Chapter 8Water Quality and Recharge
8.1 Purpose and scope
8.1.1 This chapter sets the requirements for the quality of stormwater leaving a site or a public drainage system, and for groundwater recharge. It covers:
- (a) the water quality volume (WQv) and the water quality design flow;
- (b) the treatment train, and the selection and design of best management practices (BMPs);
- (c) the criteria for infiltration and recharge;
- (d) the exclusion of sewage and dry-weather flow from storm drains;
- (e) gross pollutant traps, first-flush treatment and screens at outfalls to waterbodies;
- (f) how rainwater harvesting (RWH) fits with retention and detention;
- (g) erosion and sediment control during construction; and
- (h) monitoring.
8.1.2 This chapter applies to every development and public work to which Chapter 4 applies (Chapter 1). Clauses 8.9 (sewage) and 8.12 (construction erosion and sediment control) apply to every development that needs a building permit or layout approval, and to every public drainage work, whatever its size.
8.1.3 Retention under Chapter 4 is the first and preferred form of water quality control. Runoff retained on site is treated in full. The rest of this chapter applies to the part of the WQv that is not retained.
8.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Water quality volume (WQv) | The runoff volume that must be retained or treated, from the water quality rainfall depth (Clause 8.4). |
| Water quality rainfall depth (P_wq) | The greater of the retention depth (Annex 2E, Clause 2.10) and the 24-hour 3-month ARI depth (Annex 8A). |
| 3-month ARI depth | The 24-hour rainfall depth equalled or exceeded on average four times a year, from a partial-duration series of the long-term daily record. |
| Water quality design flow (Q_wq) | The peak flow from the 3-month ARI storm, used to size flow-through devices and diversion structures (Clause 8.4.5). |
| Runoff coefficient for WQv (Rv) | The volumetric runoff coefficient for small storms, Rv = 0.05 + 0.009·I. |
| BMP | A best management practice: a structural or non-structural measure that reduces pollutant loads or runoff volume. |
| Treatment train | Two or more BMPs in series, from source to site to regional scale (Clause 8.5). |
| Pretreatment | A BMP that removes coarse sediment, litter and oil before runoff reaches a filter or infiltration BMP. |
| First flush | The early part of a runoff event, which usually carries the highest concentrations of sediment, litter and oil. |
| Gross pollutant trap (GPT) | A device that captures litter, plastics, vegetation and coarse sediment, typically above about 5 mm. |
| Dry-weather flow (DWF) | Flow in a storm drain when it has not rained for at least 72 hours. In a separate storm system, DWF is evidence of sewage, sullage, groundwater infiltration or illicit discharge. |
| Cross-connection | Any pipe, channel or opening that lets sewage or sullage (grey water from kitchens, bathrooms and laundries) enter a storm drain. |
| Infiltration facility | A facility designed to store runoff below the ground surface, or in a depression, and let it soak into the soil: infiltration trenches and basins, unlined bioretention, permeable pavement with an open base, soakaways, recharge pits and recharge wells. |
| Seasonal high groundwater table | As defined in Clause 3.10.2: the highest level in the SW monsoon season. |
| Hotspot | A land use with a high risk of spills or contaminated runoff (Clause 8.8.8). |
| Level of Service (LoS) / Value Rating (VR) | The scoring system of Clause 8.6, from the MARC/APWA BMP Manual (2012). |
8.3 Objectives and pollutants of concern
8.3.1 Stormwater treatment under this Manual shall aim to:
- (a) remove litter, plastics and other gross pollutants before they reach a waterbody;
- (b) remove suspended sediment, and the metals, nutrients and oil carried on it;
- (c) keep sewage and sullage out of storm drains and waterbodies;
- (d) recharge groundwater where soils and groundwater depth allow, without polluting it; and
- (e) prevent erosion and sediment discharge during construction.
8.3.2 The design shall address the following pollutants for every site, and the hotspot pollutants of Clause 8.8.8 where they apply:
Table 8.1 — Pollutants of concern, sources and primary controls
| Pollutant | Main sources in Jammu and Kashmir towns | Primary control |
|---|---|---|
| Gross pollutants (plastics, litter, vegetation) | Streets, markets, open dumping in drains | Source collection; GPTs and screens (Clause 8.10) |
| Suspended sediment | Construction sites, unpaved roads and verges, road wear, drain silt | Erosion and sediment control (Clause 8.12); pretreatment; filtration |
| Oil, grease and fuel | Roads, parking, fuel stations, workshops, bus depots | Oil-grit separators at hotspots; bioretention |
| Pathogens and organic load (BOD) | Sewage and sullage cross-connections, animal waste | Exclusion and DWF interception (Clause 8.9) |
| Nutrients (N, P) | Sewage, fertiliser, food waste, detergents | Exclusion; bioretention; wetlands |
| Heavy metals | Roads, roofs, industrial yards | Filtration; sedimentation |
Commentary. Gross pollutants and sewage come first in Clause 8.3 because they dominate the pollution of urban waterbodies in Jammu and Kashmir, and because no treatment BMP works for long if they are not removed. CPHEEO (2019) notes that Indian drains carry night soil, urine and food waste (Part A §9.5). In its WSUD procedure it lists TSS, total nitrogen, total phosphorus and gross pollutants as the key pollutants (Part A Ch. 10). AMRUT 2.0 funds the harvesting of rainwater "through storm water drains into water body (which is not receiving sewage/effluent)" (Lok Sabha unstarred question AU1419), which only works if sewage is first kept out of the drains.
8.4 Water quality volume and design flow
8.4.1 Water quality rainfall depth. The water quality rainfall depth is:
P_wq = max (P_ret, P_3m)
where:
- P_ret = the retention depth for the site's zone (Annex 2E, Clause 2.10), mm; and
- P_3m = the 24-hour 3-month ARI depth for the site's zone (Annex 8A), mm.
8.4.2 Water quality volume. The WQv shall be computed as:
WQv = (P_wq / 1000) × Rv × A
where:
- WQv is in m³;
- A = the contributing area, m²;
- Rv = 0.05 + 0.009·I; and
- I = the impervious percentage of the contributing area (0–100), after the connectivity rules of Clause 3.9.
The Rv form above may be used only for sites under 0.5 ha and under the Tier B simplified method (Clause 4.14). This is the same limit as for the retention volume (Clause 4.4.2). For all other sites the WQv shall be computed with the SCS-CN method, as the retention volume is: WQv (m³) = 10 × Q_wq × A, where Q_wq (mm) is the SCS-CN runoff from P_wq for each sub-area and A is in ha.
8.4.3 Climate factor. The climate factor of Clause 2.8 shall not be applied to P_wq. P_ret and P_3m are frequency statistics of ordinary rainfall, not AEP design depths.
8.4.4 WQv met by retention. The volume retained on site under Chapter 4 counts toward the WQv in full. Where the retained volume is equal to or greater than the WQv, no further treatment is required for that area, except:
- (a) pretreatment of inflows to each retention facility (Clause 8.5.3);
- (b) hotspot controls (Clause 8.8.8); and
- (c) the outfall requirements of Clause 8.10, where the site discharges to a waterbody.
8.4.5 Water quality design flow. Flow-through devices (swales, filter strips, oil-grit separators, GPTs) and diversion weirs for off-line BMPs shall be sized for Q_wq. Q_wq shall be computed from the 3-month ARI intensity at the time of concentration of the contributing area:
- (a) by the Rational Method, where Chapter 3 allows it (a single element draining no more than 16 ha); or
- (b) as the peak of a hydrograph method using the 3-month ARI 24-hour depth with the alternating-block pattern of Clause 2.9.1.
8.4.6 Bypass. Flows above Q_wq shall bypass flow-through and off-line treatment devices without washing out the material already captured. The bypass shall be part of the minor or major system (Chapter 6).
8.4.7 Drawdown. Where the WQv is held in an extended-detention BMP (wet pond, constructed wetland or dry extended-detention basin), it shall be released over 24–48 hours (Chapter 4).
Commentary. The WQv depth is the runoff from the 3-month ARI storm or the retention depth, whichever is greater. The 3-month ARI is the Malaysian water quality design storm (MSMA 2, 2012). The Malaysian 2008 checklist gave its depth as about 40 mm and said it captures 90% or more of 24-hour storm runoff volume (DID, 2008). The Jammu and Kashmir value must be computed (Annex 8A). Georgia sets its WQv as the runoff from 1.2 inches (about 30 mm), the depth that covers 85% of storms in an average year, and requires 80% removal of the average annual post-development TSS load (GSMM 2016, Vol 1, Standard #4). Kansas City's water quality storm is the 1.37-inch (about 35 mm) event that produces up to 90% of the runoff from all 24-hour storms in a year (MARC BMP Manual, 2012).
The Rv formula is from the MARC/APWA BMP Manual (2012), which computes WQv = P × Rv with Rv = 0.05 + 0.009·I. Rv is used instead of the SCS curve number because the CN method greatly understates runoff from small storms on pervious ground. Not applying the climate factor (Clause 8.4.3) has no direct precedent; this Manual does so because it treats P_wq like the retention depth, as a statistic of ordinary rainfall. Bypass of larger flows and the 24–48 hour drawdown follow Chapter 4; MARC (2012) required at least 40 hours of extended detention of the WQv.
Illustrative — not design values. For a 1.0 ha site with 80% impervious cover and an assumed P_wq of 50 mm:
- Rv = 0.05 + 0.009 × 80 = 0.77
- WQv = (50 / 1000) × 0.77 × 10,000 = 385 m³
8.5 Treatment train and pretreatment
8.5.1 Treatment train. Water quality control shall be designed as a treatment train, in the order shown in Figure 8.1:
- (a) source controls on the plot: roof runoff to RWH, rain gardens, permeable paving, disconnection of impervious areas, and silt traps at inlets;
- (b) site controls: bioretention, swales, filter strips, infiltration, oil-grit separators at hotspots, wet ponds and extended detention; and
- (c) regional controls, for public drainage: GPTs and DWF interceptors at outfalls, constructed wetlands at tank inlets, and regional ponds.
8.5.2 A development shall meet the WQv on site, through (a) and (b). Regional controls under (c) may count toward a development's WQv only where a regional facility treating the same runoff has been built under a notified basin plan (Clause 7.11).
8.5.3 Pretreatment. Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland shall have pretreatment at each concentrated inflow. Pretreatment shall be a sediment forebay, grass filter strip, silt trap or proprietary device that holds at least 10% of the WQv of its contributing area, or that is sized for Q_wq for flow-through devices.
8.5.4 Pretreatment shall be accessible for cleaning without entering or disturbing the main BMP.
Commentary. The treatment train follows CPHEEO (2019, Part A §10.2.3, SuDS treatment train) and CIRIA C753 The SuDS Manual (2015). It is also the order of priorities of this Manual: preserve, retain, detain, convey (Chapter 1). The 10% forebay volume has no Indian precedent; it is a common sizing rule for forebays in US manuals. In Jammu and Kashmir, unpaved verges, construction sites and drain silt deliver a heavy sediment load. Bioretention and infiltration facilities without pretreatment clog, often within a year or two.
Figure 8.1 — Treatment train: source, site and regional controls before the receiving waterbody, with sewage and dry-weather flow kept out of the system. Original drawing for this Manual, adapted from CIRIA, The SuDS Manual (C753), 2015, and MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012.
8.6 BMP selection: Level of Service and Value Rating
8.6.1 Method. In Tier A areas, the BMPs for each site shall be selected by the Level of Service (LoS) method of this Clause. In Tier B areas, the simplified route of Clause 8.6.5 may be used.
8.6.2 Required Level of Service. For a site that is not redevelopment, the required LoS depends on the change in curve number (ΔCN) from pre- to post-development (Chapter 3):
Table 8.2 — Required Level of Service for sites that are not redevelopment
| ΔCN | Impact | Required LoS |
|---|---|---|
| 17 or more | High | 8 |
| 7 to 16 | Moderate | 7 |
| 4 to 6 | Low | 6 |
| 1 to 3 | Minimal | 5 |
For redevelopment (existing impervious cover of 20% or more of the site), the required LoS shall be taken from Annex 8B.
8.6.3 Value Rating. Each BMP treating the WQv has a Value Rating (VR) from Table 8.3. The site's composite VR is the area-weighted average of the VRs of the BMPs serving each part of the site. Treatment trains get a composite VR under Annex 8B. The composite VR shall be equal to or greater than the required LoS.
8.6.4 Conditions for a Value Rating. A BMP earns its VR only if:
- (a) it is sized for the WQv (or Q_wq for flow-through devices) of the area credited to it;
- (b) it meets the design requirements of Clause 8.7 and, for infiltration, Clause 8.8; and
- (c) it has pretreatment under Clause 8.5.3.
8.6.5 Tier B simplified route. In Tier B areas, the requirement of Clause 8.6.3 is deemed met where the whole WQv of the site is either:
- (a) retained on site under Chapter 4; or
- (b) treated by a bioretention cell, rain garden or infiltration facility designed under Clauses 8.7 and 8.8, with pretreatment.
Table 8.3 — BMP Value Ratings and suitability in Jammu and Kashmir
| BMP | VR (MARC 2012) | Main pollutants removed | Volume reduction / recharge | Kandi boulder-gravel fans and khad beds | Laterite / hard rock | Valley floor (Gurti clay, Nambal peat), Sirowal or Upper Karewa / high water table | Jammu and Kashmir notes |
|---|---|---|---|---|---|---|---|
| Native vegetation (preserved) | 9.25 | All | High | Suited | Suited | Suited | Counts only for preserved, undisturbed area |
| Rain garden / infiltration | 9.0 | Sediment, metals, oil, nutrients | High | Suited if 1.0 m separation met | Conditional (test) | Not suited | Mosquito control: drain within 48 h |
| Bioretention | 8.5 | Sediment, metals, oil, nutrients | Medium–high (unlined); low (lined) | Suited | Suited, with underdrain | Lined, with underdrain | Media source and phosphorus content to be specified |
| Permeable pavement | 7.5 | Sediment, metals, oil | Medium–high | Suited | Conditional | Lined only | Not where run-on carries heavy silt |
| Extended detention wetland | 7.0 | Sediment, nutrients, metals | Low | Conditional (water balance) | Suited | Suited | Good at tank inlets (Clause 7.9.7) |
| Media / sand filter | 6.0 | Sediment, metals | Low | Suited | Suited | Suited (lined) | Needs frequent cleaning |
| Extended wet detention (wet pond) | 5.0 | Sediment, metals, some nutrients | Low | Conditional (water balance) | Suited | Suited | Dry-season water balance (Clause 8.7.8) |
| Vegetated filter strip | 5.0 | Sediment | Low–medium | Suited | Suited | Suited | Mostly as pretreatment |
| Native vegetation swale | 4.0 | Sediment, oil | Low–medium | Suited | Suited | Suited | Not where Q_wq velocity is high |
| Extended dry detention | 4.0 | Coarse sediment | Low | Suited | Suited | Suited | Combine with detention (Chapter 4) |
| Proprietary / hydrodynamic devices | 3.0–5.0 | Coarse sediment, oil, litter | None | Suited | Suited | Suited | VR from verified test data only |
| Signage (public education) | +0.25 | — | — | — | — | — | Added to composite VR |
The VR column is from the MARC/APWA BMP Manual (2012), Table 4.4. The suitability columns and notes have no direct precedent and are set by this Manual.
Commentary. The LoS and VR method is from the MARC/APWA Manual of Best Management Practices for Stormwater Quality (2012), Tables 4.2 and 4.4. The VRs combine a water quality score, based on effluent TSS concentrations in the International Stormwater BMP Database, with scores for volume reduction, temperature, and oils and floatables. The method suits Jammu and Kashmir for two reasons. It rewards volume reduction and preservation, which also serve recharge. It can also be checked by a reviewer without water quality modelling. Its weakness is that the scores come from US data. Jammu and Kashmir stormwater carries more litter and more sewage than the US runoff behind the scores (CPHEEO 2019, §9.5), so this Manual requires GPTs and DWF exclusion separately (Clauses 8.9 and 8.10) and does not let a VR stand in for them.
8.7 BMP design summaries
8.7.1 General. Each BMP shall be designed to the requirements below and to Annex 8D (BMP design sheets). The dimensions given are recommended starting values where marked; the designer shall justify any departure. Every BMP shall be designed for safe passage of flows above Q_wq (Clause 8.4.6) and shall have access for maintenance (Chapter 10).
8.7.2 Bioretention and rain gardens (Figure 8.2).
- (a) Surface ponding depth not more than 300 mm above the mulch, with an overflow at the maximum ponding level.
- (b) Surface ponding drained within 48 hours.
- (c) Filter media 600–900 mm deep: an engineered sandy loam with low fines and low phosphorus content (Annex 8D), with a 50–75 mm mulch layer.
- (d) A transition (choker) layer and a gravel drainage layer below the media.
- (e) A perforated underdrain where the design infiltration rate of the native soil (Clause 8.8.4) is below the rate needed to meet (b), or where the cell is lined.
- (f) Unlined cells shall meet the infiltration criteria of Clause 8.8. Cells that cannot meet them, and cells at hotspots, shall be lined.
- (g) Plants: native or naturalised species tolerant of both waterlogging and long dry spells.
8.7.3 Vegetated swales.
- (a) Trapezoidal or parabolic section, with side slopes no steeper than 1V:3H.
- (b) Longitudinal slope 0.5% to 4%, with check dams where steeper.
- (c) Flow depth at Q_wq not more than the height of the grass, and velocity at Q_wq not more than 0.3 m/s.
- (d) The 1% AEP flow (or the bypass) shall not erode the swale (Chapter 9 permissible velocities).
- (e) Where longitudinal slopes are below 1% or the subsoil is poorly drained, an underdrained ("dry") swale with filter media.
8.7.4 Vegetated filter strips.
- (a) Receive sheet flow only, with a level spreader where flow arrives concentrated.
- (b) Length in the direction of flow at least 5 m, and slope 1% to 8%.
- (c) Used mainly as pretreatment for bioretention, infiltration and swales.
8.7.5 Permeable pavement.
- (a) Run-on from impervious areas not more than twice the permeable area, and no run-on from unpaved or eroding areas.
- (b) Base reservoir of clean, open-graded aggregate, sized to hold its share of the WQv in its voids.
- (c) An open base (infiltrating) only where Clause 8.8 is met; otherwise lined with an underdrain, and then counted as filtration only.
- (d) Structural design for the traffic loading by the road authority's standards.
- (e) Not at hotspots, and not where the surface will be resurfaced with impermeable material.
8.7.6 Infiltration trenches and basins (Figure 8.3).
- (a) Pretreatment under Clause 8.5.3 in every case.
- (b) Trenches filled with clean washed aggregate, with a void ratio confirmed by test, wrapped in geotextile on the sides and top, on a sand base.
- (c) An observation well to the base of each trench.
- (d) Storage volume = WQv (or the retention volume of Chapter 4, where greater) held in the voids; emptied within 72 hours at the design infiltration rate.
- (e) An overflow to the minor or major system at grade.
- (f) Not brought into service until the contributing area is stabilised (Chapter 10).
8.7.7 Wet ponds (extended wet detention).
- (a) A permanent pool of at least the WQv, plus extended detention of the WQv above the pool, released over 24–48 hours.
- (b) A sediment forebay at each inlet (Clause 8.5.3).
- (c) Length-to-width ratio of the flow path at least 3:1, with no short-circuiting.
- (d) Permanent pool depth 1.0–2.5 m, with a safety bench (Clause 7.9.4).
- (e) A dry-season water balance (Clause 8.7.8).
- (f) The detention storage of Chapter 4 may sit above the extended detention level.
8.7.8 Water balance for permanent pools. Wet ponds and wetlands shall be shown, by a monthly water balance using IMD rainfall and pan evaporation, to keep at least 50% of the permanent pool volume (or the minimum wetland depth) through the driest year in 10. They shall not be topped up with groundwater, potable water or sewage. Where the balance fails, a dry extended-detention basin or a constructed wetland with a smaller permanent pool shall be used instead.
8.7.9 Constructed wetlands.
- (a) An inlet sedimentation pond (forebay) followed by a shallow vegetated macrophyte zone.
- (b) Extended detention of the WQv above the normal water level, released over 24–48 hours, with an extended detention depth not more than 0.5 m.
- (c) A flow path length-to-width ratio of at least 3:1, with deep zones across the flow path to spread the flow.
- (d) A high-flow bypass so that floods do not scour the macrophyte zone.
- (e) Where built at a tank inlet, the wetland shall sit within the tank's setback but outside its waterspread, and its storage shall not be counted as tank storage.
8.7.10 Gross pollutant traps.
- (a) Sized to treat Q_wq, with all flows up to the 1% AEP passing without washing out captured material.
- (b) Capture of gross pollutants down to about 5 mm.
- (c) Head loss included in the hydraulic grade line of the drain (Chapter 9), with the screen assumed 50% blocked.
- (d) Storage for captured material sized for the cleaning interval of the O&M plan, and not less than the 3-monthly cleaning of Chapter 10.
- (e) Vehicle access for cleaning by suction or grab.
8.7.11 Oil-grit separators.
- (a) Required at the hotspots of Clause 8.8.8 that involve fuel or oil: fuel stations, vehicle workshops and washing bays, bus and truck depots, and parking areas of more than 50 spaces.
- (b) Sized for Q_wq, with a high-flow bypass.
- (c) Not to be used as the only treatment: they shall be followed by a filtering BMP where the site needs a VR above 5.
8.7.12 Silt traps and catch pits.
- (a) At every inlet that receives runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody.
- (b) A sump at least 300 mm below the outlet invert.
- (c) Silt traps are pretreatment only and earn no VR.
Commentary. The design summaries draw on the MARC/APWA BMP Manual (2012), the Georgia Stormwater Management Manual (2016, Vol 2), CIRIA C753 The SuDS Manual (2015) and PUB Singapore's ABC Waters Design Guidelines. The dimensions are typical of those manuals but have not been calibrated in Jammu and Kashmir. Three local issues drive changes from the source manuals:
- Mosquitoes. Dengue is endemic in Jammu and Kashmir. Surface ponding in bioretention and rain gardens must drain within 48 hours (Clause 8.7.2(b)), well inside the time mosquito larvae need to develop. This is consistent with the 24–48 hour WQv drawdown of Clause 8.4.7.
- Dry seasons. Jammu and Kashmir has two rainfall regimes. Jammu receives 1,401.9 mm a year, 77% of it from June to September in the south-west monsoon, with its wettest month in July (416.5 mm); Srinagar receives 697.5 mm, only 30% of it from June to September, with its wettest month in March (104.6 mm), and more than 55% of its rain falls from December to April with western disturbances (IMD; CWC Flood Estimation Report, 1994). In the Jammu division the drier months run from October to May, broken by the rain of western disturbances; in the Kashmir valley the precipitation is spread through the year, and in winter much of it falls as snow (the snowmelt of January 2026 set off a dewatering drive in Srinagar, as reported). The Jhelum stands at about 1,585 m at Srinagar (CWC), so the whole valley floor, and every hill town above about 1,500 m, is in the zone where every BMP is checked for frost, snow and ice from December to March. In the towns the feed of a drain or pond in the dry months is often sewage, because the drains carry it (Clause 8.9, Commentary). A wet pond or constructed wetland whose water balance (Clause 8.7.8) cannot keep its permanent pool through the dry months on its own catchment's runoff is not to be used. On the valley floor, where Clause 8.8.1 bars infiltration and the water table is within 2 m, the practical forms are lined bioretention with an underdrain, swales, storage for use and lined extended detention behind the outfall; in the hill towns, where Clause 8.8.1 bars infiltration on the slopes, lined bioretention, swales on gentle ground, storage for use and lined dry detention; and on the Kandi, infiltration and recharge where the tests allow. Clause 8.7.8 applies to BMPs, which shall not be topped up with sewage; lakes, nambals, talabs, Kandi ponds, springs and wetlands are waterbodies under Chapter 7 and are not to be used as treatment for a development. Wet ponds that dry out turn into stagnant pools or are used for dumping. Clause 8.7.8 requires a water balance and bans topping up with sewage, which is a common practice for keeping urban ponds "full".
- Litter and silt. GPTs and silt traps are treated as essential, not optional, because Jammu and Kashmir drains carry heavy litter and silt loads. The 50% blockage factor for screens matches the grate clogging factor of Chapter 6.
The 50-space threshold for oil-grit separators, the 5 mm GPT capture size, the 0.3 m/s swale velocity and the other dimensions in this Clause have no direct precedent and are set by this Manual.
Figure 8.2 — Bioretention cell (rain garden) in section: pretreatment, surface ponding, filter media, transition and gravel layers, underdrain, overflow, and the 1.0 m separation to seasonal high groundwater for an unlined cell. Original drawing for this Manual, adapted from MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012, and CIRIA, The SuDS Manual (C753), 2015.
8.8 Infiltration and recharge criteria
8.8.1 Groundwater separation. An infiltration facility is permitted only where the seasonal high groundwater table is at least 1.0 m below the base of the facility. There is no exception in Jammu and Kashmir, which has no coastal sand areas (Clause 8.8.9). For this Clause the seasonal high groundwater table is, in the Jammu division, the highest post-monsoon level (September to November); on the Kashmir valley floor, the Karewas and the hill towns of the Pir Panjal, the higher of that level and the level from March to May, when the snowmelt and the winter rain leave the valley's water table at its shallowest, in May (CGWB); and, where wells flow, the ground surface. Jammu and Kashmir needs opposite rules on its valley floor, its Kandi and its slopes, and Clause 8.8.1 applies with the following, which are the three infiltration rules of Clause 4.11. (i) No infiltration on the Kashmir valley floor, or where the water is within 2 m (Clause 4.11, valley-floor rule). No infiltration facility, soakaway, soak pit, recharge pit, shaft or well, infiltration trench, unlined bioretention or permeable paving with an exfiltrating base shall be built or credited, and no infiltration credit shall be given, on the alluvium, Gurti clay and Nambal peat of the Kashmir valley floor (sub-area JK-C of Annex 2A), whatever depth to water a single reading shows, or on the Sirowal, the river terraces and floodplains and the margins of lakes, nambals, talabs and reservoirs anywhere in the Union Territory wherever the seasonal high water table is within 2 m of the surface or wells flow. Over the central and south-western valley the water table stood 0 to 2 m below ground in November 2014, wells on both sides of the Jhelum are artesian, with heads from 2 m above ground to 12 m below it, almost every CGWB well drilled below 25 m in Anantnag district flows (2.50 m above ground at Charsoo), 81.8% of the observation wells in Baramulla stood within 2 m of the ground in May 2021, and the CGWB states for Srinagar that "As depth to water level in the district is shallow there is no scope for artificial recharge to ground water" (CGWB). There, the exception for roof water in Clause 8.11.3(c) does not apply, the rainwater harvesting of UBBL-2021 is storage and reuse, not recharge, and retention is met by storage for use and by detention under Chapter 4, sized for the outfall-closed case and the pump capacity of Chapter 5. On the Upper Karewa tablelands (Budgam, Pulwama, Pampore and the airport plateau), whose marls and varved clays have "Low permeability" and perched water (CGWB), infiltration is used only at a small scale, after a test at the site, and only where item (iii) does not apply; outlets down a Karewa scarp are lined and erosion-resistant. On the Lower Karewa infiltration is judged case by case on a test. (ii) Recharge first in the Kandi (Clause 4.11, Kandi recharge rule). On the Kandi fans and khad beds north of the spring line (Jammu north, Nagrota, Samba and Kathua–Hiranagar north), whose boulder-gravel "acts as a very good medium for the recharge", with the water 7 to 30 m below ground over most of the belt and a transmissivity of 21 to 1,197 m²/d in Jammu and 692 to 2,613 m²/d in Kathua (CGWB aquifer mapping), recharge is the first means of meeting retention wherever the site tests allow, with a silt trap, a filter and a first-flush diverter; the base of a facility is at least 0.6 m above the post-monsoon water level and at least 1.0 m above the seasonal high water table (this Clause); a bore or shaft is used only after a hydrogeologist's check that includes a nitrate test of the target aquifer, because nitrate exceeded 45 mg/L in 9.2% of the CGWB's 2024 samples in the Union Territory, with the exceedances in Baramulla, Jammu, Kathua, Kupwara, Rajouri and Samba; no recharge bore or shaft is placed within the protection zone of a public supply well, for which no Jammu and Kashmir distance was found [TBC], because Jammu's water supply is understood to be drawn largely from groundwater (a reading of this Manual); and no road, parking, industrial or sewage-laden runoff is led into a bore or shaft. The Kandi ponds are kept and revived as recharge talabs (Jammu Master Plan 2032). The rule stops at the spring line: below it lies the Sirowal, where item (i) applies. All three Kandi districts, Jammu, Samba and Kathua, have been assessed Safe in every assessment from 2017 to 2024 (CGWB), so recharge here is for the water supply and the baseflow of the khads, not to relieve a stressed aquifer. (iii) No infiltration on hill slopes (Clause 4.11, hill infiltration rule). No deliberate infiltration practice (soakaway, soak pit, recharge pit, shaft or well, infiltration trench, unlined bioretention, or permeable paving with an exfiltrating base) shall be built or credited on natural ground sloping more than 10°; on the Murree and Siwalik clay–sandstone sequences of the hills; in a mapped subsidence or sliding zone, including Thathri Nai Basti (Doda), Pernote and Duksar (Ramban) and any area of Budgam district listed by JKPCC as prone to land sinking; on colluvium, slide debris or moraine, whatever its slope; or upslope of a cut slope or retaining wall within a distance of twice its height — unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope. The rule applies in sub-areas JK-B, JK-B1 and JK-D and to the slopes of JK-A and JK-C, such as the Karewa scarps and the foothills round the valley. On such sites roof runoff goes to the rainwater storage of UBBL-2021, and its overflow, with all other runoff, is led by a lined drain through a sediment trap to a stable channel, never onto an unprotected slope; the exception for roof water in Clause 8.11.3(c) does not apply, no infiltration is credited, and sewage is never led into a roadside drain on a slope. At Pernote the Geological Survey of India found in April 2024 that "During rains the ingress of surface runoff through these cracks may have developed the pore pressure, thus inducing the instability in the slope", and recommended "diverting the surface runoff away from the affected/active part of the slope" and that "Drains present in the affected slope should be lined/trained"; at Thathri the committee before the National Green Tribunal found no planned drainage and sewage pipes discharging to the roadside drains downslope (as reported). (iv) Springs. No Jammu and Kashmir rule keeps building or drains away from a spring (nag or cashma), though the Water Resources Act, 2010 counts springs among its water sources and spring ponds and spring channels among its hydraulic works. Within the recharge area of a spring used for drinking water, as a hydrogeologist maps it, only roof water and runoff that has passed a filtering BMP may be infiltrated, where items (i) and (iii) allow any infiltration at all; road runoff, sewage and septic effluent never are; and no infiltration facility, soak pit or septic tank is placed within Zone 1 of the spring (Clause 7.4). These rules for springs are set by this Manual. (v) Quality. UBBL-2021 require that provision be made "not to inject contaminate water into recharge structures in industrial areas" (Table 10-1), and the Water Resources Act, 2010 forbids the discharge of sewage or industrial effluent into the water of an irrigation work. No industrial or sewage-laden runoff is led to any recharge structure; arsenic exceeded 10 ppb in 0.8% of the 2024 samples, in Baramulla and Kupwara (CGWB), so recharge in those districts is of roof water only. Where recharge is through a well or shaft into fractured rock or deep gravel, a hydrogeologist's report shall confirm the depth to water, the receiving zone, and that no drinking-water well or spring within 30 m will be harmed. The 2 m limit, the 10° trigger, the distance of twice the wall height and these conditions are set by this Manual: no Jammu and Kashmir rule on infiltration or soak pits was found, and the CGWB records the soil infiltration rate as "Not Available on any Scale" in both the Kashmir valley and the Jammu plains The seasonal high groundwater table shall be determined under Clause 3.10.2.
8.8.2 Other separation. The base of an infiltration facility shall also be at least 1.0 m above bedrock or any impermeable layer, unless the facility is designed to recharge a fractured or weathered rock aquifer under Clause 8.8.10.
8.8.3 Infiltration tests. The infiltration rate shall be measured at the proposed base level of the facility:
- (a) by a double-ring infiltrometer test (ASTM D3385) for basins, bioretention and permeable pavement;
- (b) by a falling-head borehole or trial-pit soakage test (for example BRE Digest 365) for trenches, soakaways, recharge pits and recharge wells;
- (c) with at least 2 tests per facility, and at least 1 test per 100 m² of infiltration base area or per 50 m of trench length; and
- (d) by a person competent in geotechnical testing, with the results reported on the Infiltration Test Record (Form 8-2).
Tests made in the dry season shall be reported with the groundwater level at the time of test and the seasonal high level of Clause 8.8.1.
8.8.4 Design infiltration rate. The design infiltration rate is the measured rate divided by a safety factor:
- (a) 2.0 where the tests meet Clause 8.8.3(c) and the results vary by no more than a factor of 2; and
- (b) 3.0 otherwise.
8.8.5 Minimum rates.
- (a) Full infiltration (no underdrain) only where the design rate is at least 13 mm/h.
- (b) Partial infiltration, with an underdrain, where the design rate is 3 mm/h to 13 mm/h. Only the volume that infiltrates within 72 hours is credited as retention.
- (c) No infiltration credit where the design rate is below 3 mm/h.
8.8.6 Setbacks for infiltration facilities. Infiltration facilities receiving runoff from roads, parking or other paved surfaces shall be at least:
- (a) 3 m from building foundations, and 5 m from a basement;
- (b) 1.5 m from a property boundary, unless the neighbour agrees in writing;
- (c) 30 m from a drinking-water well or borewell;
- (d) 15 m from a septic tank or soak pit; and
- (e) 6 m from the crest of a slope steeper than 1V:3H, unless a geotechnical report shows the slope remains stable.
Roof-only runoff to recharge structures is subject to (a) and (b) only, and to Clause 8.11.3.
8.8.7 Drawdown and verification. Every infiltration facility shall empty within 72 hours at the design rate (Chapter 4), and shall be tested after construction (Clause 10.9.3).
8.8.8 Hotspots. Runoff from the following shall not be infiltrated without treatment, and shall not be infiltrated at all where (d) or (e) applies:
- (a) fuel stations;
- (b) vehicle workshops, washing bays, and bus and truck depots;
- (c) industrial yards and loading areas where hazardous materials are handled or stored;
- (d) solid waste transfer stations and landfill areas; and
- (e) land known or suspected to be contaminated.
Treatment for (a) to (c) shall include an oil-grit separator and a lined filtering BMP before any infiltration.
8.8.9 Sandy coastal aquifers. This Clause applies only to coastal sand aquifers. Jammu and Kashmir has none, so the Clause has no effect in the Union Territory; it is kept only so that the clause numbers stay unchanged. The Kandi boulder-gravel fans and the river sands and gravels of the Jhelum, the Tawi and the Chenab are not coastal sand areas: Clause 8.8.1 applies there in full, and the reduced separation of item (d) does not. In coastal sand areas:
- (a) infiltration is the preferred means of meeting retention and the WQv wherever Clause 8.8.1 is met;
- (b) storm drains shall not be designed to lower the groundwater table: inverts below the seasonal high groundwater table shall be watertight, with no weep holes or subsoil drains that discharge groundwater to the outfall, unless a hydrogeological report shows no harm to the freshwater aquifer;
- (c) no long-term pumping of groundwater into storm drains shall be approved (for example basement dewatering); and
- (d) in notified coastal sand areas, roof-only runoff may be infiltrated with a separation of not less than 0.5 m to the seasonal high groundwater table, provided a groundwater mounding check shows that the mound stays at least 0.3 m below the facility base and does not reach adjacent foundations or basements. No other runoff may use this reduced separation;
- (e) where neither the 1.0 m separation nor clause (d) can be met, the site shall use surface retention that does not infiltrate below ground (for example shallow vegetated depressions, disconnection of roofs onto lawns, and reuse), and detention under Chapter 4.
8.8.10 Laterite and hard-rock areas. In laterite and hard-rock terrain (for example the Siwalik and Murree sandstone and clay of the outer hills, as around Udhampur, Ramban, Reasi, Rajouri and Poonch, where the Geological Survey of India found "alternating layers of permeable sandstone and weak impermeable clay" at Pernote (2024), and the rocks of the inner Chenab hills and the Pir Panjal, as around Doda, Kishtwar, Bhaderwah and Banihal, where groundwater is held in joints, fractures and the weathered cover and comes out at springs and seepages; on any slope in these areas the hill limits of Clause 8.8.1 apply first):
- (a) tests shall be made at the facility base, below any surface crust or hardpan;
- (b) recharge into weathered or fractured rock is permitted only for roof runoff, or for runoff that has passed through a filtering BMP, because fractures give little treatment; and
- (c) infiltration on or above slopes shall be checked for slope stability.
8.8.11 Delta clays and black cotton soils. In the alluvium, Gurti clay and Nambal peat of the Kashmir valley floor, where the water table stands 0 to 2 m below ground over the central and south-western valley and wells on both sides of the Jhelum flow (CGWB), the marls and varved clays of the Upper Karewa tablelands, with their perched water, the Sirowal of the Jammu plains, the beds and margins of lakes, nambals and talabs, and the clayey slide debris of the hills, and in expansive black cotton soils:
- (a) infiltration facilities will usually fail Clause 8.8.5 and need not be tested where the soil survey (Chapter 3) shows HSG D; and
- (b) where infiltration is used near buildings on expansive soils, the setback of Clause 8.8.6(a) shall be doubled.
Commentary. The 1.0 m groundwater separation is a core requirement of this Manual. The other values in this Clause (the 1.0 m bedrock separation, test numbers, safety factors, minimum rates and setbacks) are typical of US and UK practice and have no Jammu and Kashmir precedent. The well setback in Clause 8.8.6(c) applies to runoff from paved surfaces, not to roof water. Jammu and Kashmir RWH practice routes roof water into open wells and recharge wells, and Clause 8.11 keeps that practice.
No map of hydrologic soil groups for Jammu and Kashmir, and no measured infiltration rate usable for design, was found: the CGWB's aquifer-mapping reports for the Kashmir valley and for the outer plains of the Jammu province both record the soil infiltration rate as "Not Available on any Scale", and the infiltration rates reported for the Basantar catchment could not be verified and are not used. Every infiltration design needs the tests of Clause 8.8.3. The geology and depths below are from the CGWB's reports. The Kandi of the Jammu plains, "equivalent to Bhabar" and about 6 km wide, falls at 1 in 90 to 1 in 120 and is "underlain by boulder, gravel, which acts as a very good medium for the recharge"; its water lies 7 to 30 m below ground over most of the belt and 45 to 84 m in the deeper aquifers, with a transmissivity of 21 to 1,197 m²/d in Jammu and 692 to 2,613 m²/d in Kathua; its 365 ponds hold water because of "the role of clay in checking heavy seepage in the highly porous Kandi Belt". Below the spring line the Sirowal is finer and flatter (1 in 250 to 1 in 300), its water 2 to 5 m below ground over most of it, waterlogged in the south-west, with flowing wells at Hiranagar, Rajpura, Jangi Chak, Airwan and Nagri and more than half the wells of Kathua flowing. On the Kashmir valley floor the soils are Gurti, the clay of the Jhelum's flood plain south of Srinagar, whose "water retaining capacity is high", and Nambal peat near the river and round Wular, Manasbal and Anchar; the water table stood 0 to 2 m below ground over the central and south-western valley in November 2014; artesian wells are found "throughout the valley … on either sides of Jhelum River", with heads from 2 m above ground to 12 m below it; in Srinagar district the water stands 2.00 to 3.00 m below ground before the monsoon and 1.50 to 2.50 m after it, and "As depth to water level in the district is shallow there is no scope for artificial recharge to ground water"; and in May 2021, 55% of the observation wells of the Kashmir region and 81.8% of those in Baramulla stood within 2 m of the ground. The Karewa tablelands are lake deposits: the Upper Karewa marls, silts and varved clays have "Low permeability" and perched water, and the Lower Karewa "Moderately high" permeability, confined to flowing. In the hills of Ramban and Udhampur the Murree rocks are "alternating layers of permeable sandstone and weak impermeable clay" (Geological Survey of India, Pernote, 2024), with springs and seepages. The Union Territory draws 22.28% of its extractable groundwater, and all 149 assessment units were assessed Safe in 2024, including Srinagar, which had been Semi-critical (73.85%) in 2022; Jammu, Samba and Kathua have been Safe in every assessment from 2017 to 2024, so the Jammu plains are not a stressed aquifer; the change from 20 units to 149 in 2024 means the series are not directly comparable. Nitrate exceeded 45 mg/L in 9.2% of the 2024 samples (Baramulla, Jammu, Kathua, Kupwara, Rajouri and Samba) and arsenic exceeded 10 ppb in 0.8% (Baramulla and Kupwara). Water put into a hill slope is a hazard as well as a resource: at Pernote the Geological Survey of India found that "the surface water and spring water over the longer period of time is continuously percolating in jointed moderately weathered rock mass and loose unconsolidated overburden material", and at Thathri the committee before the National Green Tribunal found no planned drainage (as reported). This Manual's interim soil groups follow from these: the Kandi fans and khad beds A (B where clayey), the Sirowal C, the Siwalik and Murree hill slopes D for design, the Upper Karewa C to D, the Lower Karewa B to C, the valley floor D, and the high mountains C, or D when frozen (Chapter 3). Jammu and Kashmir therefore needs opposite rules on its valley floor, its Kandi and its slopes. On the Kandi, recharge comes first, with pretreatment, a nitrate check and protection of the wells that supply Jammu. On the Kashmir valley floor, the Sirowal and every other ground where the water is within 2 m, no water is put into the ground, and rainwater harvesting is storage and reuse. On the hill slopes, in the subsidence zones and on the debris cover, no water is put into the ground on purpose, under the hill infiltration rule of Clause 4.11, which Clause 8.8.1 applies. Everywhere, runoff from roads and open land goes to surface systems and never directly to a recharge well, borewell or shaft (Clause 8.11.3(b)). Clause 8.8.9 has no effect in Jammu and Kashmir, which has no coast.
Figure 8.3 — Infiltration trench in section: pretreatment sump, aggregate-filled trench in geotextile, observation well, overflow, the 1.0 m minimum separation to the seasonal high groundwater table, and setbacks to wells and foundations. Original drawing for this Manual, adapted from the Georgia Stormwater Management Manual, 2016 (Vol 2), and CIRIA, The SuDS Manual (C753), 2015.
8.9 Sewage cross-connections and dry-weather flow
8.9.1 No sewage in storm drains. No sewage or sullage (grey water from kitchens, bathrooms and laundries), septic tank effluent, or trade effluent shall be connected to, or discharged into, any storm drain, by any pipe, channel or opening.
8.9.2 Condition of approval. Before the completion certificate, the Applicant shall show, by a dye or smoke test witnessed by the Authority or the sewerage agency, that every sewage and sullage outlet on the site discharges to a sewer or to an approved on-site system, and that none discharges to a storm drain. Any existing cross-connection on the site shall be removed as a condition of approval, including on redevelopment and on additions to existing buildings.
8.9.3 Where no sewer exists. Where no sewer is available, sewage and sullage shall go to an approved on-site or decentralised treatment system. The treated effluent of such a system may be discharged to a storm drain only with the written consent of the Jammu and Kashmir Pollution Control Committee (JKPCC) and the drain owner.
8.9.4 Public drains: DWF survey. Every ULB in a Tier A area shall survey its storm drain outfalls to waterbodies for dry-weather flow at least once a year, before the SW monsoon, and record:
- (a) the outfalls with DWF;
- (b) the estimated DWF rate; and
- (c) the upstream sources found by tracing, CCTV, dye or smoke testing.
The results shall be published in the register of Clause 10.17.
8.9.5 DWF interception. Until the sources are removed, every outfall to a waterbody that carries DWF shall have a DWF interceptor that:
- (a) diverts the DWF to a sewer or a treatment plant;
- (b) does not reduce the capacity of the storm drain for the minor or major event (Chapter 6), with its weir or diversion head losses included in the hydraulic design (Chapter 9);
- (c) has a screen ahead of the diversion; and
- (d) is not a substitute for removing the source connections.
8.9.6 Sewage overflows. No new sewage overflow, emergency bypass or pumping station overflow shall be designed to discharge into a storm drain or waterbody, except where the sewerage agency shows that no alternative exists, and then only with screening and with the overflow frequency stated.
Commentary. The prohibition of sewage connections and the removal of existing cross-connections as a condition of approval are core requirements of this Manual, and Clause 1.10.3 allows no variance from them. Sewage in storm drains is the single largest water quality problem of urban drainage in Jammu and Kashmir. It defeats every other measure in this chapter: BMPs designed for stormwater are overloaded, GPTs fill with sludge, and the receiving tanks and channels become sewage lagoons. CPHEEO (2019) notes that Indian drains carry night soil and urine (Part A §9.5). DWF interception (Clause 8.9.5) is an interim measure. It protects the waterbody while the sources are traced and removed, but it can become permanent if the source work is not done, which is why the annual survey and publication of Clause 8.9.4 are required. The annual survey frequency is set by this Manual.
In Jammu and Kashmir the storm drains carry sewage, and in both cities the drains end in lakes, marshes and rivers that the cities depend on. In Srinagar about 193.34 MLD of sewage is generated and treatment exists for 62.01 MLD, so that "percentage of Sewage treatment before its discharge into surface water bodies" is 32.07%; a 60 MLD plant at Noorbagh, at its final stage of commissioning in 2024, would raise it to 63.10% (JKPCC, response of 14 August 2024 in NGT O.A. 504/2024). JKPCC counts six treatment plants of 53.8 MLD in the catchments of Dal and Nigeen, but other counts conflict (five plants of 36.7 MLD, as reported; two plants of 17.08 and 16.10 MLD at Brari Nambal alone, as quoted from the CPCB in NGT O.A. 190/2025), and "Untreated sewage gets entry into the Dal Lake from areas like Telbal, Lalbazar etc."; the roughly 910 houseboats on Dal and Nigeen discharge to the lakes without treatment, except at Nigeen, where houseboat sewage is directed to sumps. The Srinagar Master Plan 2035 proposes a "Green Infrastructure Plan" to reduce combined sewer overflows, which implies that the drains and sewers overflow into each other (a reading of this Manual). In Jammu "The BOD levels of waters in 90% of city drains indicate that the discharge is comparable to a range of weak to strong domestic sewage", "Storm water drains carry considerable quantities of raw and untreated effluents", and the roadside drains that serve as storm drains run "eventually into the Tawi River"; the plan expects 350 MLD of sewage by 2032 against 73 MLD of treatment (Jammu Master Plan 2032, §§5.1.3 and 11.1). The CPCB's list of polluted river stretches of October 2025 places seven stretches of the Union Territory in it: the Chunt Kol at Maulana Azad Bridge in Srinagar in Priority III; the Jhelum from the confluence of the Vishav Nallah to below Baramulla and the Tawi from Tawi Bridge to the Balol Nallah in Priority IV; and the Basantar below Samba, the Devak at Udhampur, the Gawkadal stretch at Srinagar and the Lidder from Lavender Park to Nunwan in Priority V; it withdrew the Chenab from the list (JKPCC, report of March 2026 in NGT O.A. 413/2025). JKPCC's mean BOD of the Jhelum rose from 2.36 mg/L in 2020–21 to 3.20 in 2023–24 and stood at 3.09 in 2024–25; its faecal coliform series is misaligned in the copy read and is not cited. On the slopes the sewage reaches the drains directly: at Thathri the committee before the National Green Tribunal found "unplanned PVC pipes for the purpose of sewerage disposal to the road side drainage downslope" (as reported), and at Pernote a site report annexed to JKPCC's compliance report in NGT O.A. 642/2024 asked that "the domestic sewage be channelised". No count of tapped and untapped drains for either city was found, and the Municipal Acts were not read for any power to require separate drains for sewage and rain-water [TBC]. Lake outfalls. Until its sources are removed, every storm drain outfall to Dal, Nigeen, Anchar or Wular, and to any other lake, nambal or Wildlife Conservation Reserve, carries a DWF interceptor under Clause 8.9.5 and a screen ahead of it, whether or not DWF has yet been measured in it, and comes first in the survey of Clause 8.9.4 and the programme of Clause 8.10.4; this requirement is set by this Manual, consistent with the ban in the Water Resources Act, 2010 on the discharge of sewage into the water of an irrigation work, and it adds to the sediment trap of Clause 7.10.6 (Figure 7.3). Every interceptor is a DWF interceptor under Clause 8.9.5, and Clause 8.9.5(b) applies to it in full: it is sized from the measured dry-weather flow of its drain, does not reduce the drain's capacity for the minor and major events or raise the flood level behind it, and passes the storm flow above its capacity on down the drain, never to the treatment plant or back into the town. On the valley floor an interceptor that lies ahead of a dewatering station is placed so that the station does not pump dry-weather flow to the Jhelum, its chambers are watertight against a water table at the ground and checked for flotation, and its bypass works with the river's gate shut; on a khad an interceptor and its chamber are placed above the 1% AEP flood level of the khad found under Clause 5.8.5(c), or protected against the scour and debris of that flood (Chapter 9). These conditions are set by this Manual.
8.10 Outfalls to waterbodies: first flush, gross pollutant traps and screens
8.10.1 Requirement. Every new storm drain outfall to a waterbody, and every existing outfall on a drain that is rebuilt, widened or extended, shall have:
- (a) a GPT designed under Clause 8.7.10; and
- (b) first-flush treatment: treatment of the WQv (or Q_wq) of the contributing catchment by the BMPs of Clause 8.7, either on the contributing sites or at the outfall.
8.10.2 Where treatment at the outfall is impracticable. Where land is not available at a public outfall, first-flush treatment may be provided by:
- (a) a proprietary first-flush or hydrodynamic device sized for Q_wq; or
- (b) a treatment wetland or forebay within the waterbody setback (Clause 7.5.1(b)), outside the waterspread.
8.10.3 Screens and trash racks. Screens at outfalls, culvert inlets and pump sumps shall:
- (a) be designed with 50% blockage for hydraulic capacity;
- (b) have an overflow or bypass path so that a fully blocked screen does not flood property;
- (c) have bar spacing chosen for the hazard: closer spacing for litter capture, wider spacing where blockage would cause flooding; and
- (d) be cleanable from a safe platform, with vehicle access.
8.10.4 Existing outfalls. Each ULB shall prepare a programme to fit GPTs and DWF interceptors to its existing outfalls to waterbodies, starting with outfalls to tanks used for drinking water supply and to notified wetlands (Clause 7.12), and shall report progress in the register of Clause 10.17.
Commentary. This Manual requires first-flush treatment and gross pollutant traps at outfalls to waterbodies. Gross pollutants are the most visible form of pollution in Jammu and Kashmir waterbodies, and plastics also block drains and culverts, which links water quality to flooding. The 50% screen blockage matches the grate clogging factor of Chapter 6. Clause 8.10.3(c) warns against fine screens on large drains, which block in the first hour of a storm and cause the flooding they were meant to prevent.
8.11 Rainwater harvesting integration
8.11.1 RWH mandate continues. The rainwater harvesting required by the Jammu and Kashmir Unified Building Bye-Laws 2021 (chapter 10, which makes a "complete proposal of rainwater harvesting" mandatory for every building on a plot of 100 m² or more (clause 10.1), with "emphasis on both storage and reuse" for plotted houses, recharge mandatory for buildings, including group housing, on plots of more than 500 m² (clause 10.5), storm water captured in public open spaces of more than 500 m² (clause 10.4), permeable paving for the open parking of group housing (Table 10-1), and inspection by a rainwater harvesting cell before the completion certificate or a service connection (clause 10.6), but no storage volume; the Srinagar Master Plan 2035, regulation 1-7-13, makes storage mandatory only on plots of 1,000 m² and above and for group housing, and the stricter threshold of the bye-laws applies) continues to apply, subject to the limits of Clause 8.8.1 (Chapter 1). This Clause sets how RWH structures are counted under this Manual.
8.11.2 Three different functions. The designer shall keep apart, on the drawings and in the calculations:
- (a) harvesting: storage for use (sumps and tanks);
- (b) recharge: recharge pits, trenches, shafts and wells that put water into the ground; and
- (c) detention: storage with an orifice outlet that is empty at the start of a storm (Chapter 4).
8.11.3 Recharge structures.
- (a) Roof runoff may be led to recharge wells, open wells, recharge pits and shafts after a filter or settling chamber.
- (b) Runoff from roads, parking and other paved areas shall not be led directly into any well, borewell or recharge shaft. It may be recharged only through an infiltration facility that meets Clause 8.8, with pretreatment.
- (c) Recharge structures shall meet the groundwater separation of Clause 8.8.1, measured from the base of the pit or the bottom of the filter media, except recharge wells that receive filtered roof water only.
8.11.4 Credit toward retention and WQv. A recharge structure counts toward the retention volume of Chapter 4 and the WQv only where:
- (a) its infiltration rate has been tested under Clause 8.8.3;
- (b) it empties within 72 hours at the design rate; and
- (c) it has pretreatment.
A harvesting sump counts toward retention only where its contents are used, by a demand stated in the drainage report, within 72 hours (Chapter 4).
8.11.5 No credit as detention. RWH storage does not count as detention unless it is a dedicated volume that is empty when a storm arrives, with an outlet. RWH sumps are assumed full at the start of every SW monsoon (JJAS) design storm (Chapter 4).
8.11.6 Overflow. Every RWH structure shall have an overflow that discharges at grade to the site drainage, never onto a neighbouring plot or into a sewer.
8.11.7 Surface-runoff recharge in public spaces. Recharge trenches, shafts and percolation pits in roads, medians, parks and other public spaces shall meet Clause 8.8 in full, including the hotspot rules for roads with heavy traffic, and shall have a GPT or silt trap at each inlet.
Commentary. The rule that RWH storage does not count as detention is set in Chapter 4. Jammu and Kashmir's building rules make a rainwater harvesting proposal compulsory, but none of them sets a storage volume or a detention rule. Chapter 10 of UBBL-2021 provides that "All buildings having a plot size of 100 sq.m. Or more, while submitting the building plans for sanction, shall mandatorily include the complete proposal of rainwater harvesting", with "emphasis on both storage and reuse" for plotted houses; that "Recharging of ground water should be made mandatory … for all types of buildings, including Group Housing Societies having a plot area more than 500 sq. m. and above" (clause 10.5); that public open spaces of more than 500 m² "shall have arrangements for complete utilization and capture of storm water" (clause 10.4); that in group housing "Concrete paving to be avoided and permeable materials are to be used for all open parking spaces" (Table 10-1); and that a rainwater harvesting cell inspects the structures "before issuing Completion Certificates or NOCs for service connections" and checks every building above 1,000 m² each year (clause 10.6). The only quantity it gives is descriptive: "Rainwater can be harvested to the extent of 55,000 litres per 100 sq. m. area per Year from rooftops" (clause 10.1), about 550 mm a year (a reading of this Manual). The Srinagar Master Plan 2035 makes storage mandatory only "on plots of 1000 sq. mtr and above, and all group housing" (regulation 1-7-13); the bye-laws are later and apply across the Union Territory, and the stricter threshold of 100 m² applies. The Water Resources Act, 2010 lets the regulatory authority advise the Government on areas where rooftop harvesting should be made mandatory (section 122 [TBC]), which is advisory, not a rule, and no area was found notified. The Jammu Master Plan 2032 records that "Rainwater harvesting is not practiced in city" (§5.1.3). Enforcement is through the plan scrutiny of S.O. 304, which checks rainwater harvesting among its mandatory parameters, and the inspection before completion; no audit of how many structures were built, or how they are used, was found. The rules set no test of a recharge pit, no protection of the aquifer from road runoff, no storage to be empty before a storm, and no limit on recharge where the water table is at the ground or on a slope. Chapter 4 sets, for credit under this Manual, a minimum storage of 20 litres per m² of roof (set by this Manual). On the Kandi fans, recharge may be the main function of harvesting where Clause 8.8.1 allows it (Clause 8.11.2(b)); on the Kashmir valley floor, the Sirowal and every other ground where the water table is within 2 m, and on hill slopes, subsidence zones and debris cover, harvesting is for storage and use only, and its overflow goes to a lined drain (Clause 8.8.1). RWH serves water supply and recharge. It is usually full, or its soil saturated, by the time a late-August or September storm, such as those of September 2014 and August 2025, arrives after weeks of rain, which is why it cannot be counted as detention.
Clause 8.11.3(b) has no direct precedent; this Manual sets it because road runoff carries oil, metals and pathogens. A recharge shaft or borewell bypasses the soil that would otherwise filter it and delivers it straight to the aquifer that supplies wells nearby. The CGWB Manual on Artificial Recharge of Ground Water (2007) gives recharge structure types and filter designs; this Manual adds the source-water restrictions.
8.12 Construction-stage erosion and sediment control
8.12.1 ESC plan. Every development with land disturbance of 0.1 ha or more, and every public drainage or road work, shall have an Erosion and Sediment Control (ESC) plan, approved with the drainage report. It shall show:
- (a) the sequence of clearing, earthworks and stabilisation;
- (b) the area exposed at each stage;
- (c) the measures of Clause 8.12.3, with their locations and sizes;
- (d) the protection of infiltration and retention areas (Chapter 10);
- (e) stockpile, concrete washout and fuel storage locations; and
- (f) the inspection and maintenance schedule.
8.12.2 Monsoon timing. Earthworks shall be planned so that:
- (a) the area exposed during the SW monsoon (June to September) is as small as practicable;
- (b) all completed earthworks are stabilised by vegetation, mulch, matting or paving by 31 May; and
- (c) any area exposed between 15 June and 31 October has sediment controls in place before it is cleared.
8.12.3 Measures.
- (a) Silt fences along the downslope edge of disturbed areas receiving sheet flow, with the area draining to each fence limited as set in Annex 8E.
- (b) Sediment traps for concentrated flow from disturbed areas of up to 2 ha.
- (c) Sediment basins for disturbed areas of more than 2 ha. The storage volume below the outlet shall be at least the greater of the runoff from the 50% AEP (2-yr) 24-hour storm and 250 m³ per hectare of drainage area, with a dewatering outlet that draws water from the surface.
- (d) Inlet protection at every existing drain inlet that receives runoff from the site.
- (e) Stabilised construction exits, with wheel washing where vehicles enter public roads.
- (f) Stockpiles outside Zone 1 of any waterbody setback (Chapter 7), at least 10 m from any drain, and covered during the SW monsoon.
- (g) Dewatering discharges passed through a sediment basin, settling tank or filter bag, never pumped directly into a drain or waterbody.
- (h) Concrete washout in a lined pit, never into a drain.
8.12.4 Design storm for temporary works. Temporary ESC measures use the rainfall of Chapter 2 with a climate factor of 1.0 (Clause 2.8.2).
8.12.5 Inspection. ESC measures shall be inspected weekly and within 24 hours after every heavy-rainfall event (as defined in Chapter 10), repaired within 48 hours, and cleaned when half full of sediment.
8.12.6 Removal. Temporary measures shall be removed only after the area draining to them is stabilised. Sediment shall be removed from any permanent facility used for sediment control before its as-built survey (Chapter 10).
Commentary. The 0.1 ha threshold is the applicability threshold of Chapter 1. The sediment basin volume of 250 m³/ha is the US EPA Construction General Permit minimum of 3,600 ft³ per acre drained, converted to SI (US EPA, 2022 CGP); the CGP allows the alternative of the 2-year, 24-hour runoff. This Manual requires the greater of the two, because Jammu and Kashmir's 2-year 24-hour depths are high and construction sites are commonly left exposed through the SW monsoon. The 2 ha division between traps and basins, the 31 May stabilisation date, the 10 m stockpile distance and the inspection frequency have no direct precedent and are set by this Manual. The 31 May date matches the pre-monsoon deadline of Chapter 10. Construction sediment is a direct flood hazard as well as a pollutant: it fills drains, culverts and tanks, and in Jammu and Kashmir sediment is the pollutant that takes the waterbodies' storage: the flood spill channel of the Jhelum silted from 17,000 to 4,000 cusecs "due to accumulation of sediment load from various nallahs which merge with the channel" (CAG Report No. 4 of 2016), 60% of Hokersar is reported under heavy siltation and Wular to have lost about 30 per cent of its volume to silt, and Dal's releases are reported limited by the silt in it (Clause 7.9, Commentary); in the hills, muck from road works has been dumped in khads and nallahs (as reported; Clause 6.3.6). In Jammu and Kashmir the outlet of a sediment basin or trap under Clause 8.12 discharges to a lined drain or a stable channel and never onto an unprotected slope or a Karewa scarp; no sediment basin or trap is designed to infiltrate where Clause 8.8.1 bars infiltration, which includes the whole Kashmir valley floor; no spoil, muck or debris from a site is placed in a khad, nallah, kol, khul, lake, nambal or talab or within its Zone 1; and a construction site in the catchment of a lake or nambal keeps its sediment out of every drain that reaches the lake. The reason given above for the larger basin volume, that the 2-year 24-hour depths are high, holds for the Jammu division, where the NIH-DHAARA reanalysis gives about 128 mm at Jammu and more at Udhampur, Katra and Kathua; it does not hold for the Kashmir valley, where the same source gives about 55 mm at Srinagar, and there the minimum of 250 m³ per hectare is likely to govern over the 2-year runoff, so the rule of Clause 8.12.3(c) is kept unchanged. On the valley floor, the season of exposure is also the western-disturbance and snowmelt season of March to May, when the ground is wettest, so a site there has its sediment controls in place from 1 March as well as from 15 June (set by this Manual).
8.13 Monitoring
8.13.1 Outfall monitoring. Each Tier A authority shall monitor water quality at a representative set of its outfalls to waterbodies, including every outfall to a drinking-water tank or notified wetland. Monitoring shall include:
- (a) dry-weather sampling (Clause 8.9.4), at least once a year before the SW monsoon; and
- (b) wet-weather sampling of at least three events each SW monsoon at a set of index outfalls.
8.13.2 Parameters. At minimum: TSS, BOD, COD, faecal coliform, total nitrogen, total phosphorus, oil and grease, and, for industrial catchments, heavy metals. Results shall be compared with the CPCB water quality criteria for the designated best use of the receiving waterbody.
8.13.3 Gross pollutant records. The mass or volume of material removed from each GPT and screen at each cleaning shall be recorded in the O&M records (Chapter 10).
8.13.4 BMP performance monitoring. The State Stormwater Technical Committee shall run a BMP performance calibration programme and shall revise Table 8.3 and Annex 8C from its results.
8.13.5 Publication. Monitoring results shall be published in the register of Clause 10.17.
Commentary. No Jammu and Kashmir programme of stormwater quality monitoring was found during research for this Manual, and CPHEEO (2019) sets no Indian targets. The monitoring in Clause 8.13 is the minimum needed to calibrate Table 8.3 and to show whether DWF interception and source removal are working. The parameter list follows the key pollutants named in CPHEEO's WSUD procedure (TSS, nitrogen, phosphorus and gross pollutants), with BOD and faecal coliform added because of sewage contamination. The monitoring frequencies are set by this Manual.
8.14 Submittal requirements
Every drainage report under this chapter shall include:
- the Water Quality Sheet (Form 8-1): P_ret, P_3m and P_wq; the WQv and Q_wq for each drainage area; the volume retained under Chapter 4; and the BMP serving each area;
- for Tier A: the LoS calculation (ΔCN, required LoS) and the composite VR (Clause 8.6);
- the design of each BMP to Clause 8.7 and Annex 8D, with pretreatment;
- for infiltration and recharge: the Infiltration Test Record (Form 8-2), the seasonal high groundwater level and its source, the design rate, the drawdown time, and the setbacks of Clause 8.8.6;
- the sewage and sullage connection plan and the dye or smoke test record of Clause 8.9.2;
- the GPT and first-flush design for any outfall to a waterbody (Clause 8.10);
- the RWH layout, separating harvesting, recharge and detention (Clause 8.11); and
- the ESC plan (Clause 8.12).
8.15 Review and update
8.15.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). Table 8.3 shall also be reviewed when the calibration programme of Clause 8.13.4 reports, and in any case within 5 years of notification.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A: Engineering Design (§9.5, Ch. 10). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- Mid-America Regional Council and Kansas City Metro Chapter APWA (2012). Manual of Best Management Practices for Stormwater Quality (Tables 4.2–4.6). https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01; MARC factsheet and Supplement. https://www.marc.org/document/apwa-5600-manual-factsheet ; https://www.marc.org/document/apwa-stormwater-standards-supplement
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, 2016 Edition, Vols 1–2. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd Edition. https://did.sarawak.gov.my/web/attachment/show/?docid=clRsMlRycU1lNnFRcnl3eDZnNkJMdz09OjpY0au0UPvQ9zUHVWRMbCKX
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- CIRIA (2015). The SuDS Manual (C753). London: CIRIA.
- PUB, Singapore's National Water Agency. Active, Beautiful, Clean Waters Design Guidelines (current edition).
- Central Ground Water Board (2007). Manual on Artificial Recharge of Ground Water. Ministry of Water Resources, Government of India.
- US Environmental Protection Agency (2022). NPDES Construction General Permit (sediment basin sizing).
- ASTM D3385. Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer.
- BRE Digest 365. Soakaway Design. Building Research Establishment, UK.
- Government of Jammu and Kashmir. Jammu and Kashmir Unified Building Bye-Laws, 2021 (as amended), chapter 10 (rainwater harvesting; Table 10-1) and S.O. 304 of 1 December 2025 (auto-scrutiny) (Chapter 7 references).
- Town Planning Organisation Kashmir (2019). Srinagar Master Plan 2035, regulation 1-7-13 and §13.3; and Jammu Master Plan 2032, §§5.1.3, 8 and 11.1 (Chapter 7 references).
- Government of Jammu and Kashmir. Jammu and Kashmir Water Resources (Regulation and Management) Act, 2010 (Act XXI of 2010), sections 2, 73, 111, 112 and 122 [section numbers TBC] (Chapter 7 references).
- Central Ground Water Board. Aquifer mapping (NAQUIM) report, Kashmir valley (March 2017); aquifer mapping report, outer plains of the Jammu province (Kandi and Sirowal); Ground Water Year Book, Jammu and Kashmir, 2021–22; district groundwater booklet, Srinagar; Dynamic Ground Water Resources, Jammu and Kashmir, 2022 (https://web.archive.org/web/20250501151330/https://www.cgwb.gov.in/old_website/GW-Assessment/GWR-2022-Reports%20State/Jammu%20_%20Kashmir.pdf) and the CGWB leaflets of 2023 and 2024 (https://www.cgwb.gov.in/cgwbpnm/public/uploads/documents/1742300087916321743file.pdf).
- Geological Survey of India (2024). Note on Preliminary Geological Assessment of Landslide at Pernote, Ramban (25 April 2024), annexed to the JKPCC compliance report of 13 September 2024 in NGT O.A. 642/2024, https://www.greentribunal.gov.in/sites/default/files/news_updates/Compliance%20Report%20by%20JKPCC%20in%20OA%20No.%20642%20of%202024%20(News%20Item%20titled%20Land%20sinking%20A%20new%20environmental%20challenge%20in%20J%20&%20K.pdf
- Jammu and Kashmir Pollution Control Committee. Response of 14 August 2024 in NGT O.A. 504/2024 (Srinagar sewage and treatment; Dal–Nigeen plants; houseboats) (Chapter 7 references); report of March 2026 in NGT O.A. 413/2025, Abhisht Kusum Gupta v. Union of India, with the CPCB's Polluted River Stretches for Restoration of Water Quality (October 2025, updated version) and the Jhelum monitoring of 2020–2025, https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20J%20and%20K%20PCC%20IN%20OA%20NO.%20413%20of%202025%20ABHISHT%20KUSUM%20GUPTA%20VS%20UNION%20OF%20INDIA%20AND%20ORS..pdf
- National Green Tribunal. O.A. 93/2023 (Thathri, Doda) and O.A. 190/2025 (Brari Nambal), as reported or quoted (secondary).
- India Meteorological Department. Station normals for Jammu and Srinagar; and Central Water Commission (1994). Flood Estimation Report for Western Himalayas – Zone 7, Design Office Report No. WH/22/1994 (Chapter 2 references).
- National Institute of Hydrology, Roorkee. NIH-DHAARA design-rainfall service, IMDAA reanalysis cells for Srinagar and Jammu (queried 13 November 2026; 24-hour values only).
- Parliament reply AU1419 on AMRUT 2.0 admissible components. https://eparlib.sansad.in/bitstream/123456789/2988692/1/AU1419_tzCIvw.pdf
Annexes and forms
| Annex / Form | Content |
|---|---|
| 8A | 3-month ARI 24-hour depth and IDF by zone |
| 8B | Redevelopment LoS table and treatment-train composite VR |
| 8C | Jammu and Kashmir BMP performance calibration |
| 8D | BMP design sheets, media specification, plant lists |
| 8E | Erosion and sediment control standard details |
| Form 8-1 | Water Quality Sheet |
| Form 8-2 | Infiltration Test Record |
Commentary. CPHEEO (2019) is the only Indian manual that covers stormwater quality in any detail. Its Chapter 9 reproduces US event mean concentrations, but cautions that "in an Indian context the values would be much higher" because drains receive night soil, urine and food waste, and it sets no Indian numeric criteria (CPHEEO 2019, Part A §9.5). Its Chapter 10 describes water-sensitive urban design, LID and SuDS treatment trains (CPHEEO 2019, Part A Ch. 10). This chapter turns that guidance into requirements. It follows the treatment approach of the MARC/APWA BMP Manual (2012), now merged into APWA 5600 (2025.01), with the Malaysian 3-month ARI water quality storm (MSMA 2, 2012) and the Georgia water quality volume (GSMM, 2016) as tropical and US benchmarks.