Chapter 7Waterbodies, Lakes, Marshes (Nambals) and Talabs (Ponds) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (talab) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Jammu and Kashmir, with no coast and no tidal water, means the five Ramsar sites, Wular, Hokersar, Surinsar–Mansar, Hygam and Shallabugh, the seven Wildlife Conservation Reserves of 1945, the lakes, nambals and flood basins of the Kashmir valley, such as Dal, Nigeen, Anchar, Brari Nambal, Khushalsar, Gilsar, Narkara, Rakh-e-Arth and Manasbal, any wetland notified under the 2017 Rules (none was found notified), and the wetlands of more than 1 ha outside forests listed before the National Green Tribunal in 2026;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Jammu and Kashmir Unified Building Bye-Laws 2021 and the master plans made under the Jammu and Kashmir Development Act, 1970, the Jammu and Kashmir Water Resources (Regulation and Management) Act, 2010, the Jammu and Kashmir Flood Plain Zones (Regulation and Development) Act, 2005 (once it is brought into force), the Municipal Acts of 2000, the Jammu and Kashmir Land Revenue Act, Svt. 1996, the Kahcharai Act, Svt. 2011, the Wildlife (Protection) Act, 1972 (for the Wildlife Conservation Reserves), the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river (such as the Jhelum, the Chenab, the Tawi, the Ravi, the Ujh, the Basantar, the Devak, the Lidder, the Vishav and the Doodhganga), khad (a seasonal torrent or ravine stream of the Kandi and the outer hills, dry for most of the year and boulder-laden in flood, such as the Balol, Thather and Bhalwal khads of Jammu), nallah (a natural or artificial drainage channel, such as the Telbal Nallah, the Nallah Amir Khan and the Sindh Nallah), kol (a stream or canal, such as the Tsunth Kol), city channel or flood spill channel, canal (such as the Ranbir and Sindh canals), kuhl or zamindari khul (an irrigation channel), lake or sar (such as Dal, Nigeen, Anchar, Manasbal, Wular, Mansar and Surinsar), nambal (a marsh or shallow lake choked by vegetation, such as Brari Nambal, Hokersar and Narkara), flood basin or flood-absorption marsh (such as Rakh-e-Arth and Shallabugh), talab (a pond or tank, such as the Kandi ponds of the Jammu plains), reservoir or barrage pond (such as Salal, Baglihar, Dul Hasti and the Tawi barrage at Jammu), spring (nag or cashma) with its recharge area, wetland (such as the Ramsar sites of Wular, Hokersar, Hygam, Shallabugh and Surinsar–Mansar, and the Wildlife Conservation Reserves), glacial or moraine-dammed lake, supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (talab) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (outlet weir, spillway, gate or lock) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by I&FC and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (nallah, kol, kuhl or feeder channel) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice, gate, lock or regulator) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Jammu and Kashmir terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Talab (तालाब; تالاب; Kashmiri talāv) | A pond or tank: "Pond, pool, tank, reservoir of water" in Platts (tālāb), and "an artificial pond, a tank" in Grierson's Kashmiri dictionary (talāv) (Annex 7E). It is the word Jammu and Kashmir's own instruments use: UBBL-2021 bar development in a "water body, pond and Talav" and refer to the "talab, village tanks" (clause 7.12(c)), and the Jammu Master Plan 2032 calls for the "village ponds or talabs" to be revived for recharge. It is used here for any built pond or tank, including the Kandi ponds of Jammu and Kathua. A talab with a controlled outlet is a tank under Clause 7.2; a talab with an uncontrolled outlet has its FTL at the crest of that outlet, found by survey. Because Kashmiri talab (طلب) also means pay or wages, the word is always written with its script or gloss. Natural waterbodies keep their own words: a lake is a sar and a marsh a nambal, and an engineered detention basin is never called a talab, sar, nambal or nag: it is a detention pond. |
| Lake (sar) and lake outlet | A lake is a natural body of standing water, such as Dal, Nigeen, Anchar, Manasbal, Wular, Mansar and Surinsar. Where a lake drains through a gate, lock, weir or regulator, such as Dal Gate (a lock and weir to the Tsunth Kol) and the Nallah Amir Khan, that structure is its sluice under Clause 7.2, and its FTL is the level at which it spills over its outlet with every gate closed, found by survey and stated to the datum of Clause 7.3.5. Where the river into which a lake drains can shut its outlet, as the Jhelum shuts Dal Gate (Grierson records that the gates of the Ḍal-darwāza "automatically close" when the river rises), the lake is a store that cannot empty while the river is high, and a design that relies on it follows the commentary to Clause 7.8. |
| Nambal; flood basin; flood-absorption marsh | A nambal is "a grass-grown lake, a lake choked by vegetation, a shallow lake, a marsh, swamp" (Grierson), such as Brari Nambal, Nambal Narkur (Narkara), the Shalbug Nambal and the Drangbal Nambal. A flood-absorption marsh is a nambal, rakh or other low land that fills from the river or from a city's outfalls in a flood and empties as the river falls, such as Hokersar, Narkara, Shallabugh, Rakh-e-Arth and Anchar below Srinagar. Every nambal, flood basin and flood-absorption marsh is a wetland under Clause 7.12 and a marsh under Table 7.1, whatever its Revenue class and whether or not it is wet on the day of survey. A "flood basin" under section 2 of the Water Resources Act, 2010 is "the area which is required for carrying the flow of the floods", declared under Part VI of that Act; a "flood zone" under section 2(d) of the Flood Plain Zones Act, 2005 is the area "required to carry the flow of the maximum probable floods", a higher standard than the 1% AEP extent of this Manual, with which it is not equated. Where a flood basin is notified under Part VI, or a flood plain zone under the 2005 Act once it is in force, its restrictions govern; until then the mapped 1% AEP flood extent of Clause 7.3.4 applies. This reading and rule are set by this Manual. |
| Recorded waterbody; Revenue class and surveyed extent | A lake, nambal, talab, nallah, khad, kol, khul, spring, reservoir or wetland shown in the Revenue records or village maps (including land recorded as Gair Mumkin Khad, nambal, rakh, kahcharai or water), on a site plan submitted under clause 2.6(b)(xi) of UBBL-2021, in the land use map or buffer tables of a master plan, in the records of a municipal body, UEED, I&FC, LCMA or WUCMA, in a Ramsar or Wildlife Conservation Reserve boundary, in the national wetland atlas, or in a list filed before the High Court of Jammu & Kashmir and Ladakh or the National Green Tribunal. A recorded waterbody is part of the drainage system for this Manual. A Revenue class records land, not its hydraulic extent: the National Green Tribunal found in its order of 13 November 2026 that wetland areas taken from Revenue records were insufficient and asked for the area on the ground, and in Baramulla a recorded rakh was reported "not existing on the spot" (as reported). For Clauses 7.3.3 and 7.13.1 the Waterbody Sheet records both the Revenue class and the surveyed extent, and the larger governs. Where a recorded waterbody is proposed to be filled, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual. |
| Boundary of a lake, nambal, talab or reservoir | For Clauses 7.3.3 and 7.13.1, the boundary of a lake, nambal or talab is the largest of its Revenue record boundary, its surveyed FTL, any boundary notified or designated for it (for a Ramsar site, the Ramsar boundary, so that Wular's is taken from the Ramsar area of 18,900 ha, not from WUCMA's 13,000 ha, until the two are reconciled), and the outer edge of its water or wet ground at its seasonal high, shown by dated imagery or survey of recent years: in the Kashmir valley the high of March to May and the high of any Jhelum flood; in the Jammu division the high of July to September. The boundary of a reservoir or barrage pond is the higher of its full reservoir level and the highest level its operator states, stated to the datum of Clause 7.3.5; its drawdown land below that level is part of it. This reading is set by this Manual. |
| Khad; nallah; Gair Mumkin Khad; functional khad | A khad (खड्ड) is a seasonal torrent or ravine stream of the Kandi and the outer hills: in Jammu "ravines, locally called Khads are transformed into gushing torrents" (Jammu Master Plan 2032, §2.4), and UBBL-2021 name "any other river/khad" with the major rivers (clause 7.12(b)). A nallah (नाला; نالا) is a natural or artificial drainage channel ("Nallas" in UBBL-2021, clause 5.2.5). Every khad or nallah that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whatever its name, whether it is dry for most of the year, and whether it is lined, piped or covered. A khad carries boulders and debris in flood: its inlets and culverts take the debris racks, bulking and blockage of Clause 6.3.6, and its top of bank is the edge of its active boulder bed where that is wider than the edge of the 50% AEP flow. Gair Mumkin Khad is a Revenue class of land (glossed in this Manual as land recorded as uncultivable stream-bed; the dictionary meaning was not checked) that covers more than thirty per cent of the land of the Jammu Development Authority (Jammu Master Plan 2032, §12.2.3); the plan proposes that it be reduced to the "true Khad i.e. is functional drainage basin during peak flow", fixed with I&FC. For this Manual, the functional khad is the 1% AEP flood extent of the khad with the climate factor of Clause 2.8 and the bulking of Clause 6.3.6(b), with Zone 1 and Zone 2 under Clause 7.4 and the wider statutory lines of Clause 7.4.5, found by a hydraulic study under Chapters 3 and 5; no land recorded as Gair Mumkin Khad is released, built on or counted as developable in a design under this Manual until that study has been made. This definition and rule are set by this Manual. |
| Kol; city channel; flood spill channel; kuhl | A kol (Kashmiri kŏl, a stream, canal or irrigation channel) is a channel such as the Tsunth Kol, which takes Dal's outflow from Dal Gate to the Jhelum. A city channel or flood spill channel, such as the channel that takes the Jhelum's flood flow from Padshahi Bagh towards Wular, is under the control of I&FC (Water Resources Act, 2010, section 81 [TBC]). A kuhl or zamindari khul (कूहल) is an irrigation channel ("zamindari khuls" are hydraulic works under section 2 of that Act). Each of these is part of the drainage system: one that drains 8 ha or more is a natural channel under Clause 7.4.1(b), and no design under this Manual discharges to it, or crosses it, unless its capacity and its outlet are shown and I&FC, or the managing body of a khul, has consented. |
| Spring (nag, cashma); spring recharge area | A spring is a place where groundwater comes out at the surface. A nag (नाग्; Kashmiri nāg) is a spring, "a fountain, a spring of water" in Grierson, as in Kokernag and Verinag, and cashma (چشمه) is a spring or fountain, as in Chashma Shahi (Annex 7E). A spring is a waterbody for Clause 7.3, and its Zone 1 under Clause 7.4 is measured from its outlet or the edge of its pool or tank. Its recharge area is the area upslope from which it is fed, as a hydrogeologist maps it; within that area Clause 8.8.1 limits infiltration, no road runoff, sewage or septic effluent is led into the ground, and no drain is cut that would intercept the flow to the spring. No storm drain or sewer is laid within Zone 1 of a spring except a lined drain below its outlet that carries its overflow away. The springs in the bed of a lake, such as those that feed Dal, are part of the lake. No Jammu and Kashmir rule or buffer for springs was found; this definition and these rules are set by this Manual. |
| Kandi pond | One of the 365 ponds of the Kandi belt, 249 in Jammu district and 116 in Kathua, of which 165 are perennial (CGWB), which hold water on the porous Kandi because of the clay in their beds. A Kandi pond is a talab for this chapter; no work under this Manual cuts through, lines over or deepens its clay bed (Clause 7.9.3). |
| Sinking and sliding zones | Any mapped subsidence, land-sinking or landslide zone, including Thathri Nai Basti in Doda, Pernote and Duksar in Ramban and the areas of Budgam district listed by JKPCC as prone to land sinking. No talab, pond, retention basin or infiltration facility is placed in them (Clause 8.8.1). |
| Glacial or moraine-dammed lake | A lake held by a glacier, moraine or landslide dam in the high mountains (sub-area JK-D of Annex 2A); no inventory of these lakes in the Union Territory was read for this Manual. It is a waterbody for Clause 7.3 and a hazard to be mapped under Chapter 5; it is never a design outfall or design storage, and no drain under this Manual discharges to it. This rule is set by this Manual. |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with I&FC and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (SMC, JMC, a Municipal Council or a Municipal Committee (for the drains within its area, under the Jammu and Kashmir Municipal Corporation Act, 2000 and the Jammu and Kashmir Municipal Act, 2000, whose drainage sections were not read [TBC]), UEED (for the sewerage and drainage works it plans, designs and builds in urban areas, and, through its Sewerage and Drainage Division (West) Jammu, within JMC limits), the Town Drainage wings of SMC and of the Directorate of Urban Local Bodies Kashmir (for the operation and maintenance of Srinagar's drains and dewatering stations), I&FC (for the rivers, khads and nallahs, their beds and banks, the embankments, the flood spill channel, the city channels such as the Tsunth Kol and the Padshahi Canal, and the canals and khuls, under section 81 of the Jammu and Kashmir Water Resources (Regulation and Management) Act, 2010 [section number TBC]), LCMA (for Dal and Nigeen and the drains it holds in their catchment), WUCMA (for Wular and its feeder channels), the Wildlife Department (for the seven Wildlife Conservation Reserves), the Forest Department (for forest land), PW (R&B) or NHAI (for the drains, catch-water drains and culverts of their roads), NHPC, JKSPDC or another dam operator (for its reservoir, its drawdown land and the reach below its dam), SDA, JDA, the J&K Housing Board, a Smart City SPV or a colony developer (for the drains of a scheme until they are handed over in writing), the State Government through the Deputy Commissioner and the Tehsildar (for land recorded in the Revenue records as Gair Mumkin Khad, nambal, rakh, kahcharai or water), the Halqa Panchayat (for the talabs, ponds and khuls of a village), the Jammu and Kashmir Wetland Authority (for a notified wetland), a private owner, or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) Revenue records and village maps of the Revenue Department, in which rivers, khads, nallahs, khuls, talabs, nambals and land covered by water are recorded, and in which drainage land in Jammu is largely recorded as Gair Mumkin Khad and marsh or grassland as nambal, rakh or kahcharai, classes that record the land, not its hydraulic extent; the "approximate location and size of any water body, flood affected areas and contours at an interval of 0.3m" that clause 2.6(b)(xi) of UBBL-2021 requires on the site plan of a sloping site, and the certificate of the registered technical person that the site is clear of drains and water bodies; the land use maps and buffer tables of the Srinagar Master Plan 2035 (Tables 8-2 to 8-4) and the Jammu Master Plan 2032 (§7.3.3), and the flood zonation of I&FC used in the Srinagar Master Plan (125 km² undevelopable and 136.50 km² vulnerable in the Srinagar planning area); the drains, nallahs and dewatering stations in the records of SMC, JMC, UEED and the other urban local bodies; I&FC's records of the rivers, khads, embankments, the flood spill channel and the city channels, and of its gauges; LCMA's records of Dal and Nigeen and WUCMA's of Wular; the boundaries of the five Ramsar sites, of the seven Wildlife Conservation Reserves and of any wetland notified under the Wetlands (Conservation and Management) Rules, 2017; NHPC's and JKSPDC's records of reservoir levels and acquired land; and the lists of wetlands, encroachments and water bodies filed before the High Court of Jammu & Kashmir and Ladakh and the National Green Tribunal, such as the 27 wetlands of more than 1 ha outside forests listed in 2026;
- (b) I&FC and Halqa Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where I&FC records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. Jammu and Kashmir has the statutes to map flood lines but no flood line in law. No flood basin has been found declared under Part VI of the Water Resources Act, 2010, which provides for survey, delineation "including classification of land", objections and a notification with maps "showing the river channel, flood channel and the flood basin area" (sections 75 to 79 [TBC]); the Flood Plain Zones Act, 2005 has not been found brought into force; and UBBL-2021 defer building in flood areas to "the flood zonation maps notified by the department from time to time" (clause 7.12(a)), none of which was found notified. The nearest thing to a flood map is in a plan: the Srinagar Master Plan 2035 used I&FC's flood zonation to find that, of its planning area of 766 km², 125 km² is undevelopable and about 136.50 km² vulnerable to floods, and that 262 km², 34%, was under water in 2014 (§4.2); the zonation itself (the plan's Annexure C) was not read. The plan also proposes to demarcate "Flood Zone from Lelhar to Lasjan on the L/s of River Jhelum on the basis of 25 year flood plain and notify the area as Protected Natural Flood Absorption Basin"; that is a proposal of the plan, not a notification, and a 25-year line is narrower than the 1% AEP extent of this Manual. In Jammu, the master plan says the khads "other than actual drainage channels" are to be "redefined and demarcated on the basis of HFL" (§2.4), and no such demarcation was found. On the Jhelum the High Court recorded on 7 April 2015 that "the actual width … has not been identified by completing demarcation till date" (as quoted in its order of 29 May 2024). The site plan of a building application shows "the approximate location and size of any water body, flood affected areas and contours at an interval of 0.3m" where the slope is more than 1 in 20 (UBBL-2021, clause 2.6(b)(xi)), but not a flood level. The rivers are gauged by two systems that cannot be tied together. CWC reports levels in metres at seven sites, with no datum stated in the sources read: on the Jhelum at Khanabal, Sangam, Ram Munshi Bagh and Safapora, on the Chenab at Akhnoor, on the Lidder at Ganeshpura and on the Tawi at Sidhra, where the highest flood level rose from 318.85 m (2014) to 321.1 m on 26 August 2025; at Ram Munshi Bagh the highest flood level of 8 September 2014 is 1,588.99 m in the 2022 list and 1,589.65 m in the 2018 list (all as transcribed by SANDRP). I&FC reads its staff gauges in feet, with gauge zeros that are not published and readings that can go below zero, so that a reading such as the flood-declaration stage of 18 ft at Ram Munshi Bagh is not a level above mean sea level; no I&FC foot reading is converted to metres in this Manual. The best evidence of flood extent is therefore on the ground and in the record: the flood marks of September 2014 (floodwater depths "of up to 16 feet" and an inundation of up to 25 days, Malik, 2021) and of August–September 2025, the extent of the 2014 flood used in the Srinagar plan, and the HFLs of the CWC sites. Clause 7.3.4 lets the Authority adopt flood maps once they exist; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, with the river stage of Clause 5.8.5(a) behind every Jhelum embankment, the bulking of Clause 6.3.6 on khads and the surveyed flood marks of Clause 5.8.5(b) and (c), and a flood line delineated in a plan is a minimum that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Every level shall be stated with the gauge or benchmark and the datum it refers to (Clause 7.3.5). Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual, which applies only where nothing wider binds (wider lines govern under Clause 7.4.5, and in Jammu and Kashmir they usually do: where UBBL-2021 apply, clause 7.12(b) keeps development 50 m from the edge of the bank of the major rivers "or any other river/khad", 30 m from the edge of the listed lakes "and other lakes" and 20 m from the edge of unlisted rivulets, tributaries, minor canals and watercourses, and clause 5.2.5 keeps a green buffer of at least 30 m from the highest water level along nallahs and rivers, "whichever is more"; the master plans and the High Court add wider lines round the lakes and wetlands; this Manual's 15 m governs along springs, talabs and village ponds, for which no distance has been prescribed, along drains and channels that no statutory line names, and in areas outside the reach of the bye-laws and master plans; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the consent of I&FC for a work on the bed or banks of a river, khad or nallah, an embankment, the flood spill channel or a city channel (Jammu and Kashmir Water Resources (Regulation and Management) Act, 2010, section 81 [section number TBC]), its permission for a building in the vicinity of an irrigation or hydraulic work (section 66 [TBC]) and its online NOC under S.O. 304 of 1 December 2025, the NOC of LCMA for a work in the Dal–Nigeen area, the consent of WUCMA for a work at Wular or on its feeder channels, the permission of the Wildlife Department for a work in a Wildlife Conservation Reserve, the views of the Jammu and Kashmir Wetland Authority for a work in or next to a Ramsar site or a notified wetland, a buffer of the Srinagar Master Plan 2035 (Tables 8-2 and 8-3, and §8.2.3) or the Jammu Master Plan 2032 (§7.3.3), the consent of NHPC, JKSPDC or another dam operator for a work that drains to, or lies next to, its reservoir or the reach below its dam, or a direction of the High Court of Jammu & Kashmir and Ladakh or the National Green Tribunal (such as the High Court's 200 m no-construction line round Dal, listed in the Disclosure to Clause 7.4) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual, as the floor of a hydraulic corridor where no wider line binds. Jammu and Kashmir has statutory distances from water, and they are wide. UBBL-2021, clause 7.12(b), provides that "No development, whether by filling or otherwise, shall be carried out from the edge of the bank of rivers, within following specified buffer or as per building regulation whichever is more": 50 m for the major rivers "or any other river/khad", 30 m for the listed lakes "and other lakes", and 20 m for unlisted rivulets, tributaries, minor canals and watercourses; clause 5.2.5 keeps a green buffer along nallahs and rivers of at least 30 m "from the highest water level"; the Srinagar and Jammu master plans set their own buffers, measured from the lake edge and from Full Tank Level; and the High Court holds a 200 m no-construction line round Dal and, as reported, round Wular. The 15 m floor therefore matters only where none of these reaches: along springs, talabs and village ponds, for which clause 7.12(c) leaves the distance "as may be prescribed" and none was found prescribed; along drains and channels that no line names; and in villages and other areas outside the reach of the bye-laws and master plans. It is this Manual's proposal, not a statutory width, and it never reduces a wider line (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Jammu and Kashmir flood maps are mostly coarser than US maps, the Kashmir valley floor is nearly flat, its towns stand behind the Jhelum's embankments on alluvium, Gurti clay and Nambal peat with the water table within 2 m of the ground, and the Sirowal of the Jammu plains falls at only 1 in 250 to 1 in 300 (CGWB) (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Jammu and Kashmir's building rules are the Jammu and Kashmir Unified Building Bye-Laws 2021, published in the J&K Official Gazette (Extraordinary, Vol. 134, No. 39-4) of 24 December 2021 in the copy of the Jammu Municipal Corporation, adopted body by body on a common text, and amended by the Corporation's notification of 9 March 2022 and by H&UDD's S.O. 304 of 1 December 2025 and S.O. 58 of 26 February 2026 (the last seen only as a title); draft amendments of 9 September 2026 were reported and not read. Clause 7.12, "Distance from water course", provides: "(a) The building activity in the areas vulnerable to floods/flash floods shall be regulated under the provision of Irrigation and Flood Control Department or the flood zonation maps notified by the department from time to time"; "(b) No development, whether by filling or otherwise, shall be carried out from the edge of the bank of rivers, within following specified buffer or as per building regulation whichever is more": 50 m from the edge for the listed major watercourses, the Chenab, Jhelum, Tawi, Ravi and Ujh "or any other river/khad"; 30 m from the edge for the listed minor watercourses, "Mansar, Surinsar, Wular, Nageen, Manasbal and other lakes"; and 20 m from the edge for "Unlisted rivulets, tributaries, minor canals and/or Watercourse", such as the "Ranbir canal, Sindh canal and other similar canals" (the 50 m line is "Recommended safe distance (Buffer) … or as specified under the relevant regulatory Act or the relevant Master Plan"); and "(c) In case of talab, village tanks, lake, water bodies etc., the distance from the water body shall be as may be prescribed under any other general or specific orders of the BPIA." The clause's list of major watercourses also names a river that does not flow through the Union Territory; this Manual reads the clause for the rivers that do. Clause 5.2.5 provides that in the Conservation Green Zone "The green buffer along the Nallas/Rivers or the open space along the River/tributary shall be minimum 30 m from the highest water level or as provided in the master plan/zonal development plan or as provided under Water Regulatory Act, whichever is more", with no building in the zone; the use-zone notes bar development "in area designated for water body, pond and Talav excluding River-front Development"; and S.O. 304 adds a "WATERBODY USE_NEGATIVE LIST" of "All Permanent structures except kiosks, cafeteria, toilet units or any other public utilities". The Srinagar Master Plan 2035 sets, in Table 8-2, 50 m from the lake edge or building line from Dalgate to Nehru Park, 100 m from the lake edge from Nehru Park to the Nishat junction, 50 m on the Telbal Nallah and 20 m on the Nallah Amir Khan, the other feeder nallahs and the circulation, navigation and irrigation channels, with the buffers round Dal, Nigeen, Brari Nambal, Khushalsar, Gilsar and Anchar "subject to the outcome" of the public interest litigation before the High Court; in Table 8-3, 200 m on the south, north and west and 30 m on the east of Anchar, the Shalbug Nambal and the Haran forest, 200 m on the south and west and 50 m on the east and north of Hokersar, 50 m round Khushalsar and Gilsar, on the Sukhnag Nallah and on the Sind Nallah, 100 m round the Nambal Narkur, 20 m on the Doodhganga Nallah and 20 m round other small water bodies; and, in §8.2.3, 100 m round any wetland reserve not listed. The Jammu Master Plan 2032 sets "No-Construction Zones" in §7.3.3, measured from Full Tank Level: 50 m along the Tawi, the Devak and the Basantar (30 m in built-up areas), 15 m along the Balol, Thather and Bhalwal khads, and 5 m along other water bodies shown in the proposed land use. The High Court holds a 200 m no-construction line round Dal: the order of 19 July 2002 in PIL 159/2002 (as quoted); the order of 8 September 2022, which accepted the master-plan buffers for other water bodies while keeping 200 m for Dal (as reported); the order of 13 June 2023 letting the Government proceed to modify the master plan after a technical committee reported (as reported); and the judgment of 30 October 2025, reported to keep the 200 m line, which was not read and whose words are not quoted here. LAWDA refused permission in 2021 for land "within 200 meters from the fringe of the Nigeen Lake" (as quoted), and the High Court was reported in November 2020 to have barred construction within 200 m of Wular. On the Jhelum the Court directed in 2015 that "the original width of the river Jhelum is restored" and in 2016 that "no construction of any kind is raised near the water bodies" (as quoted in its order of 29 May 2024 in PIL 8/2017). The statutory routes for flood land have not been used: no flood basin has been found declared under Part VI of the Water Resources Act, 2010, the Flood Plain Zones Act, 2005 has not been found brought into force, and no flood zonation map was found notified under clause 7.12(a). The lines leave gaps. They are measured from three different lines: clause 7.12 from "the edge of the bank", clause 5.2.5 from "the highest water level", the Srinagar plan from the lake "edge" or "fringe", and the Jammu plan from "Full Tank Level", which for a river or a khad has no defined meaning; the Jammu plan's 15 m and 5 m khad lines are narrower than the 50 m that clause 7.12 gives "any other river/khad" and the 20 m it gives any other watercourse; no line is set for a talab, village tank or spring, which clause 7.12(c) leaves to be prescribed; and none is tied to a design flood. This Manual maps each line onto its own (Clause 7.4, Disclosure), and Clause 7.4.7 makes 15 m the floor of Zone 1 where nothing wider binds.
Disclosure. Jammu and Kashmir has statutory distances from water, and they are wide: where UBBL-2021 apply, clause 7.12(b) keeps development 50 m from the edge of the bank of the major rivers "or any other river/khad", 30 m from the edge of the listed lakes "and other lakes", and 20 m from the edge of unlisted rivulets, tributaries, minor canals and watercourses, "or as per building regulation whichever is more", and clause 5.2.5 keeps a green buffer of at least 30 m from the highest water level along nallahs and rivers; the master plans add their own buffers; and the High Court holds 200 m round Dal. What the Union Territory lacks is a flood line: the Flood Plain Zones Act, 2005 has not been found in force, no flood basin has been found declared under Part VI of the Water Resources Act, 2010, and no flood zonation map was found notified under clause 7.12(a). The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor that applies only where nothing wider binds: along springs, talabs, village ponds and Kandi ponds, for which no distance has been prescribed; along drains and channels that no statutory line names; and outside the areas where the bye-laws and master plans apply. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's reading of the boundary of a lake, nambal, talab or reservoir, the functional-khad study before any release of Gair Mumkin Khad land, and the rules on springs, kols and khuls, sinking zones and glacial lakes (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body has adopted or endorsed them. The setback is applied as the larger of the corridor and every statutory, plan, court or Tribunal line ("whichever is more"), so the Manual is no less strict than any of them anywhere. Where a flood basin is notified under Part VI of the Water Resources Act, 2010, or a flood plain zone under the 2005 Act once it is in force, its restrictions govern; until then the mapped 1% AEP flood extent of Clause 7.3.4 applies. What exists, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- UBBL-2021, clause 7.12(b) (as amended). 50 m (Chenab, Jhelum, Tawi, Ravi, Ujh "or any other river/khad"), 30 m (Mansar, Surinsar, Wular, Nageen, Manasbal "and other lakes") and 20 m (unlisted rivulets, tributaries, minor canals and watercourses, such as the Ranbir and Sindh canals), from the edge of the bank. For this Manual "the edge of the bank" is the top of bank of Clause 7.2, the line from which Zone 1 is measured, so a clause 7.12 line wider than Zone 1 governs as Zone 1.
- UBBL-2021, clause 5.2.5. A green buffer of at least 30 m from the highest water level along nallahs and rivers, in which no building is permitted. For this Manual "the highest water level" is the higher of the highest level recorded at the site and the 1% AEP flood level with the climate factor, so the 30 m is measured outward from the edge of the 1% AEP extent where that has been mapped (a reading set by this Manual); the outer 30 m then lies inside or beyond Zone 2 and governs where it is wider.
- UBBL-2021, clause 7.12(c). For a talab, village tank, lake or other water body, the distance "as may be prescribed" by the building permit issuing authority. None was found prescribed; until it is, Zone 1 of this Manual (15 m from FTL) and Zone 2 apply to every talab and Kandi pond, and clause 7.12(b) applies to every lake.
- Srinagar Master Plan 2035, Tables 8-2 and 8-3 and §8.2.3. The buffers round Dal (50 m from Dalgate to Nehru Park and 100 m from Nehru Park to Nishat, from the lake edge), the Telbal Nallah (50 m), the Nallah Amir Khan and other feeder nallahs (20 m), Anchar (200 m and 30 m), Hokersar (200 m and 50 m), Khushalsar and Gilsar (50 m), the Nambal Narkur (100 m), the Sind Nallah (50 m), the Doodhganga (20 m) and other small water bodies (20 m), and 100 m round any unlisted wetland reserve, measured from the edge of the water body; they govern as Zone 1 where wider.
- Jammu Master Plan 2032, §7.3.3. 50 m along the Tawi, the Devak and the Basantar (30 m in built-up areas), 15 m along the Balol, Thather and Bhalwal khads and 5 m along other water bodies, from Full Tank Level. For a river or khad this Manual reads Full Tank Level as its top of bank, and for a talab or lake as its FTL under Clause 7.2 (a reading set by this Manual). Where UBBL-2021 apply, the plan's 15 m and 5 m khad lines and its 30 m built-up line on the rivers are narrower than the 50 m that clause 7.12(b) gives "any other river/khad", and the head of that clause applies the larger, "whichever is more"; this Manual reads the narrower plan lines as overridden there (a reading of this Manual, to be confirmed by H&UDD), and the Applicant states both on Form 7-1.
- The High Court. No construction within 200 m of the periphery of Dal (PIL 159/2002, order of 19 July 2002, as quoted; reported to be kept by the judgment of 30 October 2025, which was not read); 200 m round Nigeen, as applied by LAWDA (2021, as quoted); 200 m round Wular (November 2020, as reported; the order was not read); the original width of the Jhelum to be restored and no construction near the water bodies (orders of 24 February 2015 and 10 June 2016, as quoted in the order of 29 May 2024 in PIL 8/2017). Where the Court's line is wider than Zone 1 and Zone 2 it governs for the uses it restricts; its status is stated on Form 7-1.
- Wetlands, Ramsar sites and reserves. The Ramsar sites of Wular (18,900 ha), Hokersar (1,375 ha), Surinsar–Mansar (350 ha), Hygam (802 ha) and Shallabugh (1,675 ha), to their boundaries; the seven Wildlife Conservation Reserves of 1945; and any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was found notified) (Clause 7.12).
- I&FC. Its control of the bed and banks of every water source, city channel and flood spill channel and of the embankments, its permission for building near an irrigation or hydraulic work, and its NOC under S.O. 304 (Water Resources Act, 2010, sections 66 and 81 [TBC]).
This Manual sets 15 m as the floor because the waterbodies that no statutory line reaches, the springs, talabs, Kandi ponds and the drains and channels of the towns, still need room for their flood flow and for the machinery that clears them, and because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled. The reasons for the corridor are the record: in 2014, 262 km², 34% of the Srinagar planning area, was under water, and the city's growth after 1971 had gone "mostly in low lying areas, wetlands and flood absorption basins adjacent to Flood Spill Channel" (Srinagar Master Plan 2035); the Jammu Master Plan 2032 records that "The drainage channels have fallen prey to the accelerated urban growth for there has been no standardized regulations provided in the Master Plan-2021 to regulate development in their vicinity"; and Hokersar, Narkara and Wular have each lost a large part of their area (as reported; Clause 7.12, Commentary). Until a statute, rule, notification, master plan or court adopts it, the 15 m minimum is this Manual's recommended standard, and the statutory, plan, court and Tribunal lines above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Jammu and Kashmir Unified Building Bye-Laws 2021, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to valley and hill-town practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The floor of the Kashmir valley round Srinagar, Pampore, Sopore, Baramulla and Anantnag, the margins of its lakes and nambals, and the Sirowal of the Jammu plains, which falls at 1 in 250 to 1 in 300 (CGWB), are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
In Jammu and Kashmir the lines round lakes are measured from the lake's edge or fringe (UBBL-2021, clause 7.12(b); Srinagar Master Plan 2035) or from Full Tank Level (Jammu Master Plan 2032), and none of them says at what level or on what date the edge is taken, so the line from which a setback is measured must come from this Manual. The difference matters because the valley's lakes and nambals have been shrinking for a century, and the edge on the day of survey is the edge after the loss: Hokersar is reported to have shrunk from 18.75 km² in 1969 to about 13 km² in 2008, losing "nearly half of its flood storage capacity", with "60% of the Hokersar wetland … under heavy siltation"; Wular from 157.74 km² in 1911 to 86.71 km² in 2007 (or from 217 km² with its marshes, by another count), with about 30 per cent of its volume lost to silt; and 37 per cent of Narkara has been built over (all as reported). The areas also differ between authorities: Wular is 18,900 ha as a Ramsar site and 13,000 ha in WUCMA's account, and Hygam 802 ha as a Ramsar site and 7.62 km² in the Wildlife Department's. The lakes rise in another way too: when the Jhelum rises, Dal Gate closes and the lakes and nambals behind it fill from their own catchments, so their highest levels come with the river's floods and with the snowmelt of spring, not with the edge seen in the dry months. This Manual therefore gives every lake, nambal and talab a boundary measured from a high level, not from the water's edge on the day of survey: the larger of the Revenue boundary, the surveyed FTL, the Ramsar or other designated boundary, and the seasonal high edge (definitions after Clause 7.2), with the foreshore up to MWL as its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Srinagar, whose growth after 1971 went "mostly in low lying areas, wetlands and flood absorption basins adjacent to Flood Spill Channel" (Srinagar Master Plan 2035, Preface) and 262 km² of whose planning area, 34%, was under water in 2014, of the old towns of Anantnag, Pampore, Sopore and Baramulla along the embanked Jhelum, and of the colonies along the khads and the Tawi in Jammu that were flooded in August 2025 (as reported) already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Jammu and Kashmir has no tank Act, and its storages range from the Kandi ponds of the Jammu plains to Wular, the Kashmir valley's flood basin. The storages that matter for urban drainage are of six kinds. The first is the gated lakes of Srinagar: Dal, of 20.37 km² in a catchment of about 314 km², "about twenty times more than the lake area", fed by the Telbal (Dachigam) Nallah, the Mearkh Shah Nallah, the Bota Koul, the Pishpow Nallah and springs in its bed, with its outlets at Dal Gate, a lock and weir to the Tsunth Kol and the Jhelum, and the Nallah Amir Khan, through Nigeen to Gilsar, Khushalsar and Anchar (JKPCC, 2024; Forest Department, 2024); Brari Nambal, whose main outlet, the Mar Canal, was filled in the 1970s (as reported). Dal's level was reported at "10.5 feet" in September 2025, with releases possible only "to the extent of two to three feet" because of silt (as reported); that reading has no stated datum and is not used as a level. The second is the nambals and flood basins downstream of the city's outfalls and along the Jhelum: Anchar (14.73 km², as reported), Hokersar (1,375 ha, Ramsar), Narkara, Shallabugh (1,675 ha, Ramsar), Rakh-e-Arth and the west-bank basins, and Wular, "a huge absorption basin for flood water" (WUCMA, 2024), whose outlet at Ningli is reported to pass 20,000 cusecs before and 22,700 cusecs after the works since 2014 and whose danger level is reported as 1,578 m (I&FC, as reported). No flood-storage volume was found for Wular, Hokersar, Anchar, Narkara, Rakh-e-Arth or Dal–Nigeen. Their storage is modelled at basin scale (Clause 7.12.5) and is never counted for a development. The third is the reservoirs and barrage ponds: Salal (full reservoir level 487.68 m, NHPC), Baglihar (840 m, JKSPDC), Dul Hasti, Ratle and Pakal Dul on the Chenab system, the Tawi barrage at Jammu, whose first phase was dedicated on 14 April 2026 and whose pool level and gates were not found [TBC], and the Ranjit Sagar reservoir on the Ravi, held in Punjab, which matters for Basohli and Kathua, whose full reservoir level is reported as 527.91 m and elsewhere as 527.13 m (the higher is used until the operator confirms it) (all as reported); their releases enter a design as inflow and tailwater (Clauses 5.8.3 and 5.8.5(d)), and they are not tanks for these clauses unless their storage is counted. The fourth is the talabs and Kandi ponds of the Jammu plains: 365 ponds in the Kandi belt, 249 in Jammu district and 116 in Kathua, 165 of them perennial (CGWB), and the talabs of old Jammu, Rani Talab, Talab Khatikan, Talab Tillo, Kujwani Talab, Bawa Talab and Bana Talab, which survive mostly as place names (Jammu Master Plan 2032); they are modelled as existing features where they intercept runoff but are not counted as storage unless Clause 7.7.1 is met, because none was found surveyed or with a controlled outlet. The fifth is the springs, nag and cashma, which are protected for their water and never counted as storage. The sixth is the smaller lakes in small catchments, Manasbal in Kashmir and Mansar and Surinsar in the Jammu hills (a Ramsar site of 350 ha), whose outlets are unrecorded [TBC], and the glacial and moraine-dammed lakes of the high mountains, which are hazards (definitions after Clause 7.2). These are the waterbodies for which Figure 7.3 and Clause 7.8 matter: on the valley floor every drain ends in a lake, a nambal, a city channel or the river, and the river shuts them all when it rises; in the Jammu plains every khad crosses the Kandi to the Sirowal, with its ponds and talabs on the way. Any lake, talab or reservoir whose storage is to be counted is subject to Clause 7.7.1 in full, with I&FC, LCMA, WUCMA, the dam operator or other custodian, and the custodian of each waterbody shall be confirmed for the inventory (Annex 7A) [TBC].
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. I&FC, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, on the Kashmir valley floor, every drain and dewatering station that discharges to a lake or nambal, the lake's gated outlet, the nambals and flood basins downstream, the flood spill channel, and the embanked river whose stage shuts the outfalls (Clause 5.8.5(a) and (e)), and, in the Jammu plains, every khad from the foot of the Siwalik hills across the Kandi and the spring line to the Sirowal, with any talab or Kandi pond on it, down to its confluence with the river (Clause 5.8.5(b) and (c)), as shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than I&FC's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. In Jammu and Kashmir the waterbodies are fullest when the storms come. On the Kashmir valley floor the water table is at its shallowest in May, after the winter rain and the snowmelt (CGWB), and the lakes and nambals behind the Jhelum fill whenever the river rises and Dal Gate and the other outlets close; in August 2025 Wular stood at 1,575.66 m against its danger level of 1,578 m (I&FC, as reported). In the Jammu division the Kandi ponds, 165 of which hold water all year (CGWB), and the reservoirs fill in the monsoon: the Ranjit Sagar reservoir on the Ravi reached its full level on 27 August 2025 and its outflow rose from about 9,000 to 173,000 cusecs between 24 and 27 August (as reported), and Salal's and Baglihar's gates were all open in August 2025 (Clause 7.8, Commentary). The largest floods of both divisions came in September (1988, 1992 and 2014), when monsoon moisture met a western disturbance, after weeks of rain or snowmelt, so a late storm finds the lakes, ponds and reservoirs high. While a lake or talab is full, or its outlet is shut by the river, it stores nothing more below FTL, the drains and khads that flow into it discharge against its level, and any release adds to the flow in the river below it. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A valley-floor town behind the river and a Jammu Kandi town: lakes, nambals, khads and talabs (schematic, not to scale; no particular town, lake or landmark is shown). A: on the Kashmir valley floor the town stands behind the river's flood embankment, on alluvium, Gurti clay and Nambal peat with the water table within 2 m of the ground, where no soakaway, recharge pit or exfiltrating paving is built (Clause 8.8.1, item (i)). Its drains run to a gravity outfall through the embankment, with a flap gate that shuts when the river rises, and to a pumping station that lifts the water over the bund when the gate is shut; the outfall is designed for the river stage and the lock duration of Clauses 5.8.5(a) and 5.10, not for the storm alone. Part of the town drains to a lake through sediment traps and dry-weather-flow interceptors with screens (Clauses 7.10.6 and 8.9); the lake leaves through a gated outlet to the river, which the river's rise also shuts, and through a channel to a nambal downstream, which is kept as the town's flood storage and is not drained, bypassed or filled (Clause 7.12). A flood spill channel takes the river's flood flow past the town, and outfalls to it count as river outfalls. Zone 1 and Zone 2 are measured from the lake's and the nambal's boundary at their seasonal high (definitions after Clause 7.2), and the wider statutory, master-plan and court lines govern (Clause 7.4.5). B: in the Jammu plains the khads leave the Siwalik hills and cross the boulder-gravel Kandi fan, where the water lies deep and recharge of filtered roof water and treated runoff comes first (Clause 8.8.1, item (ii)), to the spring line, below which the khads gain water from the ground and the Sirowal is waterlogged, with flowing wells and no infiltration (item (i)). A talab on the Kandi is kept with its clay bed (Clause 7.9) and spills to the khad. On the hill slope above, roof water goes to the storage of UBBL-2021 and its overflow and the road runoff go by lined drains through sediment traps to the khad, and no soakaway or soak pit is placed on the slope (item (iii)). Zone 1 along the khad is measured from the top of its boulder bed, and the 50 m of UBBL-2021, clause 7.12(b), for "any other river/khad" governs where the bye-laws apply; the khad's 1% AEP level, found with bulking, sets the flood edge from which Zone 2 is measured, and no land recorded as Gair Mumkin Khad is released before that study (definitions after Clause 7.2). The 15 m minimum, the valley-floor, Kandi and hill infiltration rules, the lake-outlet and nambal rules and the functional-khad study are this Manual's proposals; UBBL-2021, the master plans, the Water Resources Act, 2010 and the orders of the High Court govern where they say more. Original drawing for this Manual.
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, J&K SDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under I&FC control, the operating rule shall be I&FC's rule. This Manual does not authorise any other body to operate a I&FC tank.
Commentary. No lake, nambal or talab in Jammu and Kashmir was found with a written operating rule. Dal has the Union Territory's best-known control: the lock and weir at Dal Gate, whose gates, Grierson records, "remain open" when the Jhelum is low and "automatically close" when it rises to a certain height, "thus preventing inundation of the land round the lake"; its other outlet, the Nallah Amir Khan, carries water on to Nigeen, Gilsar, Khushalsar and Anchar. In September 2025 Dal's level was reported at "10.5 feet", with releases possible only "to the extent of two to three feet" because of silt (as reported, with no datum). Regulatory gates at Hokersar are part of the second phase of the Jhelum flood-management plan (as reported), and the Srinagar Master Plan 2035 proposes a "Supplementary Discharge Channel to drain out the overflow of Natural Flood Absorption Basin into Hokersar/Doodhganga". The reservoirs are run by their operators to rules that were not read for this Manual: Salal's gates are opened monthly in the monsoon to flush silt; all the spillways of Baglihar were opened on 1 August 2025 and all the gates of Salal on 12 August 2025; and since India placed the Indus Waters Treaty "in abeyance" in April 2025 such releases may no longer be announced in advance (all as reported). Without an agreed rule with dates, levels, release rates and a named operator, storage in a lake or reservoir cannot be relied on, and a release made without warning to the towns downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is refilled by the rain and snowmelt before the peak storm gives no protection when the peak storm comes. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
For a lake whose outlet the river can shut, Clause 7.8.3 is the governing condition, and a gate does not make a cushion: Dal Gate closes when the Jhelum rises, which is when the cushion would be needed. A design that relies on such a lake routes the storm with the outlet shut for the lock duration of Clause 5.10 (Clause 5.8.5(e)), starting from the lake's outlet level, or from a higher level where the custodian records one, and shows that the rise in the lake does not flood buildings on its shore; no drawdown before the storm is assumed unless the custodian has agreed it in writing under Clause 7.8.2. This rule is set by this Manual. For a talab or Kandi pond with no controllable outlet, no cushion is assumed, a design that relies on it routes the storm through it from its outlet level, and the outflow over the outlet is limited by the khad or nallah below it, which shall be shown to carry it with the debris of Clause 6.3.6. For a reservoir, a design takes the operator's level and release for the storm being checked (Clause 5.8.3), not a drawdown the operator has not agreed to in writing. Most lakes and nambals have other users: Dal and Nigeen carry about 910 houseboats (JKPCC, 2024), and about ten villages depend on Shallabugh (Forest Department, 2024), which is why Clause 7.8.2(d) requires the custodian to accept any drawdown.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Jammu and Kashmir Pollution Control Committee (JKPCC) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 May each year (Chapter 10).
Commentary. No Union Territory order fixing a date for the cleaning of drains, nallahs, lakes or talabs was found; the Jammu Municipal Corporation was reported to finish "the first phase" of its drain cleaning before the end of June, and the Srinagar Municipal Corporation ran a dewatering drive in January 2026 "triggered by recent snowfall and subsequent snowmelt" (both as reported). The waterbodies are losing their storage to silt: the flood spill channel of the Jhelum, built for 17,000 cusecs, carried 4,000 cusecs by 2014 "due to accumulation of sediment load from various nallahs which merge with the channel" (CAG Report No. 4 of 2016); the CAG found that the central cunnette and "Flood Threat to River Jhelum" schemes had excavated only 84% and 43% of their quantities, and later "a significant shortfall of targets in terms of dredging" in the first phase of the Jhelum flood-management plan (CAG, PMDP audit, 2021); 60% of Hokersar is reported under heavy siltation, Wular to have lost about 30 per cent of its volume to silt, and Dal's releases to be limited by silt (all as reported). The date of 31 May in this Manual is set by this Manual, before the monsoon's normal onset at Jammu of 28 June (IMD) and ahead of the early onset of 13 June 2021 (as reported); on the Kashmir valley floor the drains and inlets are also cleared of snow, ice and silt by 15 March, ahead of the western-disturbance maximum and the snowmelt of March and April, and cleared a second time by 15 August, ahead of the late-August and September storms; and hill towns clear debris again by 31 October (Chapter 10). Excavation to "increase capacity" is governed by Clause 7.9.3. Two cases need care in Jammu and Kashmir. On the valley floor the lakes and nambals lie in Gurti clay and Nambal peat (CGWB) over aquifers that are artesian in places (in Anantnag district almost every CGWB well drilled below 25 m flows), so deepening can cut through the layer that holds the lake's water or open a path from a polluted lake to a confined aquifer; and in the Kandi the ponds hold water only because of the clay in their beds, which checks "heavy seepage in the highly porous Kandi Belt" (CGWB, citing NIH), so deepening or desilting below that clay drains the pond. This Manual allows no lake or nambal bed in the valley to be deepened below its original bed except under Clause 7.9.3, and no Kandi pond's clay bed to be cut through or removed. Silt from a lake or nambal that receives sewage is tested before disposal (Clause 7.9.1(c)), because the lakes receive the drains of the city (Clause 8.9, Commentary). The 31 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Jammu and Kashmir precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Jammu and Kashmir the drains of a town are understood to vest in its municipal body, under Municipal Acts whose drainage sections were not read for this Manual [TBC]; in Srinagar they are planned and built by UEED and run by the Town Drainage wings of SMC and of the Directorate of Urban Local Bodies Kashmir, and in Jammu by JMC and UEED's Sewerage and Drainage Division (West); while the rivers, nallahs, khads, embankments, city channels and flood spill channels lie with I&FC (Water Resources Act, 2010, section 81 [TBC]), the road drains with PW (R&B) and NHAI, Dal and Nigeen with LCMA and Wular with WUCMA. No rule or order dividing the natural channels from the municipal drains, or the local bodies' drains from the road drains, was found; Chapter 6 gives this Manual's working assignment. The channels have been lost in the ways this clause is written to prevent. Brari Nambal's main outlet, the Mar Canal, was filled in the 1970s (as reported); the Padshahi Canal, which ran from the Sindh at Ganderbal through Rangpora and Malbagh to Lal Bazar, was encroached (PIL 2/2014), and the High Court directed in April 2015 that the Padshahi Bagh Canal be restored (as recalled in its order of 29 May 2024); the Nallah Amir Khan, Dal's outlet towards Khushalsar and Anchar, is to be revived (Srinagar Master Plan 2035, §14.4.4.2); and the flood spill channel silted to a quarter of its design capacity by 2014 (CAG). In Jammu, "The drainage channels have fallen prey to the accelerated urban growth" (Jammu Master Plan 2032, chapter 1); the roadside drains serve as the storm drains, and only 20% of the roads have side drains, covering about 40% of the city (§5.1.3); the plan calls for "Carrying out EIA before training and covering the drainage channels" (§7.3.2); and it proposes to release for development the land along the khads recorded as Gair Mumkin Khad once the "true Khad" has been fixed with I&FC (§12.2.3), which is land that Clause 7.4 and the functional-khad rule (definitions after Clause 7.2) protect. UBBL-2021 give the watercourses wide lines (clause 7.12(b)) and require that "These restricted development zones and other water courses, which pass through a land shall be developed and maintained according to the discharge of water" (clause 7.12(d)), and the Water Resources Act, 2010 lets I&FC prohibit and remove obstructions (sections 52, 53 and 67 [TBC]); neither keeps a channel at its recorded width once it has been lined, piped, covered or filled, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored talab or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Jammu and Kashmir no shared form of storage is required by the building rules: chapter 10 of UBBL-2021 requires rainwater harvesting with no storage volume (only the descriptive "55,000 litres per 100 sq. m. area per Year from rooftops"), and the bye-laws have no detention, peak-flow or "zero runoff" rule. The Srinagar Master Plan 2035 describes "source controls" that "store and slowly release stormwater … (detention) or dispose of stormwater onsite (retention)" and a "stormwater performance standard" of 100% coverage and no waterlogging, with no volume, return period or release rate (§13.3); it proposes the Lelhar–Lasjan floodplain as a "Protected Natural Flood Absorption Basin" and a supplementary discharge channel into Hokersar and the Doodhganga, which are regional flood works, not storage for developments. The Jammu Master Plan 2032 proposes check dams to "harvest rain water in small ponds" and the revival of village talabs for recharge (§§7.3.2 and 8). On the Kashmir valley floor a regional facility cannot infiltrate (Clause 8.8.1): it is storage behind a gated or pumped outfall, and its volume is needed for the outfall-closed case of Clause 5.10. A nambal or flood basin is never sold as storage to a development (Clause 7.12.5). In the Jammu Kandi a restored talab or Kandi pond can recharge the aquifer, as the plan intends. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Jammu and Kashmir Wetland Authority;
- (b) the Union Territory's five Ramsar sites, Wular Lake (18,900 ha; designated on 23 March 1990), Surinsar–Mansar Lakes (350 ha; 8 November 2005), Hokera (Hokersar) Wetland (1,375 ha; 8 November 2005), Hygam Wetland Conservation Reserve (802 ha; 8 June 2022) and Shallabugh Wetland Conservation Reserve (1,675 ha; 8 June 2022), to their Ramsar boundaries, and any wetland notified under the 2017 Rules;
- (c) the seven Wildlife Conservation Reserves of Order No. 710-C of 17 July 1945, Hokersar, Shallabugh, Hygam, Freshkoori, Kranchoo, Chatlam and Manibugh, and the wetland reserves of the Srinagar Master Plan 2035 (Table 8-4);
- (d) the lakes, nambals and flood basins of the Kashmir valley, such as Dal, Nigeen, Brari Nambal, Gilsar, Khushalsar, Anchar, the Shalbug Nambal and the Haran forest, Narkara (Nambal Narkur), Mirgund, Rakh-e-Arth, the Pampore lagoons, Manasbal and the Wular marshes, the wetlands of the national atlas, and the wet margins, springs and seeps of the valley and the hills, within the 1% AEP extent of Clause 7.3.4 (a river, lake or reservoir itself is also a waterbody under the rest of this chapter); and
- (e) any other nambal, marsh or wetland that the Authority notifies, that the wetland authority lists, that is listed before the National Green Tribunal (such as the 27 wetlands of more than 1 ha outside forests listed in 2026), or that the High Court of Jammu & Kashmir and Ladakh or the National Green Tribunal directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Jammu and Kashmir's wetlands are the concern of the Jammu and Kashmir Wetland Authority, constituted under the Wetlands (Conservation and Management) Rules, 2017 by a notification of 25 November 2020 of the Forest, Ecology and Environment Department (its number is uncertain in the copy read), which met on 31 March 2021 and 3 August 2022, considered Dal–Nigeen and Wular, and "approved … for Notification" the Brief Document of Wular, with its integrated management plan; a wetland management cell was proposed in the Department of Ecology, Environment and Remote Sensing. No wetland had been notified under rule 4 of the 2017 Rules as of September 2024 (Forest Department report of 9 September 2024 in NGT O.A. 239/2024), and a plan of 2021 to declare Wular, Dal, Nigeen, Sanasar, Manasbal and Purmandal "Protected Wetlands" was reported, not confirmed. The Union Territory has five Ramsar sites: Wular Lake (designated on 23 March 1990; 18,900 ha), Surinsar–Mansar Lakes (8 November 2005; 350 ha), Hokera (Hokersar) Wetland (8 November 2005; 1,375 ha), Hygam Wetland Conservation Reserve (8 June 2022; 802 ha) and Shallabugh Wetland Conservation Reserve (8 June 2022; 1,675 ha) (Ministry of Environment, Forest and Climate Change, list of 31 January 2024); WUCMA gives Wular as 13,000 ha and the Wildlife Department Hygam as 7.62 km², and this Manual uses the Ramsar figures. Seven wetlands, Hokersar, Shallabugh, Hygam, Freshkoori, Kranchoo, Chatlam and Manibugh, are Wildlife Conservation Reserves, first notified as game reserves and State rakhs by Order No. 710-C of 17 July 1945 under the Game Preservation Act of 1942, and now under the Wildlife (Protection) Act, 1972, which applies to the Union Territory from 31 October 2019 (Wildlife Department, 27 July 2024). "In the Kashmir Valley alone, wetlands occupy an area of nearly 42,661 hectares comprising of 755 small and large water bodies" (as quoted in the National Green Tribunal's order). The wetlands that matter to drainage are the nambals and flood basins that receive the city's outfalls and the river's floods: Hokersar, fed by the Doodhganga and the Sukhnag "on the flood plain of River Jhelum" about 10 km west of Srinagar, with depths of 0.75 to 2.50 m (Forest Department), is reported to have shrunk from 18.75 km² to about 13 km² and to have "lost nearly half of its flood storage capacity"; Wular from 157.74 km² in 1911 to 86.71 km² in 2007; Narkara to be 37 per cent built over; and the valley's wetlands as a whole to have declined by about 25% between 1990 and 2020 while built-up land increased by about 1,500% (all as reported). No flood-storage volume was found for any of them. In Jammu the National Green Tribunal was told in 2026 of 27 wetlands of more than 1 ha outside forests, 10 in Jammu district, 9 in Samba, 6 in Kupwara and one each in Kathua and Baramulla, and that all three samples from the Jammu wetlands failed water-quality Class B (order of 13 November 2026 in O.A. 239/2024, as reported). A drain outfall, desilting, diversion or gate operation in or near a Ramsar site, a Wildlife Conservation Reserve or a notified wetland therefore needs the views or permission of the Wetland Authority or the Wildlife Department where the Rules or the Wildlife (Protection) Act, 1972 reach it, the consent of LCMA or WUCMA at Dal–Nigeen and Wular, and compliance with this chapter; for the nambals, talabs, springs and wet margins they do not reach, this chapter, the bye-laws and the master-plan buffers are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Jammu and Kashmir's lakes, nambals and rivers through the drains (Clause 8.9, Commentary): "Untreated sewage gets entry into the Dal Lake from areas like Telbal, Lalbazar etc." (JKPCC, 2024), the samples of December 2025 were reported to flag the outfalls of the Habak and Hazratbal treatment plants on Dal (as reported), and all three samples from the Jammu wetlands before the National Green Tribunal in 2026 failed water-quality Class B (as reported). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Jammu and Kashmir they apply in full to every new outfall, and every existing outfall to a lake, nambal, wetland, talab, reservoir or river that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed; every outfall to Dal, Nigeen, Anchar or Wular, and to any other lake, nambal or Wildlife Conservation Reserve, carries a DWF interceptor and a screen whether or not DWF has yet been measured in it (Clause 8.9, Commentary). Every drain that enters a lake, nambal or talab also passes a sediment trap first (Figure 7.3), because the lake is the end of its catchment's drainage and has no other way to lose the silt. The flood-absorption marshes downstream of Srinagar's outfalls, Hokersar, Narkara, Shallabugh, Rakh-e-Arth and Anchar, are part of the city's drainage: no drain, channel or pumped outfall whose catchment now drains to one of them shall be designed to bypass it, none shall discharge to it without the sediment trap and interception above, and no drain shall be designed to lower its level (Clause 7.12.2); this rule is set by this Manual.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Jammu and Kashmir's main controls on building in its rivers, lakes and marshes are the bye-laws, the master plans and the courts, and the High Court has done most of the work. In the public interest litigation that followed the floods of 2014 (PIL 8/2017 with PIL 2/2014 and PIL 18/2018, Environmental Policy Group v. Union of India) it held on 24 November 2014 that "A duty is cast upon the Chief Engineer and other statutory authorities to ensure removal of all encroachments from the banks of River Jhelum along its entire course"; directed on 24 February 2015 that a committee under the Divisional Commissioner ensure "that the original width of the river Jhelum is restored", and that "Since, the Court is Custodia Legis of river Jhelum and other water bodies, no Court or Tribunal shall consider any suit/ application / appeal" on them; recorded on 7 April 2015 that the actual width had not been demarcated; directed the Deputy Commissioners in 2016 "to ensure that no construction of any kind is raised near the water bodies within their territorial jurisdiction"; and ordered in 2017 the demarcation of the wetland reserves "as concomitant steps towards the main aim of preventing floods" (all as quoted in its order of 29 May 2024, which asked for affidavits of compliance on the encroachments removed from the Jhelum). In September 2025 the Court was reported to have named "Rakh Arth, Transworld University, and IIM Srinagar" as encroachments that could aggravate flood vulnerability (as reported; not read). For Dal the Court has held a 200 m no-construction line since 2002, and for Wular it was reported in November 2020 to have barred construction within 200 m and ordered encroachments removed (Clause 7.4, Disclosure). WUCMA reports encroachment on Wular and land retrieved from it, but its figures are internally inconsistent and are not cited here. The National Green Tribunal, in O.A. 239/2024 on the Kashmir wetlands, found on 13 November 2026 that the wetland areas reported from the Revenue records for 27 wetlands of more than 1 ha outside forests were "insufficient", asked for the existing area on the ground, and was told that a recorded rakh in Baramulla was "not existing on the spot" and used for paddy (as reported); 37 per cent of Narkara is reported built over. The Water Resources Act, 2010 states a policy of "complete ban on encroachment on water bodies, wetlands, water courses" (section 4) and lets I&FC prohibit and remove obstructions and encroachments (sections 52, 53 and 67), with offences for building that changes the flow of a water source (section 168) (section numbers [TBC]); and the CAG found a 1,641 m drainage channel in a wetland stopped for want of the wetland authority's no-objection certificate (CAG Report No. 4 of 2016). In Jammu the master plan records that developed colonies on land recorded as Gair Mumkin Khad, such as Trikuta Nagar, Sainik Colony, Sunjwan, Bhatandi and Roopnagar, "would fall under the category of illegal development" under that classification, and proposes to resolve it by fixing the "true Khad" with I&FC (Jammu Master Plan 2032, §12.2.3); this Manual requires that study to be hydraulic (definitions after Clause 7.2). This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 31 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The lakes and nambals of the Kashmir valley are natural waterbodies, not held by tank bunds, though their outlets are regulated by gates, locks and weirs such as Dal Gate; the Jhelum's flood embankments, which hold the river away from Srinagar and the other valley towns, are flood embankments and so outside the Act's definition of a dam; and the Kandi ponds and village talabs are too low to be specified dams. Each outlet work, gate or bund shall still be screened under Clause 7.14.1. The dams of the Chenab and its tributaries, such as Salal, Baglihar, Dul Hasti, Ratle and Pakal Dul (a 167 m concrete-faced rockfill dam, NHPC), are specified dams under the Act, and the Tawi barrage at Jammu shall be screened when its levels and gates are known [TBC]. Where the storage of a lake, talab or reservoir is counted under Clause 7.7, its bund, outlet works or dam is a tank bund for Clause 7.14.2 unless the Act applies. A glacial or moraine-dammed lake is never counted as storage, but where it lies upstream of a town, its breach path is mapped as a hazard (definitions after Clause 7.2; Chapter 5). Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Jammu and Kashmir the embankments that matter most to the towns are the Jhelum's flood embankments through the Kashmir valley, and they have failed: in September 2014 the river breached them, and the floodwater stood up to 16 feet deep, for up to 25 days (Malik, 2021), over 262 km² of the Srinagar planning area (Srinagar Master Plan 2035); the CAG found that the flood spill channel had silted from its design capacity of 17,000 cusecs to 4,000, and that, had two earlier flood schemes been carried out as approved, "the impact of the floods of September 2014 may have been mitigated" (CAG Report No. 4 of 2016). The locations of the 2014 breaches were not found for this Manual. The Water Resources Act, 2010 bars any building, railing or platform on the slopes of an embankment and makes it an offence (sections 81(4) and 168 [TBC]). On the Chenab, the reservoirs of Salal and Baglihar opened all their gates and spillways in August 2025, and their gate operations may now be unannounced (as reported; Clause 7.8, Commentary). In the high mountains, glacial lakes and landslide dams are hazards for which no inventory or breach study in the Union Territory was read. No breach map or emergency action plan for an embankment, a lake gate, a barrage or a reservoir was read for this Manual. A failed or overtopped bund floods the town below it, a breach of the Jhelum's embankments floods the city behind them for weeks, and an unannounced release floods the towns below a dam, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments; for the Jhelum's own embankments, a breach is the residual risk of Chapter 5, mapped and warned for, not a design case. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Government of Jammu and Kashmir. Jammu and Kashmir Unified Building Bye-Laws, 2021, J&K Official Gazette, Extraordinary, Vol. 134, No. 39-4, Part III, 24 December 2021 (Jammu Municipal Corporation copy), clauses 1.1, 2.1, 2.6(b)(xi), 2.18, 5.2.5, 6.20 and 7.12, the use-zone notes and chapter 10, https://huddobps.jk.gov.in/JMCUBYL.pdf ; amendments published by the Jammu Municipal Corporation (J&K Official Gazette, Vol. 134, No. 49-3, 9 March 2022), https://jmc.jk.gov.in/adminjmcpanel/noticefiles/2142022372181344.pdf ; Housing and Urban Development Department, S.O. 304 of 1 December 2025 (online scrutiny, NOCs and negative lists), https://obps.jk.gov.in/BPAMSClient/seConfigFiles/Downloads/SO%20304%20DT%2001.12.2025.pdf ; S.O. 58 of 26 February 2026 (seen only as a title); the original notification of the bye-laws was not found [TBC].
- Town Planning Organisation Kashmir (2019). Srinagar Master Plan 2035 (notified by SRO 160 of 7 March 2019, seen only as quoted), §§4.2, 8.2–8.4 (Tables 8-2 to 8-4), 13.3 and 14.4.4.2, https://huddobps.jk.gov.in/Srinagar_Master_Plan_2035.pdf
- Jammu Development Authority. Jammu Master Plan 2032 (notified by SRO 90 of 3 March 2017, as amended; seen only as quoted), §§2.4, 5.1.3, 7.3.2, 7.3.3, 8, 11.1 and 12.2.3, https://huddobps.jk.gov.in/JMP2032.pdf
- Government of Jammu and Kashmir. Jammu and Kashmir Water Resources (Regulation and Management) Act, 2010 (Act XXI of 2010), sections 2, 4, 52–54, 66, 67, 73, 75–81 and 168, read in a copy without section numbers; the numbers are from a title index and are to be confirmed against an official copy [TBC], https://www.latestlaws.com/mobile/app/bare-acts/49934 ; section index, https://lawgist.in/states/jammu-and-kashmir/jammu-and-kashmir-water-resources-regulation-and-management-act-2010/4
- Government of Jammu and Kashmir. Jammu and Kashmir Flood Plain Zones (Regulation and Development) Act, 2005 (Act XVII of 2005), sections 1–4 (no commencement notification found), https://indianemployees.com/acts-rules/details/jammu-and-kashmir-flood-plain-zones-regulation-and-development-act-2005
- Government of India. Jammu and Kashmir Reorganisation Act, 2019 (No. 34 of 2019), Fifth Schedule, Table 4 (State Acts continued), https://faolex.fao.org/docs/pdf/IND227546.pdf
- Forest, Ecology and Environment Department, Government of Jammu and Kashmir. Report of 9 September 2024 in NGT O.A. 239/2024 (Kashmir wetlands), with the replies of the Wildlife Department (27 July 2024) and WUCMA (the Wetland Authority of 25 November 2020; the Wildlife Conservation Reserves of Order No. 710-C of 17 July 1945), https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20FOREST%20DEPTT.%20JAMMU%20&%20KASHMIR%20IN%20OA%20239%20OF%202024%20IN%20News%20item%20titled%20What%20Challenge%20Are%20Kashmiri%20Wetlands%20Facing.pdf
- Jammu and Kashmir Pollution Control Committee. Response of 14 August 2024 in NGT O.A. 504/2024 (Dal Lake: catchment, outlets, treatment plants, houseboats), https://www.greentribunal.gov.in/sites/default/files/news_updates/Report%20by%20JKPCC%20in%20OA%20No.%20504%20of%202024%20(NEWS%20ITEM%20TITLED%20THE%20DROWING%20JEWEL%20-%20TAPESTRY%20OF%20DAL%20LAKE,S%20DECLINE%20AND%20FISHING%20COMMUNITY,S%20STRUGGLE%20IN%20KASHMIR.pdf
- Ministry of Environment, Forest and Climate Change. 80 Ramsar sites of India (31 January 2024), https://moef.gov.in/uploads/2024/03/80-Ramsar-sites-of-India-31-01-2024.pdf
- High Court of Jammu & Kashmir and Ladakh. PIL 8/2017 with PIL 2/2014 and PIL 18/2018, Environmental Policy Group v. Union of India, order of 29 May 2024 (quoting the orders of 24 November 2014, 24 February 2015, 7 April 2015, 10 June 2016 and 2017), https://livelaw.in/pdf_upload/pil-8-of-2017-544110.pdf ; PIL 159/2002, Syed Iqbal Tahir Geelani v. State (Dal), order of 19 July 2002 (seen only as quoted), orders of 8 September 2022 and 13 June 2023 (as reported) and judgment of 30 October 2025 (not read).
- Comptroller and Auditor General of India. Report No. 4 of 2016: Performance Audit of Disaster Management in the State of Jammu and Kashmir (§§2.1.4 and 5.1), https://cag.gov.in/webroot/uploads/download_audit_report/2017/Report_No.4_of_2016_-_Performance_Audit_of_Disaster_Management_in_the_State_of_Jammu_and_Kashmir_Government_of_Jammu_and_Kashmir.pdf ; and the audit of the Prime Minister's Development Package for the year ended 31 March 2019, chapter VI, https://cag.gov.in/uploads/download_audit_report/2021/chap_6-061af2ebc7e35d9.21045816.pdf
- Central Ground Water Board. Aquifer mapping (NAQUIM) reports for the Kashmir valley (March 2017) and the outer plains of the Jammu province (Kandi and Sirowal; the 365 Kandi ponds); Ground Water Year Book, Jammu and Kashmir, 2021–22; district booklet, Srinagar (Chapter 8 references).
- SANDRP. "2022 CWC flood monitoring sites in North India" (5 August 2022) and posts on the highest flood levels of August–September 2025 (secondary; CWC levels as transcribed). https://sandrp.in/
- Malik (2021), on the floods of September 2014 in the Kashmir valley. Natural Hazards 110(3): 1911–1929 (full citation to be confirmed [TBC]). https://pmc.ncbi.nlm.nih.gov/articles/PMC8424175
- India Meteorological Department. New normal dates of onset and withdrawal of the south-west monsoon (2020), https://mausam.imd.gov.in/backend/assets/press_release_pdf/IMD_Press_release_new_onset_and_withdrawal_dates%28Final%29.pdf
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- National Green Tribunal. O.A. 239/2024 with O.A. 237/2026 (Kashmir wetlands), order of 13 November 2026 (27 wetlands of more than 1 ha outside forests; areas from Revenue records "insufficient"), as reported by the Daily Excelsior, 14 November 2026, https://www.dailyexcelsior.com/ngt-finds-major-gaps-in-assessment-seeks-actual-ground-status-of-27-wetlands-in-jk/ ; O.A. 190/2025 (Brari Nambal; CPCB reply seen only as quoted).
- Reports of the High Court's orders on Wular (November 2020) and on Rakh-e-Arth (September 2025), secondary, the orders not read: Kashmir Reader, 6 November 2020, https://kashmirreader.com/2020/11/06/hc-bans-construction-orders-removal-of-encroachment-within-200-metres-of-wular-lake/ ; and of the order of 13 June 2023 on the Dal buffers, Greater Kashmir, https://www.greaterkashmir.com/article/proceed-for-modification-of-master-plan-2035-on-dal-buffer-zones-hc-to-govt/22397
- Reports of the lakes and wetlands (secondary): the renaming of LAWDA as LCMA (3 November 2021), https://www.knskashmir.com/govt-renames-lawda-as-lcma-under-jandk-development-act-100923 ; the "Protected Wetlands" plan (Kashmir Reader, 1 April 2021), https://kashmirreader.com/2021/04/01/wular-dal-nigeen-sanasar-manasbal-lakes-and-purmandal-to-be-declared-as-protected-wetlands/ ; the shrinkage of Hokersar, Wular and Narkara, the level of Dal in September 2025, the Mar Canal at Brari Nambal, and the Wular danger level and outlet capacity (I&FC, as reported; RTI reply reported by Kashmir Life, 9 July 2024, https://kashmirlife.net/jhelum-river-capacity-boosted-across-kashmir-post-2014-floods-rti-359880/).
- Reports of reservoir operation in 2025 (secondary): the Baglihar spillways (1 August 2025), the Salal gates (12 August 2025), the Ranjit Sagar reservoir (24–27 August 2025) and the Indus Waters Treaty placed "in abeyance" (April 2025); the dedication of the Tawi barrage at Jammu (14 April 2026).
- Grierson, G. A. (1916–1932). A Dictionary of the Kashmiri Language. Bibliotheca Indica 229. Calcutta: Asiatic Society of Bengal; and Platts, J. T. (1884). A Dictionary of Urdu, Classical Hindi, and English. London: W. H. Allen; both online at the Digital South Asia Library, University of Chicago. https://dsal.uchicago.edu/dictionaries/grierson ; https://dsal.uchicago.edu/dictionaries/platts
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Kashmiri and Urdu waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. Jammu and Kashmir has no Act for the protection of lakes, tanks, ponds or springs as such, but it has statutes on water and on flood land, much of which has never been brought into use. The Jammu and Kashmir Unified Building Bye-Laws 2021 (UBBL-2021, as amended) apply to "all urban local bodies, urban development authorities and metropolitan regional development authorities" of the Union Territory, read with the master plans (clauses 1.1 and 2.1): they bar development "in area designated for water body, pond and Talav excluding River-front Development", keep development 50 m, 30 m or 20 m from the edge of the bank of rivers, khads, lakes, rivulets and canals and a green buffer 30 m from the highest water level along nallahs and rivers (clauses 7.12(b) and 5.2.5), leave the distance from a "talab, village tanks, lake, water bodies etc." to be prescribed by the building permit issuing authority (clause 7.12(c)), and defer building in flood areas to I&FC "or the flood zonation maps notified by the department from time to time" (clause 7.12(a)); no such map was found notified (Clause 7.4, Disclosure). The Srinagar Master Plan 2035 and the Jammu Master Plan 2032, made under the Jammu and Kashmir Development Act, 1970, add buffers round the lakes, wetlands, nallahs and khads, measured from the lake edge and from Full Tank Level. The Jammu and Kashmir Water Resources (Regulation and Management) Act, 2010 (Act XXI of 2010) defines a "water source" to include a "nallah, canal, spring, pond, lake" and "hydraulic works" to include "spring ponds, spring channels" and "zamindari khuls" (section 2), declares as State water policy a "complete ban on encroachment on water bodies, wetlands, water courses" (section 4), places "The control of the bed and banks of all water sources, navigation channels, intake channels, city channels and flood spill channels together with all works that affect the hydraulic conditions in the State" under the Irrigation and Flood Control Department (section 81), requires permission for any building "in the vicinity of any irrigation or hydraulic work" (section 66), and provides in Part VI for flood basins to be surveyed, delineated and declared by notification with "prohibitions and restrictions on the use of land" (sections 75 to 79); the section numbers were read from a title index, not from an official copy [TBC], and no flood basin was found declared. The Jammu and Kashmir Flood Plain Zones (Regulation and Development) Act, 2005 (Act XVII of 2005) provides for the zoning of flood plains river by river, but comes into force only "on such date as the Government may, by notification in the Government Gazette, appoint" (section 1(3)), and no such notification was found: it is not treated as in force, and no flood plain zone exists under it. Both Acts were continued for the Union Territory by the Fifth Schedule to the Jammu and Kashmir Reorganisation Act, 2019. The lakes of Srinagar are managed by the Jammu and Kashmir Lake Conservation and Management Authority (LCMA, formerly LAWDA, renamed in 2021, as reported), which gives a no-objection certificate for building permission (S.O. 304 of 1 December 2025), and Wular by the Wular Conservation and Management Authority (WUCMA, constituted in 2012 under the Development Act); the Kashmir wetland reserves are Wildlife Conservation Reserves under the Wildlife (Protection) Act, 1972; and the wetlands are the concern of the Jammu and Kashmir Wetland Authority, constituted on 25 November 2020 (Clause 7.12, Commentary). The Revenue Department records drainage land in Jammu largely as Gair Mumkin Khad, and marsh and grassland as nambal, rakh and kahcharai, under the Land Revenue Act, Svt. 1996 and the Kahcharai Act, Svt. 2011, whose texts were not read. The High Court of Jammu & Kashmir and Ladakh has acted as the regulator of last resort: it declared itself "Custodia Legis of river Jhelum and other water bodies" (order of 24 February 2015, as quoted in its order of 29 May 2024 in PIL 8/2017 with PIL 2/2014 and PIL 18/2018) and holds a 200 m no-construction line round Dal (Clause 7.4, Disclosure). In the towns, drains are understood to vest in the municipal bodies under the Jammu and Kashmir Municipal Corporation Act, 2000 and the Jammu and Kashmir Municipal Act, 2000, whose drainage sections were not read for this Manual [TBC]. In this chapter I&FC means the Irrigation and Flood Control wing of the Jal Shakti Department, which holds the rivers, nallahs and khads, the Jhelum's embankments, the flood spill channel and the city channels, and reads the river gauges in feet; LCMA, WUCMA, the Wildlife Department and the dam operators hold the lakes, wetlands and reservoirs named against them in Clause 7.3.1.
This Manual treats every recorded waterbody as drainage infrastructure. Four features set Jammu and Kashmir apart. The first is the lake and nambal system of the Kashmir valley: Srinagar stands in a chain of lakes and marshes that "have been acting as flood retention basins" (Srinagar Master Plan 2035, §4.2). Dal, of 20.37 km² in a catchment of about 314 km², drains through the lock and weir at Dal Gate to the Tsunth Kol and the Jhelum, and through the Nallah Amir Khan to Nigeen, Gilsar, Khushalsar and Anchar, which the Sindh Nallah also feeds; the nambals downstream of the city's outfalls, Hokersar, Narkara, Shallabugh, Rakh-e-Arth and Anchar, are its flood-absorption marshes, and they have been lost in part to silt and building (Clause 7.12, Commentary); and Wular is the valley's flood basin, "a huge absorption basin for flood water" (WUCMA, 2024), at the foot of the flood spill channel. The second is the embanked Jhelum: when it rises, Dal Gate closes, the gravity outfalls shut and the city drains only by its dewatering stations (Chapter 5), so a lake or nambal behind the river is a store that cannot empty. The third is the khad of the Jammu plains: the "more than 100 small and big dry khads which have flash floods during the rainy season" of the Jammu planning area (Jammu Master Plan 2032, §7.3.2), crossing the boulder-gravel Kandi to the spring line and the waterlogged Sirowal, with the 365 Kandi ponds of Jammu and Kathua and the talabs of old Jammu, most of them now lost. The fourth is the spring, the nag and the cashma of Kashmir, such as Kokernag, Verinag and Achabal, and the springs in Dal's own bed, with no rule that keeps building or drains away from them. Reservoirs on the Chenab, at Salal, Baglihar and Dul Hasti, and the new Tawi barrage at Jammu are run by their operators, and the glacial lakes of the high mountains are hazards. This chapter gives the design rules that protect the storage and conveyance of these waterbodies. It does not replace the bye-law, master-plan, water-resources, municipal, revenue, wildlife and wetland procedures that record and protect them in law, or the directions of the High Court of Jammu & Kashmir and Ladakh and the National Green Tribunal.