, with the factors of items (b) and (c), with a 1% AEP flow path that does not pass through or against the building. The space between a building and its cut or toe wall shall be paved or lined and drained so that water does not stand against the building or soak into the foot of the cut. Both shall discharge to a public drain or a stable natural channel as item (g)(iv) requires, not onto the slope below. In a mapped subsidence or sliding zone, among them Thathri Nai Basti in Doda district, Pernote and Duksar in Ramban district and any area of Budgam district that JKPCC lists as prone to land sinking, every drain shall be lined, the surface runoff shall be diverted away from the moving part of the slope, and no runoff shall be put into the ground (Clause 4.11). Roof and paved-area runoff on a sloping site follows the hill infiltration rule of Clause 4.11. The site plan of UBBL-2021, cl. 2.6(b)(xi), which already shows contours at 0.3 m intervals where the site slopes more than 1:20, shall also show the diversion drain, the drained space and the point of discharge.
Commentary. The CPHEEO (2019) manual defines major and minor systems in its glossary but gives no return period for the major system. APWA 5600 (2006, 5601.8) requires the system to convey the 1% peak and, where in-system capacity is less, an overflow system to carry the remainder. Clause 6.3.3 subtracts only the clogged inlet capacity, not the full pipe capacity, because in practice the pipes cannot take more water than the inlets admit. The fully-blocked check at sags has no direct precedent; this Manual sets it because of the Srinagar and Jammu experience that drains under footpaths are often silted or blocked by solid waste when the heaviest rain arrives (CPHEEO 2019 Part A, Ch 1 and 2, Figures 1.2 and 2.1 on solid waste dumping in drains). The prohibition on inter-catchment transfer follows the DID Malaysia 2008 submission checklist, which prohibits inter-catchment diversion. Clause 6.3.6 is set by this Manual for Jammu and Kashmir, as for Uttarakhand and Himachal Pradesh before it in this series, because the criteria of this chapter assume clear water on gentle ground. In the hills of Jammu and Kashmir the water is not clear and the ground is not gentle. The Jammu Master Plan 2032 describes the ravines of the Kandi belt, "locally called Khads", as "transformed into gushing torrents" (§2.4) and counts "more than 100 small and big dry khads which have flash floods during the rainy season" (§7.3.2). In August 2025 the Chenab, the Tawi and their tributaries set new highest flood levels, and SANDRP found that "muck dumping worsens the impacts" (as reported), which is item (g)(vi). At Pernote in Ramban district the Geological Survey of India found in April 2024 that "during rains the ingress of surface runoff through these cracks may have developed the pore pressure, thus inducing the instability in the slope", and recommended "diverting the surface runoff away from the affected/active part of the slope" and that "Drains present in the affected slope should be lined/trained" (GSI note annexed to the JKPCC compliance report in NGT O.A. 642/2024); at Thathri Nai Basti in Doda district, where houses cracked from February 2023, the committee appointed by the National Green Tribunal found "no retaining wall with weep holes, or planned drainage or sewage disposal structures" and "unplanned PVC pipes for the purpose of sewerage disposal to the road side drainage downslope" (as reported). Items (g)(iv), (g)(vii) and (h) answer both: water discharged onto a slope raises its pore pressure (Chapter 4, Clause 4.11). The cloudbursts at Chasoti in Kishtwar district on 14 August 2025, which killed more than 60 people, and at Jodh Ghati in Kathua district on 16–17 August 2025, and the landslide on the Vaishno Devi route on 26 August 2025 (all as reported), were measured by no rain gauge, and no gauge in the Union Territory has recorded the cloudburst rate of 100 mm in an hour in any primary source found (Chapter 2); they were debris flows and slides, which item (b) keeps buildings and outfalls away from rather than sizing a drain for. IRC:SP:42-2014 (cl. 8.5.1) already treats hill roads differently: their side drains are "normally restricted to 60 cm" in width and lined because "rolling stones cause high friction", "culverts are required at closer intervals compared to those in plain areas", and "stepped chutes/baffles are to be provided where the longitudinal bed slope exceeds critical". No Indian guidance on bulking factors, debris racks or debris basins was found during research, and no numeric debris or bulking allowance in any Jammu and Kashmir document [TBC], so each number in Clause 6.3.6 is an interim value with a stated reason, the same as in the Uttarakhand and Himachal Pradesh editions. The 1 ha trigger for a debris rack reflects the time of concentration on hill slopes, a few minutes, so that even a small unbuilt slope delivers stones, gravel and leaves to an inlet in the first burst of a storm. The bulking factor of 1.25 is the factor for a flow that carries a fifth of its volume as sediment (bulking factor = 1 / (1 − sediment fraction by volume)): about the most that a drain can carry and still behave as a water flood. A flow with more sediment than that behaves as a debris flow, which no drain can be sized for, and the factor is to be replaced by a sediment study as soon as one is made [TBC]. The 3.0 m limit in item (c) doubles the core's 1.5 m because boulders and timber block openings that leaves and plastic do not. The 1.0 m/s minimum in item (d) replaces the 0.6 m/s of CPHEEO, which is based on carrying fine sand of 0.09 mm, because hill drains and the khads of the Kandi carry gravel and boulders. On a 10% street, the hazard limit of 2.0 m/s is reached when sheet flow on a concrete surface is only about 30 mm deep, which is why item (f) takes the flow off steep carriageways. The Kashmir valley floor is not a hill catchment and the clause does not apply there, except on the Karewa scarps and the slopes above the valley towns, where an outlet that discharges down a scarp without protection cuts a gully into it (Clause 4.11).
6.4 Design return periods
6.4.1 The minor system, roads and crossings shall be designed for the AEPs of Table 6.1. Where both a land-use row and a road-class row apply to an element, the rarer AEP (longer return period) governs.
Table 6.1 — Design AEPs for conveyance (matches Clause 2.4)
| Element | Design AEP (return period) | Check event | Basis |
|---|---|---|---|
| Minor system: Srinagar, Jammu, Anantnag, Baramulla and Udhampur core and other high-density areas | 10% (10-yr) | 1% (100-yr) overland path | This Manual (see Commentary) |
| Minor system: other Class I areas | 20% (5-yr) | 1% overland path | This Manual; CPHEEO Table 4.1 |
| Minor system: other areas | 50% (2-yr) | 1% overland path | This Manual; CPHEEO Table 4.1 |
| Arterial road drainage and crossings | 2% (50-yr) for arterials that are notified evacuation or emergency routes; 4% (25-yr) for other arterials | Next higher AEP: 1% for a 2% design; 2% for a 4% design | This Manual (25–50-yr); split set by this Manual |
| Collector road drainage and crossings | 4% (25-yr) | 2% (50-yr) | This Manual |
| Local road drainage and crossings | 10% (10-yr) | 4% (25-yr) | This Manual |
| Road underpasses and other trapped sags on public roads | 2% (50-yr) | 1% (100-yr) | This Manual (Clause 6.10.5) |
| Airports, railway stations, power stations and other critical infrastructure | 1% (100-yr) in Class I areas; 2% (50-yr) elsewhere | — | CPHEEO 2019 Table 4.1 |
| Major (overland) system, every element | 1% (100-yr) | — | This Manual |
| Building floor levels | 1% level + 0.5 m freeboard | — | This Manual (Clause 6.11) |
6.4.2 Check events. At the check event of Table 6.1, the combined minor and major system shall carry the check-event flow within the 1% AEP limits of Table 6.2 and without water entering any building. The 1% overland path requirement of Clause 6.3.2 applies in addition to the check event.
6.4.3 Higher standards. An approving authority may adopt a rarer AEP for any element, including through the high-powered committee route in Note 2 of CPHEEO Table 4.1. It shall not adopt a more frequent AEP than Table 6.1.
6.4.4 High-density areas. The approving authority shall notify, by map, the high-density areas to which the 10% AEP minor-system standard applies. Until it does, the 10% AEP standard applies to:
- (a) the city centre of Srinagar, among them Lal Chowk, Budshah Chowk, Residence Road, M A Road and the Exhibition Grounds, waterlogged after 26.4 mm on 1 August 2019 (as reported), and the old city along the Jhelum; the old city of Jammu and the localities of Jammu reported waterlogged in 2025 and 2026, among them Gangyal, Trikuta Nagar, Nanak Nagar, Rajinder Nagar, Muthi, Lakhdata Bazar and Bantalab (as reported, and as listed by JMC in August 2026 [TBC]); and the old towns of Anantnag, Baramulla and Sopore: the older, densely built area within the Municipal Corporation's, Municipal Council's or Municipal Committee's area that the applicable master plan or zonal plan under the Jammu and Kashmir Development Act 1970 identifies as the core area, old city or central business district, with the boundary of each to be confirmed by the local body with SDA, JDA or the Town Planning Organisation concerned [TBC];
- (b) in every other Municipal Council and Municipal Committee, the area that the applicable plan identifies as the core area, old town or central business district, the main bazaar of a hill town, and the old village settlements that have been taken into the built-up area; and
- (c) any area in a Tier A body where the master plan permits a floor space index above the base value for the zone.
6.4.5 Retrofit. Where an existing drain cannot practicably be enlarged to the Table 6.1 AEP, the shortfall shall be made good by upstream storage (Chapter 4), regional storage (Chapter 7) or an improved major-system path. The approving authority shall record the residual level of service.
Commentary. The values in Table 6.1 match the Clause 2.4 summary and add rows for underpasses and critical infrastructure. They exceed the CPHEEO (2019) national advisory minimums of 5-yr for Class I cities and 2-yr elsewhere (CPHEEO Part A, Table 4.1). Note 2 of that table allows a State committee to adopt higher values. The 10-yr tier for high-density areas follows Gupta (IIT Bombay), who recommends "1 in 10 year for residential-high density", and Malaysia's MSMA 2, which uses 10-yr minor and 100-yr major systems for link houses, apartments, commercial and industrial land. The road values resolve a conflict in Indian codes. IRC:SP:50-2013 recommends 1–2 years for urban road drains. IRC:SP:42-2014 suggests 25 years for urban roadside drains and a check flood at the next higher return period. APWA 5600 (2006) uses 50-yr for arterial, 25-yr for collector and 10-yr for residential street crossings. Table 6.1 adopts the APWA tiers and the IRC:SP:42 check-flood concept. Splitting arterials into 50-yr evacuation routes and 25-yr others has no direct precedent and is set by this Manual. The 50-yr standard for underpasses is likewise set by this Manual, because an underpass is a trapped sag where the failure mode is deep water on a live carriageway. The default high-density areas in Clause 6.4.4 are set by this Manual and apply until the approving authority notifies a map.
6.5 Street hydraulics: spread, depth and flow hazard
6.5.1 Gutter flow. Flow in a triangular kerb-and-gutter section shall be computed with the modified Manning (Izzard) equation:
Q = (Ku / n) · Sx^(5/3) · SL^(1/2) · T^(8/3)
where Q is the gutter flow (m³/s), Ku = 0.376 (SI), n is the Manning roughness of the gutter (Table 6.6), Sx is the cross slope (m/m), SL is the longitudinal slope (m/m) and T is the spread (m). Composite and depressed gutter sections shall be analysed by the methods of FHWA HEC-22 (4th edition, 2024).
6.5.2 Spread and depth limits. Street flow shall not exceed the limits of Table 6.2.
Table 6.2 — Street flow limits
| Road class | Minor design event (Table 6.1) | Check event and 1% AEP event |
|---|---|---|
| Arterial | Spread shall leave at least one through lane in each direction clear of water. No flow across the crown. | Depth ≤ 150 mm at the crown and ≤ 350 mm at the deepest point; hazard limits of Clause 6.5.3 |
| Collector | Spread T ≤ 3 m. No flow across the crown except at a sag intersection. | As above |
| Local | Spread T ≤ 3 m. Flow shall not overtop the kerb. | As above |
| All classes, at intersections | Cross-flow over the crown ≤ 0.03 m³/s at sag intersections and superelevation transitions; none at mid-block sags. | As above |
6.5.3 Flow hazard limits. In the check event and the 1% AEP event, the product of depth (D, m) and velocity (V, m/s) of street and overland flow shall not exceed the limits of Table 6.3.
Table 6.3 — Flow hazard limits for streets and overland flow paths
| Location | Required hazard class (Table 6.4) | Limits |
|---|---|---|
| Carriageways of all roads | H2 or better | D·V ≤ 0.6 m²/s; D ≤ 0.35 m (Table 6.2); V ≤ 2.0 m/s |
| Footpaths, pedestrian crossings, school, hospital and transit-stop frontages | H1 | D·V ≤ 0.3 m²/s; D ≤ 0.3 m; V ≤ 2.0 m/s |
| Notified evacuation and emergency routes | H1 | D·V ≤ 0.3 m²/s; D ≤ 0.3 m; V ≤ 2.0 m/s |
| Overland flow paths in public open space or easements, away from roads | H3 or better, with warning signs | D·V ≤ 0.6 m²/s; D ≤ 1.2 m; V ≤ 2.0 m/s |
Table 6.4 — Combined flood hazard vulnerability classes (reproduced for reference)
| Class | Description | D·V limit (m²/s) | Depth limit D (m) | Velocity limit V (m/s) |
|---|---|---|---|---|
| H1 | Generally safe for vehicles, people and buildings | ≤ 0.3 | 0.3 | 2.0 |
| H2 | Unsafe for small vehicles | ≤ 0.6 | 0.5 | 2.0 |
| H3 | Unsafe for vehicles, children and the elderly | ≤ 0.6 | 1.2 | 2.0 |
| H4 | Unsafe for vehicles and people | ≤ 1.0 | 2.0 | 2.0 |
| H5 | Unsafe for vehicles and people; buildings vulnerable to structural damage | ≤ 4.0 | 4.0 | 4.0 |
| H6 | Unsafe for vehicles and people; all buildings vulnerable to failure | > 4.0 | — | — |
Source: AIDR Guideline 7-3, Technical flood risk management guideline: Flood hazard (2014), Tables 1 and 2, modelled after Smith and Wasko (2012).
6.5.4 Depth and velocity for Clause 6.5.3 shall be taken from the gutter-flow calculation for simple sections, or from a 1D or 2D hydraulic model where flow leaves the kerb-and-gutter section.
Figure 6.1 — Minor and major drainage in a kerbed street. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 (2006, 5601.8) and FHWA, HEC-22 Urban Drainage Design Manual (4th ed., 2024).
Commentary. The Izzard form of Manning's equation with Ku = 0.376 is used both in FHWA HEC-22 and in the CPHEEO (2019) manual (Part A, Example 5.5, where the constant is written Kc = 0.376). The arterial spread rule (one lane clear) and the 3 m spread for local and collector streets are close to the APWA 5600 (2006, 5604.2) limit of 12 ft (3.66 m) from the back of kerb in each outside lane. The cross-flow limit of 0.03 m³/s is the SI equivalent of the APWA limit of 1.0 cfs at intersection sumps and superelevation transitions, with no cross-flow at mid-block sumps. The 150 mm and 350 mm depth limits are close to the APWA 5600 limits for 1% overflow at road crossings (7 in, about 180 mm, at the crown; 14 in, about 360 mm, at the deepest point). Mumbai's criterion of no flooding above 15 cm (IRC:SP:50-2013, §6.4.1) is a local precedent for the 150 mm crown value.
The hazard classes of Table 6.4 are the combined hazard curves published by the Australian Institute for Disaster Resilience (AIDR Guideline 7-3, 2014), which are modelled after Smith and Wasko (2012). Requiring H2 or better on carriageways means the 1% depth limit of 350 mm (Table 6.2) governs the depth, and the D·V product controls fast, shallow flow on steep streets. H2 is described as "unsafe for small vehicles". Two-wheelers are the dominant vehicles on Jammu and Kashmir streets, so the 1% event must be treated as a road-closure event on all roads except notified evacuation routes, which must meet H1. The assignment of hazard classes to locations in Table 6.3 has no direct precedent and is set by this Manual.
6.6 Inlets
6.6.1 Inlet types. Inlets may be kerb-opening inlets, grate inlets, combination inlets (a grate with a kerb opening) or slotted and trench drains. On public streets:
- (a) kerb-opening or combination inlets shall be used, unless the approving authority accepts grate-only inlets for a specific location;
- (b) inlet openings shall be set at road level, with a gutter depression where practicable, so that water is not held on the carriageway by a raised kerb or footpath;
- (c) grates in carriageways, cycle lanes and footpaths shall be of a bicycle- and pedestrian-safe pattern (Chapter 9, Clause 9.11).
6.6.2 Inlet capacity. The clean capacity of inlets on grade and in sags shall be computed by the methods of FHWA HEC-22 (4th edition, 2024), or from tested ratings published by the manufacturer for the exact grate and kerb-opening geometry. The empirical kerb-inlet equations of CPHEEO (2019) Part A §5.6.2 may be used as a cross-check only.
6.6.3 Clogging factors. The design capacity of every inlet shall be its clean capacity reduced by the clogging factors of Table 6.5:
Table 6.5 — Inlet clogging factors (share of clean capacity assumed lost)
| Inlet type | On grade | In a sag |
|---|---|---|
| Grate | 50% | 50% |
| Kerb opening | 10% | 20% |
| Combination | Apply the grate and kerb factors to each part separately | Apply the grate and kerb factors to each part separately |
Design capacity = (1 − clogging factor) × clean capacity.
6.6.4 Inlet spacing. Inlets shall be located by a sequential calculation that starts at the top of each gutter run. At each inlet, the intercepted flow is computed, and the bypass flow is added to the gutter flow arriving at the next inlet. Spacing shall be such that the spread limits of Table 6.2 are met everywhere in the minor design event. In addition:
- (a) inlet spacing shall not exceed 30 m on kerbed roads, whatever the calculation gives;
- (b) inlets shall be provided at every sag, immediately upstream of pedestrian crossings and intersections, upstream of bridge decks and superelevation transitions, and at the end of every gutter run;
- (c) bypass flow from the last inlet of a run shall not be passed onto a road of a higher class or into private land.
6.6.5 Sag inlets. At a sag on a kerbed road:
- (a) the sag inlet's design capacity (after clogging) shall be not less than the total minor design flow arriving at the sag;
- (b) flanking inlets shall be placed on each side of a sag on any road where ponding could spread beyond the Table 6.2 limits, and at every underpass;
- (c) the ponding at the sag shall comply with Clause 6.10.
6.6.6 Inlet connections. The pipe connecting an inlet to the main drain shall have a diameter of at least 300 mm and shall be laid at a gradient that gives at least 0.9 m/s at the inlet's design flow.
6.6.7 Silt sumps. Every inlet chamber on a public road shall have a silt sump at least 300 mm deep below the invert of its outlet pipe, accessible for cleaning from the surface.
Figure 6.2 — Gutter spread, inlet interception and clogging. Original drawing for this Manual, adapted from FHWA, HEC-22 Urban Drainage Design Manual (3rd ed., 2009; 4th ed., 2024) and CPHEEO, Manual on Storm Water Drainage Systems (2019).
Commentary. The clogging factors are more severe than the APWA 5600 (2006, 5604.2) rating of sump inlets at 80% of theoretical capacity (a 20% reduction), because grates in Jammu and Kashmir streets are routinely blinded by plastic and leaves. CPHEEO (2019) Part A shows solid waste dumped in drains as a primary cause of drain failure (Figures 1.2 and 2.1). APWA 5600 (2006) allows only kerb-opening inlets on public streets; Clause 6.6.1(a) is less strict because combination inlets are useful on flat roads. No standard inlet, kerb-channel or covered-drain detail of the Public Works (R&B) Department, SMC or JMC was found during research [TBC]; the bye-laws require only that "the Underground utilities" of a street, among them "storm water drainage", be "as per section proposed in the annexure" (UBBL-2021), and in Jammu the roadside drains are the storm drains (Jammu Master Plan 2032, §5.1.3). The 30 m maximum spacing and the treatment of combination inlets in Table 6.5 have no direct precedent and are set by this Manual. Roads on the Kashmir valley floor, in the Jammu plains and across the Sirowal are flat, which shortens the calculated spacing anyway; on the steep streets of the hill towns gutter flow runs fast and passes inlets by, which Clause 6.3.6(f) deals with. A fixed cap stops a single blocked inlet from leaving a long dry gutter run. The 300 mm silt sump is set by this Manual. It matches the 0.3 m sump shown on the CPHEEO catch-basin detail (CPHEEO 2019, Figure 5.9).
6.7 Pipes and open and covered drains
6.7.1 Uniform flow. Pipe and drain capacity shall be computed with Manning's equation:
V = (1/n) · R^(2/3) · S^(1/2); Q = A · V
where V is the mean velocity (m/s), n is the Manning roughness (Table 6.6), R is the hydraulic radius (m), S is the friction slope (m/m), A is the flow area (m²) and Q is the discharge (m³/s). Where backwater from a tailwater, a junction or a structure affects the water level, a gradually varied flow (standard step) or hydraulic network model shall be used, and the HGL requirements of Clause 6.8 apply.
6.7.2 Manning roughness. Design values of n shall be taken from Table 6.6. For concrete pipes and masonry or concrete drains, the design value shall be not less than the "fair" or "rough" condition value listed, to allow for sediment, biofilm and ageing.
Table 6.6 — Manning's n for design (from CPHEEO 2019)
| Material | Condition | n (CPHEEO) | Minimum design n in this Manual |
|---|---|---|---|
| Cement concrete pipe (collar joints) | Good / fair | 0.013 / 0.015 | 0.015 |
| Spun concrete pipe (RCC, PSC) with S/S joints | Manufacturer's design value | 0.011 | 0.013 |
| HDPE / uPVC pipe | — | 0.010 | 0.011 |
| Plastic (smooth), asbestos cement | — | 0.011 | 0.011 |
| Concrete drain, steel trowelled / wood trowelled | — | 0.014 / 0.015 | 0.015 |
| Sand and cement plaster | — | 0.015 | 0.015 |
| Brick masonry | Good / rough | 0.015 / 0.017 | 0.017 |
| Masonry | Bad condition | 0.020 | 0.020 |
| Rubble set in cement | — | 0.017 | 0.017 |
| Earth channel | Regular, good / ordinary | 0.020 / 0.025 | 0.025 |
| Earth channel | With stones and weeds / poor | 0.030 / 0.035 | 0.035 |
| Earth channel | Partly obstructed by debris or weeds | 0.050 | 0.050 |
| Gutter: concrete | — | 0.013 | 0.013 |
| Gutter: hot-mix asphalt | — | 0.015 | 0.015 |
| Gutter: sprayed seal | — | 0.018 | 0.018 |
Source of the CPHEEO column: CPHEEO (2019) Part A, Table 5.1 (itself from the CPHEEO Manual on Sewerage and Sewage Treatment Systems, 2013) and Table 5.8 (gutters).
6.7.3 Velocity limits. At the minor design flow:
- (a) minimum (self-cleansing) velocity: 0.6 m/s in open and covered drains and 0.9 m/s in pipes;
- (b) maximum velocity: 3.0 m/s in lined drains and in pipes, unless the drain or pipe is designed as a chute under Chapter 9. CPHEEO permits up to 6.0 m/s in plastic or plastic-lined pipes in hilly regions; this may be used in Udhampur, Katra, Reasi, Ramban, Batote, Banihal, Doda, Bhaderwah, Kishtwar, Rajouri, Poonch, Gulmarg and Pahalgam and other hill towns with the approving authority's agreement;
- (c) maximum velocity in unlined and vegetated channels: Chapter 9, Table 9.2;
- (d) the Froude number of flow in open and covered drains shall not exceed 0.8 at the design flow, unless the drain is designed for supercritical flow under Chapter 9.
6.7.4 Gradient. Each pipe and drain shall be laid at a gradient that achieves Clause 6.7.3(a). Where flat terrain or a fixed outfall level makes this impossible, the designer shall:
- (a) report the velocity achieved;
- (b) double the sediment allowance of Clause 6.7.8; and
- (c) provide access for mechanical desilting at the spacing of Clause 6.13.2.
6.7.5 Pipe flow condition. Pipes shall be sized so that the minor design flow does not exceed the pipe-full capacity. The greater discharge that a circular pipe carries at about 0.95 of its depth shall not be relied on.
6.7.6 Minimum sizes.
- (a) Pipes: 300 mm internal diameter; 450 mm for public mains.
- (b) Open drains: bed width 0.3 m.
- (c) Covered public drains (drains closed by cover slabs): clear internal width 0.6 m and clear internal depth 0.6 m.
6.7.7 Cover to pipes. Pipes shall have at least 0.6 m of cover to finished level, and at least 0.9 m under carriageways unless a structural design for the traffic load is submitted. Where the seasonal high groundwater table is within 1 m of the pipe crown, the pipe shall be checked for flotation with the pipe empty (CPHEEO 2019, Table 11.2) and anchored where necessary.
6.7.8 Sediment allowance. The design capacity of open drains, covered drains and pipes of 600 mm diameter or more shall be computed with the following depth of sediment at the invert:
- (a) open and covered drains: the greater of 75 mm and 10% of the clear internal depth;
- (b) pipes of 600 mm diameter or more: 5% of the internal diameter;
- (c) pipes below 600 mm: no allowance, but Clause 6.7.3(a) shall be met.
The Manning n for the reduced section shall be that of the drain material in Table 6.6.
6.7.9 Freeboard in open and covered drains. At the minor design flow, the water surface (computed with the sediment allowance) shall be below the top of the drain wall, or below the soffit of the cover slab in a covered drain, by at least the freeboard of Table 6.7.
Table 6.7 — Minimum freeboard in open and covered drains
| Drain | Minimum freeboard | Source |
|---|---|---|
| Bed width up to 300 mm | 100 mm | CPHEEO 2019 Table 5.3 (from IRC:SP:50-2013) |
| Bed width 300–900 mm | 150 mm | CPHEEO 2019 Table 5.3 |
| Bed width 900–1,500 mm | 300 mm | CPHEEO 2019 Table 5.3 |
| Wider drains and engineered channels, Q < 3 m³/s | 450 mm | CPHEEO 2019 Table 5.12 (from IS 7784 (Part 1): 1993) |
| Q 3 to < 30 m³/s | 600 mm | As above |
| Q 30 to < 300 m³/s | 900 mm | As above |
| Q 300 to < 3,000 m³/s | 1,200 mm | As above |
| Q ≥ 3,000 m³/s | 1,500 mm | As above |
| Any roadside drain | Not less than 150 mm | IRC:SP:42-2014 |
| Steep (supercritical) channels | Equal to the flow depth | CPHEEO 2019 §5.3.2 |
At bends, the freeboard shall be measured from the water level on the outside of the bend, including the superelevation Δy = V²T / (2 g rc), where T is the top width and rc the centreline radius (CPHEEO 2019, Eq. 5.29).
6.7.10 Bends and junctions.
- (a) The centreline radius of a bend in a drain shall be at least 3 times the drain width (CPHEEO 2019 §5.3.3). In engineered channels it shall be at least 2 times the top width and not less than 30 m (CPHEEO 2019 Table 5.11).
- (b) Where drains meet, a junction sump shall be provided with an internal width of at least twice the width of the outgoing drain. Incoming drains shall enter at less than a right angle to the outgoing flow, and the outgoing invert shall be below the sump floor so that water does not stand in the sump (CPHEEO 2019 §5.3.4).
6.7.11 Manholes and access chambers on pipes. Manholes shall be provided at every junction, change of size, alignment or gradient, and at the head of every pipe. Spacing on straight runs shall not exceed Table 6.8.
Table 6.8 — Maximum spacing of manholes on straight pipe runs
| Pipe diameter | Maximum spacing |
|---|---|
| 300–600 mm | 40 m |
| 700–1,000 mm | 100 m |
| 1,050–1,400 mm | 150 m |
| 1,500 mm and above | 300 m |
Source: CPHEEO 2019 Table 11.5. Manhole sizes, drops and covers: Chapter 9, Clause 9.12.
Figure 6.3 — Drain sections: freeboard, sediment allowance and access. Original drawing for this Manual, adapted from CPHEEO, Manual on Storm Water Drainage Systems (2019), Tables 5.3 and 5.12, and IRC:SP:50-2013.
Commentary. The n values are those of CPHEEO (2019) Table 5.1. The higher minimum design values have no direct precedent; this Manual sets them because CPHEEO notes that the 0.011 value for spun pipes "may be taken as given by the manufacturer". That is a clean-pipe value, and Jammu and Kashmir drains carry heavy silt and solid waste. The 0.6 m/s minimum velocity is CPHEEO's (Table 5.2), based on carrying 0.09 mm sand (§5.3.1). The 0.9 m/s value for pipes is stricter, because a silted pipe cannot be cleaned as easily as an open drain. The 3.0 m/s maximum is from CPHEEO Table 5.2 (WPCF/ASCE 1982). The Froude limit of 0.8 is from CPHEEO §5.3, which advises avoiding critical flow because the water surface becomes unstable.
The 0.6 m × 0.6 m minimum for covered drains has no direct precedent and is set by this Manual. A covered drain narrower than this cannot be desilted by hand or by small machines through a cover opening, and silted, inaccessible drains were a recurring finding after the waterlogging of Srinagar's city centre on 1 August 2019, when Lal Chowk, Budshah Chowk, Residence Road and M A Road were under water after 26.4 mm of rain (as reported), and in Jammu, whose old city floods "due to the poor condition of most of the nallahs" (Jammu Master Plan 2032, §5.1.3). The 0.6 m minimum cover is the value used in the CPHEEO (2019) worked pipe-design computation sheet (Part A, Chapter 5). The 0.9 m cover under carriageways is set by this Manual.
The sediment allowance values (75 mm or 10% for drains, 5% for large pipes) are set by this Manual. No Indian standard sets a sediment allowance for design. Srinagar and Jammu's experience is that drains run partly full of silt for much of the year, so a capacity computed for a clean section overstates the real capacity.
The CPHEEO freeboard table (Table 5.3) prints the first row as "Beyond 300 mm bed width". Read with the second row ("Beyond 300 mm & up to 900 mm"), the first row must mean "up to 300 mm"; Table 6.7 is written that way. The CPHEEO manhole spacing table (Table 11.5) gives overlapping ranges (700–1,050 mm and 1,000–1,400 mm); Table 6.8 removes the overlap by assigning 1,050 mm to the 150 m class.
6.8 Hydraulic grade line
6.8.1 HGL analysis. For every pipe and covered-drain network, the designer shall compute the HGL for the minor design event and for the check event, starting at the outfall and working upstream. The analysis shall include friction losses and losses at junctions, manholes, bends, inlets, outlets and gates.
6.8.2 Starting water level. The starting (tailwater) level at the outfall shall be the higher of:
- (a) the tailwater level of Chapter 5: mean high water springs (MHWS) plus the sea-level allowance of +0.3 m for minor-system design at tidal outfalls, and the level in the receiving drain, river or tank for the coincident event at other outfalls; and
- (b) the level computed at the outlet pipe from the critical depth and the pipe diameter, (dc + D)/2, where the receiving water is lower.
6.8.3 Minor-event limit. In the minor design event, the HGL shall be at least 0.3 m below the rim of every inlet and the cover level of every manhole and access chamber.
6.8.4 Check-event and 1% limit. In the check event and the 1% AEP event, the HGL may rise above the inlet rims. Water that leaves the minor system shall then be carried by the major system within the limits of Table 6.2 and shall not enter any building. Manholes that can surcharge above ground in these events shall have bolted or locked covers (Chapter 9, Clause 9.12).
6.8.5 Structure losses. Losses at manholes and junctions shall be computed by the energy-based access-hole method of FHWA HEC-22 (2009 or 2024 edition), or by an equivalent method in an approved hydraulic model. A simplified loss-coefficient method (h = K V²/2g) with coefficients from HEC-22 may be used for Tier B networks below 16 ha.
6.8.6 Invert and soffit levels. Where pipe size increases at a manhole, the soffits (crowns) of the incoming and outgoing pipes shall be matched, or the outgoing soffit set lower. The outgoing invert shall not be higher than the lowest incoming invert. Vertical drops in manholes shall follow Chapter 9, Clause 9.12.
6.8.7 Gates and valves. The head loss through flap gates and non-return valves in the open position shall be included in the HGL (Chapter 9, Clause 9.10).
6.8.8 Private connections. Building drainage that connects to a public drain whose 1% HGL is above the building's lowest drainage fitting shall have a non-return valve.
Commentary. The 0.3 m clearance between the minor-event HGL and the inlet rim is set by this Manual. It keeps a margin for losses that a model underestimates, and it stops water from bubbling out of inlets in the event the system is designed for. In Jammu and Kashmir many town drains end in the sump of a dewatering station behind the Jhelum's embankments, in a khad whose bed moves, in a river held high by a storm or a dam release, or in a lake whose outlet the river shuts (Clause 5.8.5). Srinagar's drains end at the drainage pumping and gravity stations along the Jhelum, the flood spill channel and the Dal (89 in the Srinagar Master Plan 2035 of 2019; 104 permanent dewatering stations in 2026, as reported), whose gates are shut once the river reaches its flood-declaration stage; Jammu's end in the khads of the Kandi and in the Tawi, which set a new highest level at Sidhra on 26 August 2025; and the drains of the Chenab valley towns end in the Chenab and its nallahs. No flood level of any khad or nallah, and no design level of any outfall, was found during research. A drain whose HGL is started from a free outfall, or computed one length at a time without the river, the sump or the lake level, fails in exactly that way. An HGL computed from the outfall, with the tidal tailwater of Chapter 5, exposes those errors at design stage. The MHWS plus 0.3 m starting level is from CPHEEO (2019) Table 6.2. The access-hole method is described in HEC-22 from the 2009 edition onward.
6.9 Major system: overland flow paths, easements and drainage reserves
6.9.1 Streets as the primary major system. Streets shall be graded so that the 1% AEP major-system flow is carried along the road reserve to a receiving waterway without being trapped, except at sags designed under Clause 6.10.
6.9.2 Overland flow paths outside streets. Where a major-system path leaves the road reserve, it shall be:
- (a) in public land, in the open space of a layout, or in an easement recorded on the layout approval and the title;
- (b) at least as wide as the 1% AEP flow top width plus 0.5 m on each side, and not less than 3.0 m;
- (c) kept free of buildings, compound walls, fences, fill, stored materials and planting that would obstruct flow;
- (d) graded to a continuous fall with no sag that lacks an outlet; and
- (e) within the hazard limits of Table 6.3.
6.9.3 Compound walls. A compound wall or fence shall not be built across a mapped overland flow path. Where a wall must cross one, it shall have openings with a total area that passes the 1% AEP flow with a 50% blockage, without raising the upstream water level above the limits of this chapter.
6.9.4 Access along open drains. Open drains with a top width of 2 m or more shall have a maintenance access strip at least 3.5 m wide along one bank, connected to a public road at intervals of not more than 500 m.
6.9.5 Supply channels, surplus courses and tanks. Tank supply channels and surplus courses are part of the major system and shall be protected under Chapter 7.
6.9.6 Drainage reserves. A drainage reserve is a strip of land, including the drain, kept free of buildings so that the drain can be maintained, widened and used as a flood path. A drainage reserve shall be provided:
- (a) along every public drain or channel with an internal width of 1.0 m or more that runs through or along a layout or site being developed or redeveloped;
- (b) along every drain or channel shown in an adopted Basin Stormwater Master Plan (Chapter 11), at the width of the future drain in that plan; and
- (c) along every new public drain with an internal width of 1.0 m or more built by a public body.
6.9.7 Width. The reserve shall be not less than the width in Table 6.9, measured from the drain's internal width W. The width is based on the required drain size (for a planned drain, the size in the master plan), not the existing size. Where the access strip of Clause 6.9.4 is wider than the margin in Table 6.9, the wider governs.
Table 6.9 — Minimum drainage reserve width (adopted from PUB Singapore)
| Internal width of drain, W | Open drain | Closed (covered) drain |
|---|---|---|
| 1.0 m to 1.2 m | 3.0 m | W + 0.6 m |
| more than 1.2 m to 3.0 m | W + 2.6 m | W + 1.6 m |
| more than 3.0 m to 4.5 m | W + 3.5 m | W + 1.6 m |
| more than 4.5 m to 6.0 m | W + 4.5 m | W + 3.0 m |
| more than 6.0 m to 9.0 m | W + 6.0 m | W + 3.0 m |
| more than 9.0 m to 25.0 m | W + 7.5 m | W + 3.0 m |
| more than 25.0 m | W + 12.0 m | W + 3.0 m |
For an open drain, the larger part of the margin shall be on the side used for maintenance access.
6.9.8 Use and protection.
- (a) The reserve shall be shown as a separate plot on the layout or site plan and transferred to the Approving Authority free of cost, as roads and open space reservations are. Where the drain is an I&FC channel, the reserve is transferred to I&FC.
- (b) No building, compound wall, fence, ramp, step, fill or other structure shall be built in the reserve. Compound walls and boundary fences shall stand outside it.
- (c) The access strip in the reserve shall be level and continuous, and connected to a public road. Bollards or posts and chains may be used at entrances to keep out vehicles other than maintenance vehicles.
- (d) Where the reserve is not fenced off, its edge shall be marked with concrete markers at not more than 50 m spacing.
- (e) Services shall cross under the drain, with at least 1.0 m clearance below the invert, or over it on an approved structure. Services shall not run along the reserve inside the drain section.
- (f) A structure within 2 m of the edge of the reserve shall be designed to remain stable when the drain is excavated to 1.0 m below its invert. The design shall be signed by a qualified structural engineer.
- (g) The reserve counts toward the site's open space requirements only where the Approving Authority's rules allow it; it does not reduce any setback required by Chapter 7.
Figure 6.4 — Drainage reserve along an open drain: reserve width from Table 6.9, no-structure zone, access strip on the maintenance side, the 1.0 m service clearance below the invert and the 2 m stability-check zone (Clauses 6.9.6 to 6.9.8). Original drawing for this Manual, adapted from PUB Singapore, Code of Practice on Surface Water Drainage (7th ed., with Addendum No. 3, 2025), clauses 5.1, 5.3, 9.6 and 9.7 and Appendix 1.
Commentary. Drainage reserves follow Singapore, where "the width of a drainage reserve is based on the required drain size" and the reserve is set aside as a separate plot, "kept free of all encumbrances" (PUB Code of Practice on Surface Water Drainage, 7th ed. with Addendum No. 3, 2025, cl. 1.1). Table 6.9 reproduces PUB's Appendix 1 widths. Clauses 6.9.8(b) to (f) follow PUB clauses 5.1 (no structure within a drain or drainage reserve), 5.3 and 5.3.1 (stability for excavation 1.0 m below the invert; engineer's calculations within 2 m of the reserve), 9.6 (level, continuous access, with bollards or posts and chains) and 9.7 (markers at a maximum of 50 m). The 1.0 m clearance for services crossing under a drain is from PUB's development-plan guidance. In Jammu and Kashmir, buildings and compound walls are often built up to the edge of a drain, so it cannot be widened or desilted by machine. Reserving the land when a plot is developed or redeveloped is the cheapest time to secure it, because widening later needs land acquisition. Basing the width on the master-plan drain size (6.9.6(b)) protects the land a future drain will need. Jammu and Kashmir has wide statutory distances from water, measured from three different lines, but no reserve width along a drain and no notified flood line. The Unified Building Bye-Laws bar development "from the edge of the bank of rivers" within 50 m of the Chenab, the Jhelum, the Tawi, the Ravi and the Ujh "or any other river/khad", within 30 m of Mansar, Surinsar, Wular, Nigeen, Manasbal "and other lakes", and within 20 m of unlisted rivulets, tributaries and minor canals such as the Ranbir and Sindh canals, "or as per building regulation whichever is more" (UBBL-2021 (as amended), cl. 7.12(b)); they leave talabs and village tanks to the distance "as may be prescribed" (cl. 7.12(c)); and they keep a green buffer along nallahs and rivers of "minimum 30 m from the highest water level or as provided in the master plan/zonal development plan or as provided under Water Regulatory Act, whichever is more" (cl. 5.2.5). The Srinagar Master Plan 2035 measures its buffers from the edge of the water: 50 m on the Telbal and Sind nallahs, 20 m on the Doodhganga, Nallah Amir Khan and the other feeder nallahs and channels, 200 m on the south, north and west sides of Anchar and 30 m on its east, 200 m on the south and west sides of Hokersar and 50 m on its east and north, 100 m at Nambal Narkur and 20 m at other small water bodies (Tables 8-2 and 8-3), and 100 m around unlisted wetland reserves (§8.2.3), with the buffers of the Dal, Nigeen and the lakes linked to them "subject to the outcome" of the public-interest litigation before the High Court. The Jammu Master Plan 2032 measures from the "Full Tank Level": 50 m on the Tawi, the Devak and the Basantar (30 m in built-up areas), 15 m on the Balol, Thather and Bhalwal khads, and 5 m on the other water bodies shown in the plan (§7.3.3); where the bye-laws apply, their 50 m from the edge of any khad and 30 m from the highest water level along nallahs override the plan's 15 m and 5 m, because each instrument applies "whichever is more". The High Court keeps 200 m free of construction around the Dal (PIL 159/2002, order of 19 July 2002, as quoted; a judgment of 30 October 2025 is reported to keep it, and was not read) and ordered the same around the Wular in November 2020 (as reported), and LAWDA, now LCMA, applied 200 m at Nigeen (order of 14 June 2021, as quoted). The Union Territory has two statutory routes to flood zoning and has used neither: the Jammu and Kashmir Flood Plain Zones (Regulation and Development) Act 2005 comes into force only on a date that the Government appoints by notification (s.1(3)), and no such notification was found; and Part VI of the Jammu and Kashmir Water Resources (Regulation and Management) Act 2010 provides for flood basins declared after survey, objections and notification, none of which was found [TBC]. The Srinagar Master Plan's proposal to notify the 25-year floodplain from Lelhar to Lasjan as a "Protected Natural Flood Absorption Basin" (§14.4.4.2) remains a proposal. Where a flood basin is notified under Part VI of the 2010 Act, or a flood plain zone under the 2005 Act, its restrictions govern; until then the mapped design flood line of Chapter 7 applies (set by this Manual). The 2010 Act puts the control of the bed and banks of all water sources, including "city channels and flood spill channels", under I&FC (s.81, by the section numbering of a title index, to be confirmed against an official copy [TBC]), and the High Court, which has called itself "Custodia Legis of river Jhelum and other water bodies", has directed that the original width of the Jhelum be restored (24 February 2015) and that "no construction of any kind is raised near the water bodies" (10 June 2016) (both as quoted in its order of 29 May 2024 in PIL 8/2017). In Jammu much of the drainage land is recorded in the revenue records as Gair Mumkin Khad (land recorded as uncultivable khad bed), which the Jammu Master Plan 2032 finds covers "more than thirty percent of the JDA land" and proposes to reduce to the "true Khad" identified with I&FC (§12.2.3). This Manual requires that no land recorded as Gair Mumkin Khad, nallah, nambal or waterbody be released for building until a hydraulic study of the functional khad or channel, for the 1% AEP flow with the bulking factor of Clause 6.3.6(b), has fixed its design flood line and the corridor of this clause, and I&FC has accepted it; the plan's own condition, "adequate buffer zones along all the drainage channels in accordance with the size, importance, and expected discharge", asks for the same (set by this Manual). For this Manual, as its own proposal and not as the meaning of the rules, the bank of a channel is its top of bank, and the edge of a lake, nambal, talab or reservoir is the higher of its full or maximum level and its monsoon water line (Chapter 7, definitions after Clause 7.2); each statutory distance is measured from its own line, and the widest result governs; every khad, nallah and khul that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whoever maintains it and whether or not it is lined, piped or covered; and land recorded in the revenue records as a river, khad, nallah, nambal or waterbody is part of the channel or waterbody whatever its present use (all set by this Manual). This Manual therefore gives the reserve a width, as its own proposal and not as a statutory width: a hydraulic corridor made up of the reserve of Table 6.9, based on the drain size needed to carry the design flow, with the bulking factor of Clause 6.3.6(b) where it applies (Clause 6.9.7), the access strip of Clause 6.9.4 on the access bank, and, along a river, khad, nallah or khul that drains 8 ha or more, the setbacks of Clause 7.4 measured from its top of bank, with a Zone 1 of at least 15 m. The corridor applies only where nothing wider binds: where the bye-laws, a master plan, a court or a notified flood basin sets a wider line, that line applies for as long as it binds (Chapter 7). It should be shown in the master plans and zonal plans made under the Jammu and Kashmir Development Act 1970 as non-developable land along drainage lines, and checked at building permission, where the site plan already has to show "any water body, flood affected areas" (UBBL-2021, cl. 2.6(b)(xi)) and the registered technical person already certifies that the site is clear of drains and water bodies (cl. 2.18), rather than made a new NOC.
The reserve matters because the drains of Jammu and Kashmir's towns are divided among owners, and no rule divides them. In Srinagar the Urban Environmental Engineering Department (UEED) plans, designs and builds the sewerage and drainage works of urban areas (Srinagar Master Plan 2035, §13.3), and the Town Drainage wings of SMC and of the Directorate of Urban Local Bodies Kashmir (DULBK) run drains in the city; the Srinagar Master Plan 2035 counts about 50 drainage schemes with 118,663 m of primary and secondary drains and 89 drainage pumping stations, 38 lift, 21 gravity and 30 lift-cum-gravity (February 2019), and H&UDD told the Legislative Assembly in February 2026 of a storm-water network of about 650 km with 104 permanent dewatering stations of about 2,300 cusecs and 281 mobile units (as reported): the counts are of different things on different dates and are not merged here. In Jammu the Sewerage and Drainage Division (West) of UEED works within the limits of JMC, while still holding some schemes outside them, and JMC cleans the city's nallahs and deep drains, 191 nallahs and 143 deep drains before the monsoon of 2020 (as reported); the roadside drains serve as the storm drains, and only 20% of the roads have side drains, covering about 40% of the city (Jammu Master Plan 2032, §5.1.3). I&FC holds the rivers, nallahs, khads, embankments, flood spill channels and city channels; the Public Works (R&B) Department and NHAI hold the roads and their drains, culverts and scuppers; LCMA manages the Dal and Nigeen, and WUCMA the Wular and its feeder channels; the Wildlife Department holds the wetland conservation reserves; SDA, JDA, the J&K Housing Board and the Smart City companies of Srinagar and Jammu build drains in their schemes; NHPC and JKSPDC hold the dams on the Chenab; and the Revenue Department keeps the records in which drainage land appears as Gair Mumkin Khad, nambal, rakh or kahcharai. No rule dividing the khads and natural nallahs from the municipal drains was found during research. For the purposes of this Manual, and until the Union Territory issues such a rule [TBC], the drains are assigned as follows: rivers, among them the Jhelum, the Tawi, the Chenab, the Ravi, the Ujh, the Basantar and the Devak, with their beds, banks, embankments and floodplains, the nallahs and khads, the flood spill channel and any supplementary channel, the city channels, among them the Tsunth Kol and the Padshahi Canal, and the canals and zamindari khuls, to I&FC, with the land as the Revenue Department records it, and with the municipal body desilting and clearing the nallahs and khads within its limits that it cleans now, under a written arrangement with I&FC [TBC]; Srinagar's drainage schemes, drains and dewatering stations to UEED for planning, design and construction, and to the Town Drainage wing of SMC or of DULBK that operates each of them for operation and maintenance, as the GIS drainage asset register of Clause 10.14.3 records [TBC]; the drains within the limits of JMC to JMC, and the schemes that the UEED Sewerage and Drainage Division (West) Jammu builds or holds to that division until they are handed over; the drains of every other town to its Municipal Council or Municipal Committee; drains built by SDA, JDA, the J&K Housing Board, a Smart City company or a colony developer to the body that built them until they are handed over in writing, and then to the local body; the road drains, catch-water drains, scuppers and cross-drainage of the roads of the Public Works (R&B) Department to that department, or to the local body that owns the road, and of national highways to NHAI; the Dal and Nigeen, with the drains that LCMA holds in its area, to LCMA, and the Wular and its feeder channels to WUCMA; the wetland conservation reserves, among them Hokersar, Shallabugh and Hygam, to the Wildlife Department, and the wetlands under the Wetlands (Conservation and Management) Rules 2017 to the J&K Wetland Authority; the reservoirs and their drawdown land to NHPC (Salal and Dul Hasti, and Pakal Dul through its joint-venture company), JKSPDC (Baglihar) and the operator of the Ranjit Sagar dam; sewers, interceptors and the interception of nallahs to UEED (Clause 8.9); and springs used for supply to the Jal Shakti Department (PHE) or to the local body that uses them (all set by this Manual). Under Clause 6.9.8(a), the reserve along a channel assigned to I&FC is transferred to I&FC. Where a channel's status is disputed, the corridor follows the channel and not its name or its revenue entry. No approved city drainage master plan with a design return period was found for any town in the Union Territory: the Drainage Master Plan and DPR for 767 km² of Srinagar (Egis India, 2023) publishes none (as reported), and the Jammu Master Plan 2032 leaves the storm-water DPR to be prepared "immediately after the approval" of the plan (§11.1.3). A drain sized to fit the land left beside it cannot be enlarged, which is why the reserve is based on the required size. Until a Basin Stormwater Master Plan is adopted (Clause 6.9.6(b)), the required drain size of Clause 6.9.7 is the size computed by the designer under this chapter. This Manual does not prescribe a lined or an unlined section, except where Clause 6.3.6(e) and Chapter 9 require lining on steep gradients. It requires the section to meet the velocity limits of Clause 6.7.3 and Chapter 9, and a reserve wide enough for an unlined or vegetated section is a reserve that keeps both options open.
Commentary. Requirements 6.9.2(b)–(e), 6.9.3 and 6.9.4 have no direct precedent and are set by this Manual. Compound walls around individual plots are almost universal in Jammu and Kashmir and are one of the most common ways that overland flow paths get blocked. The 50% blockage assumption for wall openings is set to match the grate clogging factor of Clause 6.6.3. The 3.5 m access width is set by this Manual, sized for a small excavator or desilting vehicle. For comparison, APWA 5600 (2006, 5608.4) requires a 15 ft (about 4.6 m) maintenance access strip for detention facilities.
6.10 Ponding at sags and low points
6.10.1 Minor event. At every sag, the minor design flow shall be removed by inlets (after clogging) with ponded spread within Table 6.2.
6.10.2 1% AEP event. At every sag:
- (a) the ponded depth shall not exceed 350 mm at the deepest point of the carriageway;
- (b) a surface overflow route shall be provided (for example over a lowered kerb and footpath into a designated overland flow path), so that the ponding level cannot rise above the overflow level; and
- (c) building floor levels around the sag shall comply with Clause 6.11.
6.10.3 Fully-blocked check. At sags, the 1% AEP ponding level shall also be computed with the minor system fully blocked and all flow leaving by the surface overflow route. Floor levels around the sag shall be set from the higher of the two ponding levels.
6.10.4 Trapped sags. Where a sag has no surface overflow route, the inlets and conduits (after clogging) shall carry the 1% AEP flow, and the approving authority shall agree the arrangement.
6.10.5 Road underpasses. Underpasses and other trapped sags on public roads shall:
- (a) be drained by a minor system (with pumping under Chapter 9, Clause 9.9, where gravity drainage is not possible) designed for the 2% AEP (50-yr) flow, checked at the 1% AEP flow;
- (b) have flanking inlets at both approaches to intercept flow before it reaches the low point;
- (c) be protected from inflow from surrounding streets by raised approach crests where practicable; and
- (d) have depth markers and automatic warning or closure signals that operate at 150 mm depth on the carriageway.
Commentary. The fully-blocked check, the trapped-sag rule and the underpass requirements have no direct precedent and are set by this Manual. No record of a flooded road underpass in the Union Territory was found during research [TBC]. The roads already act as the major system, and in the hills as its steepest part: in August 2025 four bridges in Jammu, among them the bridge at Bhagwati Nagar, were damaged (as reported), and at Pernote in Ramban district the slope failure of April 2024, which the Geological Survey of India attributed in part to the "ingress of surface runoff through these cracks", affected the Ramban–Gool road (GSI note annexed to the JKPCC compliance report in NGT O.A. 642/2024). Clause 6.10.5(d) links the 150 mm crown depth limit of Table 6.2 to the point at which traffic should stop.
6.11 Building floor levels
6.11.1 The lowest habitable floor, and every opening through which water could enter a building (doors, ventilators, basement ramps, lift pits and service entries), shall be at least 0.5 m above the 1% AEP flood level.
6.11.2 The 1% AEP flood level is the highest of:
- (a) the 1% AEP major-system water level in the street or overland flow path next to the building (Clauses 6.9 and 6.10, including the fully-blocked check at sags);
- (b) the 1% AEP flood level of any river, channel, tank or waterbody (Chapter 7); and
- (c) the 1% AEP level with the tailwater of Chapter 5; and
- (d) where the Approving Authority has adopted a 1% AEP flood depth map under Clause 7.3.4, the ground level at the plot plus the mapped 1% AEP depth.
6.11.3 Default where no level has been computed. For a plot below the Chapter 1 thresholds, or where no 1% AEP level has been computed for the plot, the lowest habitable floor and openings shall be at least the higher of:
- (a) 0.65 m above the highest crown level of the road on which the plot fronts; and
- (b) where an adopted 1% AEP flood depth map covers the plot, the ground level plus the mapped 1% AEP depth plus 0.5 m.
The Approving Authority may adopt a regional map, such as a State-approved map or a published national map of modelled 1% AEP flood depth (for example the India Flood Atlas), until a local study replaces it. A map that does not model storm surge shall not be used in place of Clause 6.11.6.
6.11.4 Basements. The crest of every basement ramp and the sill of every basement opening shall meet Clause 6.11.1. Basement drainage shall be pumped to the surface drain through a non-return valve.
6.11.5 Services. Electrical panels, transformers, standby generators, lift machinery and pumps that serve a building shall meet Clause 6.11.1.
6.11.6 Coastal band. The coastal band is the land within 500 m landward of the High Tide Line along the sea front, as defined by the CRZ Notification, 2019, with the High Tide Line as demarcated in the approved Coastal Zone Management Plan. Where the Survey of India Hazard Line lies further inland than 500 m, the band extends to the Hazard Line. Within the coastal band, in addition to Clauses 6.11.1 to 6.11.5:
- (a) the lowest habitable floor and every opening shall also be at least 0.5 m above the coastal flood level, which is the 1% AEP still-water level (Clause 5.7.3(b), Annex 5A) plus twice the sea-level allowance of Clause 5.7.4 (so at least 0.6 m), because buildings have a design life of more than 50 years (Clause 5.7.4(c));
- (b) where the plot fronts the open beach, the coastal flood level shall include wave set-up from a site study;
- (c) no habitable room, electrical service room or plant listed in Clause 6.11.5 shall be placed in a basement; and
- (d) every basement opening, ramp crest and ventilation opening shall meet Clause 6.11.6(a).
Clause 6.11.6 does not authorise any construction that the CRZ Notification prohibits. Where both apply, the stricter governs.
Figure 6.5 — Coastal band: the minimum floor level built up from the 1% AEP still-water level, twice the sea-level allowance, wave set-up where the plot fronts the open beach and 0.5 m freeboard; and the extent of the band, to 500 m from the High Tide Line or to the Hazard Line where it lies further inland (Clause 6.11.6). Original drawing for this Manual, adapted from the CRZ Notification, 2019 (para 1(i) and Annexure IV) and PUB Singapore, Code of Practice on Surface Water Drainage (7th ed.), cl. 2.1.1.
Commentary. The 0.5 m freeboard above the 1% AEP level follows the DID Malaysia 2008 checklist (platform and lowest floor at 100-yr ARI + 0.5 m). It is more than the APWA 5600 (2006, 5601.8 A2) requirement of 1 ft (about 0.3 m) above the 1% stage. The 0.65 m default in Clause 6.11.3 is derived from the other limits of this chapter, not separately sourced: the 1% water level at the crown may be up to 150 mm (Table 6.2), plus the 0.5 m freeboard. It has no direct precedent and applies to plots where no flood level exists. URDPFI (2015) also links minimum plinth levels to flood frequency in its flood-plain zoning, which is covered in Chapter 7.
Clause 6.11.3(b) lets a small plot use a mapped 1% AEP depth where no local study exists, instead of guessing from the road level alone. Modelled national maps are coarse (about 30 m), and most model rainfall and river flooding but not storm surge, which is why 6.11.3 keeps the road-crown check and Clause 6.11.6 sets a separate coastal rule.
The coastal band of Clause 6.11.6 uses the 500 m line of the CRZ Notification, 2019 (G.S.R. 37(E), para 1(i): "the land area from High Tide Line ... to 500 meters on the landward side"), because every coastal authority already maps it and it needs no new survey. The Hazard Line, demarcated by the Survey of India to show the extent of flooding and shoreline change, extends the band where it lies further inland (CRZ Notification, 2019, Annexure IV). The band takes the coastal level from the joint-case still-water level of Chapter 5 rather than from the rainfall map. The higher standard reflects the setting: a coastal flood rises with the sea, cannot be drained while the tide is up, and will rise further with the sea. Singapore takes the same approach with a fixed minimum platform level of 4.0 m above datum on its southern coast and 4.5 m on its northern coast, whatever the rainfall flood level (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 2.1.1). Each coastal State's tide and surge levels vary too much along its coast for one fixed level, so this Manual uses the computed still-water level instead. Using twice the sea-level allowance applies the sensitivity case of Clause 5.7.4(c) as the design case, because a building, unlike a drain, cannot easily be raised later. The basement restriction in 6.11.6(c) is set by this Manual: a basement in the coastal band fills from the sea as well as from rain, and cannot be pumped out to a tide-locked outfall. Jammu and Kashmir has no coast, no High Tide Line and no Coastal Regulation Zone, so the coastal band is empty in the Union Territory and Clause 6.11.6 does not apply there. Clauses 6.11.3 and 6.11.4 matter instead. The building rules give two plinth figures and no flood level: a plinth of not less than 45 cm (UBBL-2021, cl. 6.1) and a ground-floor finish "Consistent 300 mm from centre of Road Line" (Table 5-9), which this Manual has not reconciled; the stricter applies [TBC]. Basements are kept within the building envelope and barred from habitable use (cl. 5.2.1.7), with no rule on their flooding or drainage, and building in areas vulnerable to floods is left to I&FC or to "the flood zonation maps notified by the department from time to time" (cl. 7.12(a)), none of which was found during research. Clause 6.11.3, which sets the lowest habitable floor and every opening 0.65 m above the road crown where no flood level has been computed, and Clause 6.11.4, which applies the same level, or 0.5 m above the 1% AEP flood level, to the crest of every basement ramp and the sill of every basement opening, are set by this Manual; both are stricter than the bye-laws, which they add to and do not replace. On the Kashmir valley floor behind the Jhelum's embankments, the 1% AEP flood level of Clause 6.11.2 includes the maximum level in the drained area from the outfall-closed routing of Clause 5.8.5(a), with the river shut out for the whole lock; a breach of the embankments, as in September 2014, is a residual risk that Chapter 5 reports and does not design for. A basement on the valley floor, where the water table stands 0–2 m below ground over the central valley and wells on both sides of the Jhelum flow under artesian pressure (CGWB), also needs the flotation check of Clause 4.12 with the groundwater at ground level or at the artesian head. On a hillside the road crown is not always the right reference: a building below a road takes the road's runoff, so Clause 6.11.2(a) sets its floor and openings from the 1% AEP level of the flow path past it, with the uphill diversion of Clause 6.3.6(h) in place, and a floor or basement cut into a slope also needs the geotechnical certificate of the hill infiltration rule (Clause 4.11). Along the rivers, khads, nallahs, canals and khuls, near the lakes, nambals, talabs and springs and on the shores of the reservoirs, the lines of Chapter 7 also apply.
6.12 Culverts and road crossings
6.12.1 Design AEP. A culvert or bridge that carries a road over a drain or waterway shall pass the design AEP flow of Table 6.1 for that road class without overtopping the road, and with the headwater limits of Chapter 9, Clause 9.4. Where the waterway is a State highway or national highway crossing, the design AEP shall also be not less than that of IRC:SP:42-2014 §7.1.4 for the span. The rarer AEP governs.
6.12.2 Check event and 1% AEP. At the check event and at the 1% AEP event, the crossing and the road together shall pass the flow:
- (a) with overtopping depth ≤ 150 mm at the road crown and ≤ 350 mm at the deepest point of the road;
- (b) within the hazard limits of Table 6.3;
- (c) with no overtopping at all of arterial roads that are notified evacuation routes; and
- (d) without raising the 1% AEP flood level at any upstream building or property boundary above the level for the existing condition, unless the affected owners and the approving authority agree.
6.12.3 Where overtopping is not permitted. Overtopping in the 1% AEP event is permitted only where the structure span is less than 6 m and the 1% AEP peak flow is not more than 7 m³/s, unless a guard rail is installed downstream of the overtopping section. Otherwise, the crossing shall pass the 1% AEP flow without overtopping.
6.12.4 Blockage check. The 1% AEP check shall be repeated with a blocked inlet:
- (a) 50% of the inlet area blocked for culverts with a span or diameter below 1.5 m; and
- (b) 20% blocked for larger culverts.
The results of this check shall meet Clause 6.12.2(a) and (d).
6.12.5 Minimum size. Culverts under public roads shall be at least 900 mm in diameter, or 900 mm × 900 mm for box culverts.
6.12.6 Hydraulic design. Culvert hydraulics, including inlet and outlet control, tailwater, road overtopping and outlet protection, shall follow Chapter 9, Clauses 9.4 and 9.6.
Commentary. The design AEPs are those of Table 6.1. The overtopping limits are the street-depth limits of Table 6.2. The span and flow threshold in Clause 6.12.3 is the SI conversion of APWA 5600 (2006): overtopping allowed only where the structure span is under 20 ft and the 1% peak is 250 cfs or less, unless a downstream guard fence is installed. IRC:SP:42-2014 (§7.1.4) sets 25-yr for NH/SH culverts up to 2 m span and 50-yr for 2–6 m spans. The blockage percentages in Clause 6.12.4 and the 900 mm minimum size have no direct precedent and are set by this Manual. The 50% value matches the grate clogging factor.
6.13 Jammu and Kashmir construction-practice requirements
6.13.1 Covered roadside drains. Where a roadside drain is covered by slabs that form a footpath:
- (a) it shall be designed as an open channel with the freeboard of Table 6.7 measured to the soffit of the cover slab, and its HGL shall meet Clause 6.8 measured to the footpath and inlet levels;
- (b) road runoff shall enter through openings in the drain wall at road level (Clause 6.6.1(b)), each with a silt sump (Clause 6.6.7), at the spacing of Clause 6.6.4;
- (c) footpath runoff shall enter through slots or grated openings in the cover, not by ponding on the footpath; and
- (d) the clear section shall meet Clause 6.7.6(c).
6.13.2 Removable covers and access openings. Covered drains shall have:
- (a) removable cover panels at not more than 10 m centres, each at least 0.6 m long and spanning the full clear width, with recessed lifting points, liftable by two workers or by a hand-operated lifting device, and flush with the footpath;
- (b) access chambers with a clear opening of at least 0.6 m × 0.6 m at every junction, bend and change of section, and at not more than 30 m centres on straight runs; and
- (c) covers rated for the traffic or pedestrian load at their location (Chapter 9, Clause 9.11).
6.13.3 Silt traps. In addition to the inlet sumps of Clause 6.6.7, silt trap chambers shall be provided:
- (a) upstream of every culvert under an arterial road;
- (b) upstream of every pump station and detention facility; and
- (c) at every outfall to a tank, river or other waterbody (with the gross pollutant trap required by Chapter 8).
Each silt trap shall be sized to hold the sediment expected between scheduled cleanings, using the sediment yield in Annex 6B, and shall be reachable by a desilting vehicle.
6.13.4 Garbage and gross pollutant screens. Screens shall be provided where an open drain enters a covered drain, a pipe or a culvert, and at outfalls under Chapter 8. Each screen shall:
- (a) be designed under Chapter 9, Clause 9.8;
- (b) have a bypass or overflow, so that a fully blinded screen does not flood properties or the road beyond the limits of this chapter; and
- (c) be checked hydraulically with 50% of its area blocked.
6.13.5 No building over drains. No structure other than an approved crossing or a removable cover shall be built over a public drain. Shop frontages, ramps and steps that cross a drain shall be removable or shall leave access openings that meet Clause 6.13.2.
6.13.6 Utilities. No water main, sewer, power or telecom cable, gas pipe or duct shall be laid along, or pass through, the flow area or freeboard of any drain. A utility that must cross a drain shall:
- (a) cross above the cover soffit or below the drain invert, inside a sleeve; and
- (b) be shown on the drainage plan with its level.
Where an existing utility crossing obstructs a drain, its area shall be deducted from the drain section, with a 50% blockage allowance for the debris it traps, until the utility is relocated. The utility owner shall relocate it when the drain is rebuilt.
6.13.7 Sewage. No sewage connection is permitted to a storm drain (Chapter 8). Covered drains shall be built with sealed joints where they run next to sewers.
6.13.8 Edge protection. Open drains deeper than 1.0 m beside a footpath, a carriageway or a public open space shall have railings or barriers. Open drains of any depth shall not be left uncovered across a footpath.
6.13.9 As-built levels. The as-built invert levels of every public drain, pipe and manhole shall be surveyed and submitted (Chapter 10). Inverts shall be within ±15 mm of design. An HGL re-check shall be submitted where they are not.
6.13.10 Desilting. Public drains shall be desilted before the south-west monsoon each year, as set out in Chapter 10.
Commentary. Clause 6.13 has no direct precedent; this Manual sets it on the basis of Jammu and Kashmir practice. Most urban drains in the State are covered roadside drains under footpaths. They are often built with continuous cast-in-situ slabs and few openings, so they cannot be cleaned and fill with silt and solid waste within a season. CPHEEO (2019) notes that uncovered channels "are prone to the dumping of garbage" (Part A, Ch 2), which is why the drains are covered. Covering without access openings simply moves the problem out of sight. NDMA (2010) recommends that pre-monsoon desilting be complete by 31 March. Jammu and Kashmir has two rainfall regimes, and the desilting calendar has to serve both. In the Jammu division the south-west monsoon normally sets in on 28 June and withdraws on 21 September (IMD normals for Jammu), but it set in as early as 13 June in 2021 (as reported), it withdraws from most of the Union Territory only by about 1 October, and storms come after it: Jammu recorded 160.0 mm on 5 October 1955 and Basohli 229 mm on 14 October 1955 (IMD; CWC, 1994). On the floor of the Kashmir valley only about 30% of the year's rain falls in June to September, and the wettest month is March (IMD normals for Srinagar); the western disturbances of December to April and the snowmelt of March to May raise the lakes and the water table, and the largest floods of both divisions, in September 1988, 1992 and 2014, came when monsoon moisture met a western trough (Chapter 2). The only directions found are that JMC's "first phase of de-silting shall be completed before the end of June" (2017), that 191 nallahs and 143 deep drains be cleaned before the monsoon (2020), and that SMC dewater the city after the snowfall and snowmelt of January 2026 (all as reported); no desilting order of H&UDD or of a Municipal Corporation with a completion date was found during research [TBC]. So Clause 6.13.10 refers to the south-west monsoon, and Chapter 10 requires, across the Union Territory, desilting and the clearance of debris from drains, racks, traps and culverts to be complete by 31 May; inlets, debris racks, culverts, flap gates and pumps to be certified ready and test-run by 15 June (Clauses 5.11.5 and 5.12.9), before the earliest recorded onset; and standby to continue until 31 October, because of the late withdrawals and the October storms. In sub-area JK-C it also requires the inlets to be cleared of snow and ice and every dewatering station to be run at full duty by 15 March, ahead of the western-disturbance maximum and the snowmelt, a second clearance of the drains by 15 August, ahead of the storms of late August and September, and the pumps to stand by from 1 March to 31 October and to be on call in a winter snowmelt; in the hill towns of sub-areas JK-B, JK-B1 and JK-D, a second clearance of debris racks, traps and culverts after the monsoon, by 31 October, because every storm in the hills fills them; and in towns above about 1,500 m, inlets kept clear of snow and ice from December to March. These dates are set by this Manual.
No rule of the bye-laws on building over a drain was found, and the drainage sections of the Jammu and Kashmir Municipal Corporation Act 2000 and Municipal Act 2000 were not read [TBC]. The bye-laws let the Authority require roof water to be carried "to a covered channel formed beneath the public footpath" (UBBL-2021, cl. 6.20), which is a covered drain under Clause 6.13.2. Natural drains, khads and nallahs are open channels with a drainage reserve (Clause 6.9), and should not be covered, decked or built over: the Jammu Master Plan 2032 found that "the drainage channels have fallen prey to the accelerated urban growth" and calls for an EIA "before training and covering the drainage channels" (chapter 1 and §7.3.2), and the High Court has directed that "no construction of any kind is raised near the water bodies" (PIL 8/2017, quoting its order of 10 June 2016). Where a drain is covered, Clause 6.13.2 applies to it in full; where it is open beside a footpath or a carriageway, Clause 6.13.8 applies. In the hill towns many drains run beside steps and footpaths on steep ground, where an open drain is a fall hazard and a covered one cannot be cleared of stones without its access openings.
Clause 6.13.7 is not yet the practice. In Srinagar 62.01 MLD of the 193.34 MLD of sewage generated was treated in 2024, 32.07%, and untreated sewage "gets entry into the Dal Lake from areas like Telbal, Lalbazar" (JKPCC, NGT O.A. 504/2024, 14 August 2024); in Jammu "Storm water drains carry considerable quantities of raw and untreated effluents", and the BOD of 90% of the city's drains is that of "weak to strong domestic sewage" (Jammu Master Plan 2032, §5.1.3); and in October 2025 CPCB listed seven polluted stretches in the Union Territory, among them the Chunt Kol in Srinagar, the Jhelum from its confluence with the Vishav to Baramulla, the Tawi from the Tawi Bridge to the Balol Nallah, the Basantar at Samba and the Devak at Udhampur (CPCB, as filed by JKPCC in NGT O.A. 413/2025). Clause 8.9 sets how dry-weather flow in storm drains is surveyed and intercepted until the connections are removed, including the rule that interception shall not reduce the capacity of the drain (Clause 8.9.5(b)).
The 10 m and 30 m spacings and the ±15 mm tolerance have no direct precedent and are set by this Manual. Clause 6.13.6 responds to the common sight of water mains and cables running through drains. Each one traps debris and reduces the section. Mechanical cleaning through cover openings, rather than manual entry, is assumed throughout, consistent with the Prohibition of Employment as Manual Scavengers and their Rehabilitation Act, 2013.
6.14 Outfalls
6.14.1 Outfalls shall be designed for the tailwater conditions of Chapter 5. Outfalls below the 1% AEP still-water level shall have flap or tide gates or non-return valves (Chapter 5 and Chapter 9, Clause 9.10).
6.14.2 Outfall protection and energy dissipation shall be designed under Chapter 9, Clause 9.6. Outfalls to tanks and waterbodies shall also meet Chapters 7 and 8.
6.15 Submittal requirements
Every conveyance submittal shall include a Conveyance Design Report (Form 6-1) containing:
- a catchment plan showing sub-catchments, the minor system, inlet locations and the major-system overland flow paths for the 1% AEP event (Clause 6.3.2);
- the land-use and road-class AEP adopted for each element (Table 6.1), and the high-density area status;
- design flows, with the rainfall sheet of Chapter 2 and the method of Chapter 3;
- gutter spread, depth and D·V checks for the minor, check and 1% events (Tables 6.2 and 6.3);
- an inlet schedule with clean capacity, clogging factor, design capacity and bypass flow (Clause 6.6);
- pipe and drain design tables with n, velocity, sediment allowance and freeboard (Clause 6.7);
- HGL profiles for the minor and check events, with the tailwater used (Clause 6.8);
- sag ponding levels, including the fully-blocked check (Clause 6.10);
- a floor-level schedule for every building (Clause 6.11);
- culvert and crossing calculations (Clause 6.12 and Chapter 9); and
- a utilities-crossing schedule and access-opening layout for covered drains (Clause 6.13).
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Volume I, Part A: Engineering Design. Tables 4.1, 5.1, 5.2, 5.3, 5.8, 5.11, 5.12, 6.2, 11.2, 11.5; §5.3, §5.6.2, Fig. 5.9. https://www.mohua.gov.in/static/uploads/2025/10/8a2456c722036d78c72a698898ef846d.pdf
- PUB Singapore (2018, with Addendum No. 3, April 2025). Code of Practice on Surface Water Drainage, 7th edition. Clauses 1.1, 2.1.1, 5.1, 5.3, 9.6, 9.7 and Appendix 1 (Drainage Reserve Requirements). https://www.pub.gov.sg/-/media/PUB/PDF/Code-of-Practices-and-Submission-Guidelines/Surface-Water-Drainage/Code-of-Practice-on-Surface-Water-Drainage.pdf
- Indian Roads Congress (2013). IRC:SP:50-2013, Guidelines on Urban Drainage (First Revision). https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.050.2013.pdf
- Indian Roads Congress (2014). IRC:SP:42-2014, Guidelines on Road Drainage (First Revision). https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.042.2014.pdf
- Bureau of Indian Standards. IS 7784 (Part 1): 1993, Code of practice for design of cross drainage works, Part 1: General features (as cited in CPHEEO 2019 Table 5.12).
- Federal Highway Administration (2024). Urban Drainage Design Manual, Hydraulic Engineering Circular No. 22, 4th edition, FHWA-HIF-24-006. (3rd edition 2009, FHWA-NHI-10-009.)
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.8, 5604.2, 5608.4). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf ; and Version 2025.01 (Dec 2025).
- Australian Institute for Disaster Resilience (2014). Australian Disaster Resilience Guideline 7-3: Technical flood risk management guideline: Flood hazard. Tables 1 and 2. https://knowledge.aidr.org.au/media/1891/guideline-7-3-technical-flood-risk-management.pdf
- Smith, G.P. and Wasko, C.D. (2012). Australian Rainfall and Runoff Revision Project 15: Two-dimensional modelling in urban and rural floodplains. Engineers Australia.
- Ball, J. et al. (eds) (2019). Australian Rainfall and Runoff: A Guide to Flood Estimation, Book 6 (Chapters 6 and 7). Commonwealth of Australia (Geoscience Australia).
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management; and (2012) Urban Stormwater Management Manual for Malaysia (MSMA), 2nd edition.
- Gupta, K. Return Period and Rainfall Intensity for Drainage Design in India. IIT Bombay. https://www.civil.iitb.ac.in/~kgupta/drainagedesign.pdf
- Town Planning Organisation Kashmir (2019). Srinagar Master Plan 2035 (§4.2; Tables 8-2, 8-3 and 8-4 and §8.2.3, the lake, wetland and nallah buffers; §13.3 and Tables 12-4, 12-5 and 13-6, storm-water drainage, the drainage zones and the pumping stations; §14.4.4.2, floods), https://huddobps.jk.gov.in/Srinagar_Master_Plan_2035.pdf
- Jammu Master Plan 2032 (chapter 1; §2.4, the khads; §5.1.3, drainage; §§7.3.2 and 7.3.3, the drainage channels and the buffer zones from Full Tank Level; §11.1.3, the storm-water DPR; §12.2.3, Gair Mumkin Khad), https://huddobps.jk.gov.in/JMP2032.pdf
- Bentley Systems (2023). Case study: Preparation of Drainage Master Plan and Detailed Project Report for Stormwater Drainage System in Srinagar City (Egis India; 767 km²), https://www.bentley.com/en/esdg/preparation-of-drainage-master-plan-and-detailed-project-report-for-stormwater-drainage-system-in-srinagar-city-jammu-and-kashmir/
- World Bank, Jhelum and Tawi Flood Recovery Project (P154990): Integrated Safeguards Data Sheet, 20 April 2015 (roads and bridges designed to IRC guidelines; rehabilitation of storm-water pumping stations in Srinagar), https://ewsdata.rightsindevelopment.org/files/documents/90/WB-P154990_W771BRp.pdf
- Geological Survey of India (2024). Note on Preliminary Geological Assessment of Landslide at Pernote, Ramban district, annexed to the compliance report of the Jammu and Kashmir Pollution Control Committee of 13 September 2024 in NGT O.A. 642/2024, https://www.greentribunal.gov.in/sites/default/files/news_updates/Compliance%20Report%20by%20JKPCC%20in%20OA%20No.%20642%20of%202024%20(News%20Item%20titled%20Land%20sinking%20A%20new%20environmental%20challenge%20in%20J%20&%20K.pdf
- Reports on the land subsidence at Thathri Nai Basti, Doda district, 2023, and the findings of the committee appointed by the National Green Tribunal in O.A. 93/2023 (Down To Earth), https://www.downtoearth.org.in/urbanisation/doda-land-subsidence-improper-drainage-system-among-main-causes-say-geologists-87500 and https://www.downtoearth.org.in/news/urbanisation/unplanned-constructions-wastewater-seepage-causing-land-subsidence-in-chenab-valley-95986
- SANDRP (2025). Aug 2025: Chenab, Tawi and tributaries cross highest flood levels, muck dumping worsens the impacts, https://sandrp.in/2025/08/27/aug-2025-chenab-tawi-and-tributaries-cross-highest-flood-levels-muck-dumping-worsens-the-impacts/
- Ministry of Earth Sciences. Reply to Lok Sabha Starred Question *158, 27 July 2022 (the definition of a cloudburst; the Amarnath cave AWS), http://web.archive.org/web/20250528021810/https://moes.gov.in/sites/default/files/LS-in-English-158-27-7-2022.pdf ; and press reports of the cloudbursts at Chasoti and Jodh Ghati and the landslide on the Vaishno Devi route, August 2025 (The Week, 29 August 2025), https://www.theweek.in/news/india/2025/08/29/rains-cloudburst-in-jk-leave-110-dead-destruction-of-property-infrastructure-in-two-weeks.amp.html
- Jammu and Kashmir Pollution Control Committee. Response of 14 August 2024 in NGT O.A. 504/2024 (sewage in Srinagar and the Dal), and report of March 2026 in NGT O.A. 413/2025 with the CPCB list of polluted river stretches of October 2025, https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20J%20and%20K%20PCC%20IN%20OA%20NO.%20413%20of%202025%20ABHISHT%20KUSUM%20GUPTA%20VS%20UNION%20OF%20INDIA%20AND%20ORS..pdf
- Indian Roads Congress. IRC:SP:42-2014, cl. 7.1.4 (design return periods for road drains and culverts) and cl. 8.5.1 (drainage of hill roads); and IRC:SP:48, Hill Road Manual (drainage provisions not read for this Manual).
- India Meteorological Department. Monsoon onset and withdrawal normals (Jammu: 28 June and 21 September) and the climatological normals of Jammu and Srinagar, 1991–2020; and Central Water Commission (1994), Flood Estimation Report for Western Himalayas – Zone 7, Design Office Report No. WH/22/1994, Annex 4.3 (Basohli, 14 October 1955).
- Press reports on waterlogging in Srinagar on 1 August 2019 (Kashmir Life) and in Jammu in August 2025; on JMC's desilting of nallahs and drains (2017, 2020); and on SMC's de-watering after the snowmelt of January 2026 (Kashmir Reader), as reported.
- National Disaster Management Authority (2010). National Guidelines: Management of Urban Flooding.
- MoHUA / TCPO (2015). URDPFI Guidelines, Volume I.
- Ministry of Environment, Forest and Climate Change (2019). Coastal Regulation Zone Notification, 2019, G.S.R. 37(E), 18 January 2019. Para 1(i) and Annexure IV. https://crz.elaw.in/crz2019.html
- Housing and Urban Development Department. Jammu and Kashmir Unified Building Bye-Laws, 2021, J&K Official Gazette, Extraordinary, Vol. 134, No. 39-4, 24 December 2021 (cl. 2.6(b)(xi), site plan; cl. 2.18, NOCs and the RTP's certificate; cl. 5.2.1.7, basements; cl. 5.2.5, the Conservation Green Zone; cl. 6.1 and Table 5-9, plinth; cl. 6.20, roofs; cl. 7.12, distance from water course), https://huddobps.jk.gov.in/JMCUBYL.pdf ; and S.O. 304 of 1 December 2025 (online auto-scrutiny and NOCs), https://obps.jk.gov.in/BPAMSClient/seConfigFiles/Downloads/SO%20304%20DT%2001.12.2025.pdf
- Jammu and Kashmir Water Resources (Regulation and Management) Act, 2010 (Act No. XXI of 2010), Part VI (flood basins) and s.81 (control of bed and banks), section numbers to be confirmed against an official copy; Jammu and Kashmir Flood Plain Zones (Regulation and Development) Act, 2005 (Act No. XVII of 2005), s.1(3); and Jammu and Kashmir Development Act, 1970, continued by the Jammu and Kashmir Reorganisation Act, 2019, Fifth Schedule, Table 4.
- Jammu and Kashmir Municipal Corporation Act, 2000 and Jammu and Kashmir Municipal Act, 2000 (drainage sections not read).
- High Court of Jammu and Kashmir and Ladakh, Environmental Policy Group v. Union of India, PIL 8/2017 with PIL 2/2014 and PIL 18/2018, order of 29 May 2024, https://livelaw.in/pdf_upload/pil-8-of-2017-544110.pdf ; Syed Iqbal Tahir Geelani v. State, PIL 159/2002 (the Dal, order of 19 July 2002, as quoted); and the order on the Wular of November 2020, as reported.
- Comptroller and Auditor General of India. Report No. 4 of 2016, Performance Audit of Disaster Management in the State of Jammu and Kashmir, https://cag.gov.in/webroot/uploads/download_audit_report/2017/Report_No.4_of_2016_-_Performance_Audit_of_Disaster_Management_in_the_State_of_Jammu_and_Kashmir_Government_of_Jammu_and_Kashmir.pdf
- Jammu Municipal Corporation. Urban Environmental Engineering Department, Sewerage and Drainage Division (West) Jammu, https://jmc.jk.gov.in/ueed.html ; and the reply of H&UDD in the Legislative Assembly on Srinagar's drainage, 12 February 2026, as reported (Kashmir Life), https://kashmirlife.net/srinagar-completes-10-drainage-projects-650-kilometre-storm-network-backed-by-104-permanent-dewatering-stations-425018/
- Government of India. The Prohibition of Employment as Manual Scavengers and their Rehabilitation Act, 2013.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 6A | Standard inlet types for Jammu and Kashmir with capacity curves (on grade and sag) |
| 6B | Sediment yield for silt-trap sizing and calibration of the sediment allowance |
| 6C | Standard drawings: covered roadside drain with removable covers, access chamber, inlet with silt sump |
| Form 6-1 | Conveyance Design Report checklist |
Commentary. Jammu and Kashmir's drains were not designed against any Union Territory or municipal standard: none was found during research, and no document found gives a design return period, runoff coefficient or drain size for any town. Srinagar has a Drainage Master Plan and DPR for 767 km², prepared by Egis India for a storm-water system "separate from the sewage system", but no return period, intensity, coefficient or pipe size from it has been published (as reported); the Srinagar Master Plan 2035 sets "stormwater performance standards" of 100% coverage and zero incidence of waterlogging, and encourages detention and retention as "source controls", without a design storm (§13.3); and the Jammu Master Plan 2032 finds that "the road side drains serve as storm water drains", that only 20% of the roads have side drains, covering about 40% of the city, and that the storm-water DPR is still to be prepared (§§5.1.3 and 11.1.3). The World Bank's flood recovery project after 2014 designed its roads and bridges "per the guidelines of the Indian Roads Congress" and set no drainage return period (JTFRP, 2015). The drains fail without the river: Lal Chowk, Budshah Chowk, Residence Road, M A Road and the Exhibition Grounds in Srinagar were waterlogged after 26.4 mm of rain on the morning of 1 August 2019 (as reported), and in Jammu, Gangyal, Trikuta Nagar and Nanak Nagar were waterlogged in August 2025 (as reported), and JMC listed Rajinder Nagar, Muthi, Lakhdata Bazar and Bantalab among the localities waterlogged on 23 August 2026 (as quoted [TBC]). The drains also work in two settings that the plains editions of this Manual do not meet together. On the floor of the Kashmir valley they are flat, sit over a water table 0–2 m below ground, and end behind the Jhelum's embankments in the sumps of dewatering stations (Chapter 5); in the hill towns and across the Kandi they collect water from steep slopes that deliver gravel, stones and debris with every storm, and end in khads whose beds move. The drains are also divided among owners: UEED, the Town Drainage wings of SMC and DULBK, JMC, the Municipal Councils and Committees, SDA, JDA, the Smart City companies, the Public Works (R&B) Department and NHAI all build or hold drains, and I&FC, LCMA and WUCMA hold the receiving waters, and no rule divides them (see the Commentary to Clause 6.9). Fixing the rainfall (Chapter 2) is only half the answer. The other half is a second, surface-level system that carries the flows the pipes cannot, without flooding buildings. That is the dual drainage concept of this chapter, taken from Kansas City Metro APWA Section 5600 (5601.8, Levels of Service), which requires every element to have a 1% AEP overflow path.