Draft v1.0 prepared by NEER. Not adopted by the Government of the Union Territory of Jammu and Kashmir or the Administration of the Union Territory of Ladakh, and has no legal force. About this draft

Annexes to Chapter 3Hydrologic Methods

These annexes support Chapter 3. Annex 3C sets out benchmark test problems for software acceptance, and Forms 3-1 and 3-2 are the submittal forms required by Clause 3.17. Annexes 3A, 3B, 3D and 3E need survey, gauging or published report data that this draft does not yet contain; each gives the intended layout and the interim rule of Chapter 3 that applies until it is published. The forms are draft forms and have no statutory status.


Annex 3A — Jammu and Kashmir soil series to HSG lookup; seasonal high water table map

Supports Clauses 3.7 and 3.10 of Chapter 3.

To be prepared. This annex will contain (a) a lookup from each soil series mapped in Jammu and Kashmir to its hydrologic soil group (HSG), in both the drained and the undrained state, and (b) a map of the depth to the seasonal high groundwater table in the south-west monsoon (June–September). It needs NBSS&LUP and Agriculture Production Department, Jammu and Kashmir (soil survey) [TBC] series maps with their scales, measured saturated hydraulic conductivity and depth to an impermeable layer for each series, and observation-well records from the Central Ground Water Board and the Jal Shakti Department, supplemented by piezometers in the floor of the Kashmir valley in and around Srinagar, Anantnag–Bijbehara, Pampore, Sopore, Baramulla, Sumbal and Bandipora, where water stands 0–2 m below ground over the central and south-western valley and wells flow on both sides of the Jhelum, the Sirowal of the Jammu plains round R.S. Pura, Bishnah, Arnia and Hiranagar, where water stands mostly 2–5 m below ground and wells flow, the floodplains and low terraces of the Tawi, the Chenab, the Ujh, the Basantar, the Ravi and the khads, the margins of Dal, Nigeen, Anchar, Wular, Manasbal, Hokersar and the other lakes and nambals, of Mansar and Surinsar and of the Kandi ponds and talabs, the margins of the Salal and Baglihar reservoirs and of the Tawi barrage pond at Jammu, and hill towns with perched water on unstable slopes, such as Thathri Nai Basti in Doda and Pernote and Duksar in Ramban. Until it is published, use the interim rules of Chapter 3: assign HSG from measured saturated hydraulic conductivity and depth to an impermeable layer or water table by the criteria of NEH Part 630, Ch. 7 (Clause 3.7.2); verify it by site infiltration tests wherever retention relies on infiltration (Clause 3.7.3); take the seasonal high water table from site piezometers, trial pits or the nearest observation well (Clause 3.10.2); and assign HSG D wherever that level is within 0.6 m of the ground surface (Clause 3.10.1).

Table 3A.1 — Soil series to HSG lookup (layout)

Soil series District(s) Taxonomic class Surface texture Saturated hydraulic conductivity (mm/h) Depth to impermeable layer (m) HSG, drained HSG, undrained Source map and scale
                 
                 
                 

Table 3A.2 — Seasonal high water table, by mapping unit (layout)

Mapping unit or grid cell Observation wells used Years of June–September record Highest June–September level below ground (m) Within 0.6 m of ground (Clause 3.10.1)? Data source
           
           

Annex 3B — Jammu and Kashmir CN calibration and supplementary land covers (valley-floor paddy, Karewa orchards, Kandi scrub, conifer and chir pine forest, slide scars, debris fans and muck dumps, bare rock and scree, alpine meadow and snow, boulder-bed khads, nambal reed beds, lake, talab and reservoir beds)

Supports Clauses 3.8 and 3.15 of Chapter 3.

To be prepared. This annex will contain (a) curve numbers calibrated against observed rainfall and runoff in Jammu and Kashmir catchments, compared with the TR-55 values of Table 3.5, and (b) curve numbers for land covers that Table 3.5 does not list: the paddy of the floor of the Kashmir valley and of the Sirowal of the Jammu plains, ponded behind field bunds and fed by kuhls (the "zamindari khuls" of the Water Resources Act 2010), which hold water on each field until it overtops; the orchards of the Karewa tablelands and the valley sides, often on terraces with weeded or grassed floors; the dry scrub and degraded forest of the Kandi belt and the Siwalik hills; the conifer forest of the middle hills and the valley sides, with deep litter, and the chir pine forest of the outer hills, whose needle litter sheds water; the fresh scars, slide debris and debris fans of landslides and debris flows, and the cut slopes and muck dumps of hill roads and hydro-electric projects on the Chenab and its tributaries; bare rock, scree and the skeletal soils of the steep hills; the alpine meadows and the snow and frozen ground of the high mountains; the wide boulder beds of the Kandi khads, which are dry for most of the year and lose flow to the gravels until the bed is saturated; the reed beds and marsh of the nambals and wetland reserves, such as Hokersar, Hygam and Shallabugh, which are wet at the start of most storms; and the beds of Kandi ponds, talabs, lake margins and reservoirs that are dry or drawn down at the start of a storm, such as the margins of Wular and the drawdown zones of the Salal and Baglihar reservoirs. It needs paired rainfall–runoff records for small gauged catchments of known cover and soil, from I&FC gauging sites, agricultural research stations and tank gauges, analysed by event and by antecedent moisture. Until it is published: the pre-development reference stays open space in good condition for every site (Clause 3.3.2), so these covers do not enter the pre-development run; for off-site existing conditions, use the nearest Table 3.5 or TR-55 cover row, including the cultivated rows (Clause 3.8.3(c)), and state the row chosen and the reason on Form 3-1; land under standing water at the start of the design storm is modelled as water surface with no losses (Table 3.5; Clause 3.10.4(b)). Any departure from these defaults requires calibration under Clause 3.15 (Clause 3.15.1(d)).

Table 3B.1 — Supplementary land covers, AMC II (layout)

Cover type HSG A HSG B HSG C HSG D Ia ratio Basis (catchments, events, years)
Paddy of the Kashmir valley floor and the Sirowal, ponded behind field bunds and fed by kuhls            
Orchard on the Karewas or the valley sides, with the floor recorded (weeded, grassed or mulched; terraced or not)            
Dry scrub and degraded forest of the Kandi belt and the Siwalik hills            
Conifer forest of the middle hills and valley sides, with deep litter; chir pine forest of the outer hills, with needle litter            
Fresh landslide scar, slide debris or debris fan; hill-road cut slope; road or project muck dump            
Bare rock, scree and skeletal soil of steep slopes            
Alpine meadow; snow or frozen ground at the start of the storm            
Boulder bed of a Kandi khad, dry at the start of the storm            
Nambal marsh and reed bed (Hokersar, Hygam, Shallabugh and the like), wet at the start of the storm            
Kandi pond, talab, lake margin or reservoir bed dry or drawn down at the start of the storm (Wular margins; Salal and Baglihar drawdown zones)            
Other (state)            

Table 3B.2 — CN calibration catchments (layout)

Catchment District Area (km²) Dominant HSG and cover Events used Table 3.5 CN Calibrated CN Calibrated ÷ Table 3.5
               
               

Annex 3C — Benchmark test problems for software acceptance

Supports Clauses 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 and 3.16 of Chapter 3.

Purpose. Software not listed in Clause 3.16.1 shall reproduce the results of the five problems below (Clause 3.16.3). Each problem is fully specified and uses only the methods and tables of Chapter 3, so every answer can be checked by hand. The acceptance tolerance is ±5% on each tabulated result, the equivalence threshold of Clause 3.16.2; for closed-form results (Problems 3C-1 to 3C-4), software should agree to the rounding shown. The submittal shall report the software result next to each answer below.

Illustrative — not design values. The inputs (areas, intensities, rainfall depths, slopes and the basin) are chosen for testing only. They are not design data for any site.

Problem 3C-1 — Rational Method peak (Clause 3.5)

Inputs. A 2.0 ha catchment draining to one inlet: 1.2 ha concrete paving and roofs, C = 0.90 (Table 3.2, upper half of 0.80–0.95); 0.8 ha lawns on sandy soil, average slope, C = 0.15 (Table 3.2, upper half of 0.10–0.15). Design AEP 1% (100-yr). Rainfall intensity at Tc, including the climate factor: i = 120 mm/h.

Part (b): a separate 0.5 ha fully paved catchment, C = 0.90, design AEP 1%, i = 150 mm/h.

Table 3C.1 — Problem 3C-1 solution

Step Calculation Result
Composite C (Clause 3.5.4) (1.2 × 0.90 + 0.8 × 0.15) / 2.0 0.60
Frequency factor (Table 3.3) 1% AEP Cf = 1.25
C · Cf (≤ 1.0) 0.60 × 1.25 0.75
Peak flow (Clause 3.5.1) 0.75 × 120 × 2.0 / 360 Q = 0.500 m³/s
Part (b): C · Cf 0.90 × 1.25 = 1.125, capped at 1.0 (Clause 3.5.3) 1.00
Part (b): peak flow 1.00 × 150 × 0.5 / 360 Q = 0.208 m³/s

Problem 3C-2 — Time of concentration by the segment method (Clause 3.6)

Inputs. Pre-development flow path: sheet flow over greenfield, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP 24-hour rainfall, no climate factor) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (given).

Table 3C.2 — Problem 3C-2 solution

Segment Calculation Travel time
Sheet flow (Clause 3.6.2(a)) 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h 12.83 min
Shallow concentrated (Clause 3.6.2(c)) V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h 6.78 min
Channel (Clause 3.6.2(d)) 400 / (3,600 × 1.0) = 0.1111 h 6.67 min
Tc (Clause 3.6.1; ≥ 10 min) 12.83 + 6.78 + 6.67 26.27 min
Lag (Clause 3.6.5) 0.6 × 26.27 15.76 min

Problem 3C-3 — SCS-CN runoff depth, AMC and Ia sensitivity (Clause 3.8)

Inputs. Pre-development reference on HSG C: CN = 74 at AMC II (Table 3.5), all pervious. Cumulative rainfall P = 100 mm; second case P = 25 mm.

Table 3C.3 — Problem 3C-3 solution

Case S (mm) Ia (mm) Runoff Q (mm), P = 100 mm Runoff Q (mm), P = 25 mm
(a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 89.24 17.85 39.38 0.53
(b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 38.80 7.76 64.93 —
(c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 143.31 7.17 36.49 1.97

Runoff is Q = (P − Ia)² / (P − Ia + S). Case (c) gives less runoff than case (a) at 100 mm but more at 25 mm, as Clause 3.8.5 and Figure 3.3 describe.

Problem 3C-4 — Separate vs composite impervious representation, and SCS unit hydrograph peak (Clauses 3.9 and 3.11.2)

Inputs, part (a). A site that is 50% directly connected impervious (CN 98) and 50% open space on HSG B (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.

Inputs, part (b). A sub-area of A = 2.5 km² with Tc = 1.0 h and computation interval Δt = 0.1 h.

Table 3C.4 — Problem 3C-4 solution

Step Calculation Result
(a) Impervious half (Clause 3.9.2) S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) 19.70 mm
(a) Pervious half S = 162.39 mm, Ia = 32.48 mm > P 0 mm
(a) Area-weighted runoff, separate sub-areas 0.5 × 19.70 + 0.5 × 0 9.85 mm
(a) Composite CN (Clause 3.9.4) 61 + 0.50 × (98 − 61) 79.5
(a) Runoff with composite CN S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) 1.83 mm
(b) Interval check (Clause 3.11.3(a)) 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h satisfied
(b) Lag and time to peak (Clause 3.11.2) tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 tp = 0.65 h
(b) Unit hydrograph peak, Q = 1 mm 0.208 × 2.5 × 1 / 0.65 qp = 0.800 m³/s per mm

Part (a) reproduces the comparison in the commentary to Clause 3.9 (about 9.9 mm vs 1.8 mm).

Problem 3C-5 — Level-pool (modified Puls) storage routing (Clause 3.12.1)

Inputs. A detention basin with vertical sides and plan area 500 m², with the stage–storage–discharge relationship of Table 3C.5. Triangular inflow hydrograph: 0 at t = 0, rising linearly to 0.50 m³/s at t = 30 min, falling linearly to 0 at t = 90 min. Basin empty at t = 0. Routing interval Δt = 10 min (600 s). No tailwater.

Table 3C.5 — Problem 3C-5 stage–storage–discharge relationship

Stage (m) Storage S (m³) Outflow O (m³/s)
0.0 0 0.00
0.5 250 0.05
1.0 500 0.10
1.5 750 0.15
2.0 1,000 0.20
2.5 1,250 0.25

Method. The storage-indication equation is (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2). The table gives O = S / 5,000 (S in m³, O in m³/s), so 2S/Δt + O = 17.667 O and 2S/Δt − O = 15.667 O, and each step is O2 = [(I1 + I2) + 15.667 O1] / 17.667. Software interpolating linearly in Table 3C.5 shall give the same result.

Table 3C.6 — Problem 3C-5 routed outflow

Time (min) Inflow I (m³/s) Outflow O (m³/s) Storage (m³) Stage (m)
0 0.0000 0.0000 0.0 0.000
10 0.1667 0.0094 47.2 0.094
20 0.3333 0.0367 183.3 0.367
30 0.5000 0.0797 398.4 0.797
40 0.4167 0.1226 612.8 1.226
50 0.3333 0.1511 755.7 1.511
60 0.2500 0.1670 835.2 1.670
70 0.1667 0.1717 858.6 1.717
80 0.0833 0.1664 832.1 1.664
90 0.0000 0.1523 761.5 1.523
120 0.0000 0.1062 531.1 1.062
180 0.0000 0.0517 258.3 0.517

Results. Peak outflow 0.172 m³/s at 70 min; peak storage 859 m³; peak stage 1.72 m. The inflow peak of 0.50 m³/s is reduced to 34% of its value.

Table 3C.7 — Benchmark results to be reported by the applicant

Problem Result Benchmark Software result Difference (%) Within ±5%?
3C-1 Q, main case (m³/s) 0.500      
3C-1 Q, part (b) (m³/s) 0.208      
3C-2 Tc (min) 26.27      
3C-3 Q, case (a), P = 100 mm (mm) 39.38      
3C-3 Q, case (b), P = 100 mm (mm) 64.93      
3C-3 Q, case (c), P = 100 mm (mm) 36.49      
3C-3 Q, case (c), P = 25 mm (mm) 1.97      
3C-4 Runoff, separate sub-areas (mm) 9.85      
3C-4 Runoff, composite CN (mm) 1.83      
3C-4 qp (m³/s per mm) 0.800      
3C-5 Peak outflow (m³/s) 0.172      
3C-5 Peak storage (m³) 859      

Annex 3D — Peak rate factor study for flat coastal land

Supports Clauses 3.11.5 and 3.15 of Chapter 3.

Not required in Jammu and Kashmir. Jammu and Kashmir is landlocked and mountainous, so no land in the Union Territory meets Clause 3.11.5(a), and the standard factor 484 (PRF′ = 0.208) applies to all land (Clause 3.11.5). The floor of the Kashmir valley and the Sirowal of the Jammu plains are flat, but they are not coastal plain; their slow response is represented by storage, pumping and backwater (Clauses 3.10.4, 3.12.4 and 3.13), not by a lower peak rate factor, while the hills, the Kandi and the khads respond fast. The annex and the layout of Table 3D.1 are kept only so that the annex numbering is unchanged.

Table 3D.1 — Calibrated peak rate factors (layout)

Catchment Area (km²) Mean slope (m/m) Drainage condition Events used Calibrated PRF (US customary) PRF′ (SI) Range of applicability
               
               

Annex 3E — CWC SUH parameters for zone 7, with worked example

Supports Clauses 3.4.3 and 3.11.4 of Chapter 3.

To be prepared. This annex will tabulate, for CWC zone 7 (Western Himalayas), the regression relationships for the synthetic unit hydrograph parameters, the design storm duration, loss rate, base flow, areal reduction and time distribution, each with its reference to the Flood Estimation Report, and a worked example for one catchment. It needs the one CWC Flood Estimation Report that covers Jammu and Kashmir, the Western Himalayas zone 7 report (No. WH/22/1994, November 1994), which covers the whole Union Territory, from Jammu, R.S. Pura, Samba, Kathua and Lakhanpur on the plains, all inside its isopluvial field, to Udhampur, Katra, Rajouri, Poonch, Ramban, Doda and Kishtwar in the hills and Srinagar, Anantnag, Sopore and Baramulla in the Kashmir valley, but whose unit-hydrograph relationships are not to be used in its snow-fed catchments, such as the Sind above Sonamarg, the Lidder above Pahalgam, the Kishanganga at Gurez and the Warwan, Marwah and Paddar valleys, on the floor of the Kashmir valley or for the Jhelum main stem (see the References of Chapter 3 and Annex 3E); with the zone 7 areal reduction factors for areas above 300 km² and for 24 hours, the legends and inner labels of Plates 8, 9 and 10, which are not legible on the copy read (Plate 10 is also misregistered on it), the plate readings at Kathua, Hiranagar, Rajouri and Basohli and in the closed cells over Srinagar, Sonamarg and Mahore–Gulabgarh, and the ordinates of the 1-hour representative unit graph of the Sewa hydro-electric project, which the report uses but does not print, still to be confirmed on a cleaner copy of the report or from CWC [TBC], transcribed and checked against the published reports, and a catchment with physiographic parameters measured from survey or a DEM. Until it is published, take all SUH inputs directly from the applicable Flood Estimation Report (Clause 3.11.4(a)), apply the 24-hour design rainfall of Clauses 2.3.3(b) and 2.7.3 with the climate factor of Clause 2.8 (Clause 3.11.4(b)), report the SUH result alongside the HEC-HMS or SWMM result for the existing natural condition (Clause 3.11.4(c)), and, where the hydrograph model gives a lower 1% AEP peak, either justify it by calibration under Clause 3.15 or adopt the SUH peak (Clause 3.11.4(d)).

Table 3E.1 — SUH relationships by subzone (layout)

Parameter Symbol Unit Zone 7 (Western Himalayas) relationship
Time from centre of unit rainfall to peak tp h tp = 2.498 (L·Lc/S)^0.156 (printed with S, not √S; see the note)
Peak discharge per unit area qp m³/s per km² qp = 1.048 tp^−0.178
Width of UH at 50% of peak W50 h W50 = 1.954 (L·Lc/S)^0.099
Width of UH at 75% of peak W75 h W75 = 0.972 (L·Lc/S)^0.124
Width of rising limb at 50% of peak WR50 h WR50 = 0.189 W50^1.769
Width of rising limb at 75% of peak WR75 h WR75 = 0.419 W75^1.246
Base width of UH TB h TB = 7.845 tp^0.453
Unit duration tr h 1
Design storm duration TD h TD = 1.1 tp (it gave the highest peak on all the gauged catchments)
Design loss rate — mm/h 5 (printed "0.5 cm/hr"; the observed modal value of 0.6 cm/h was judged "on higher side", and "Designers can modify this value as per local conditions"); the worked example uses 0.20 cm/h "as recommended in para 3.5", which conflicts with para 3.5 [TBC]; not for snow-fed areas; in Jammu and Kashmir, for rural SUH runs in the Jammu division only
Design base flow — m³/s per km² 0.05 (27 of 45 events in the range 0.00–0.10)
Ratio of t-hour to 24-hour rainfall — — 10-yr, from 9 self-recording gauges: 1 h 0.425; 3 h 0.600; 6 h 0.725; 9 h 0.790; 12 h 0.845; 15 h 0.895; 18 h 0.935; 24 h 1.000
Time distribution of rainfall — cumulative fraction by hour 3-h storm 0.73, 0.92, 1.00; 6-h storm 0.52, 0.69, 0.82, 0.91, 0.97, 1.00; 12-h storm 0.34, 0.49, 0.60, 0.67, 0.74, 0.81, 0.86, 0.90, 0.94, 0.96, 0.98, 1.00; 24-h storm 0.17, 0.27, 0.36, 0.43, 0.48, 0.53, 0.58, 0.63, 0.67, 0.70, 0.73, 0.76, 0.79, 0.82, 0.84, 0.86, 0.88, 0.90, 0.92, 0.94, 0.96, 0.98, 0.99, 1.00
Conversion of 1-day to 24-hour rainfall — factor 1.15
Areal reduction factor ARF % of point rainfall Annex 4.2: 50 km², 94.00 at 1 h, 96.40 at 3 h, 97.70 at 6 h, 98.25 at 12 h; 100 km², 89.00, 92.90, 95.40, 96.50; 200 km², 80.75, 86.20, 89.80, 93.50; 300 km², 74.25, 80.00, 86.20, 90.50; the worked example uses 0.926 for 3 hours at 103.6 km²; the 24-hour column and the rows above 300 km² (to 2,000 km²) not read [TBC]. The storms analysed were centred on self-recording gauges outside Jammu and Kashmir; no Jammu and Kashmir storm was used
50-yr 24-hour point rainfall at Jammu and Kashmir towns (100-yr in brackets) — mm Plate 9 (Plate 10), read by eye within about one contour: Srinagar inside a closed low below 120 (below 160), read as 120 (160) under Clause 2.3.6(c); Gulmarg about 120–160 (about 160); Baramulla and Sopore about 120–160 (below 160); Uri about 120–160 (160–200); Kupwara about 160–200 (160–200); Anantnag about 160 (about 200); Pahalgam about 120–160 (160–200); Qazigund and Kokernag about 200–240 (240–280); Banihal, Ramban and Batote about 240–280 (280–320); Reasi about 280–320 (about 320), next to a closed cell above 320 over Mahore–Gulabgarh; Katra about 240–280 (280–320); Udhampur about 240–280 (about 280); Jammu and Akhnoor about 240–280 (240–280); R.S. Pura, Bishnah and Samba about 240, on the line (220–240); Kathua and Hiranagar not resolved, 240–320 (about 240–280) [TBC]; Rajouri about 240–280 (240–320, not resolved); Poonch about 160–200 (200–240); Doda about 200–240 (200–240); Bhaderwah about 200–240 (about 240); Kishtwar about 160–200 (160–200); Sonamarg and Gurez about 200–240, in and beside a closed high cell (240–280), snow-fed
Gauged catchment in Jammu and Kashmir — — 1 of the 6 used: the Sewa at the Sewa hydro-electric project, 75°49′20″E, 32°41′10″N, Kathua district (383.00 km²; L 40.22 km, Lc 16.00 km, S 20.59 m/km); its 1-hour representative unit graph was "developed for Sewa Hydro-Electrical project" and taken into the regression, but its ordinates are not printed in Annex 3.3 [TBC]
Catchment area for which the relationships apply A km² 25–1,000; not in snow-fed catchments; in Jammu and Kashmir, not on the floor of the Kashmir valley or for the Jhelum main stem
Report reference — — §§3.3–3.6, Annexes 3.1 to 3.4, §4.4.2, Annexes 4.1 to 4.4, §6.2, worked example (pp. 24–26), Plates 8–10

Note: relationships as printed in the CWC zone 7 report (References of Chapter 3), read from a scanned copy and checked against the page images except where marked. L is the length of the main stream in km, Lc the length to the point nearest the catchment centroid in km, S the equivalent slope in m/km and A the catchment area in km². Zone 7 relates tp to L·Lc/S, printed without the square root that most subzone reports use, and the printed equations reproduce the report's own unit hydrographs only in that form. Coverage. The report was written for the four States then in the zone, Jammu and Kashmir among them, over a zone of 322,170 km² that takes in the hill basins of the Indus and Ganga systems, and its rainfall analysis drew on 40 districts, "10 in Jammu & Kashmir". All of Jammu and Kashmir is in zone 7. The contours of Plate 8 end at about 32.0–32.2°N in Gurdaspur district of Punjab, south of Kathua and Hiranagar; on Plate 9 a dashed 200 mm contour runs to the international border south-west of R.S. Pura, with Jammu about 0.2° inside it; the plates of the subzone 1(e) report do not reach the Union Territory; and Annex 4.3 lists the Jammu and Kathua districts without the mark it gives to districts partly or fully outside the zone (NEER's reading of the plates and annex). Lakhanpur, at about 32.28°N the southern tip of the Union Territory, lies inside zone 7, so no town of Jammu and Kashmir needs a cross-check against subzone 1(e). The plates cover the whole Kashmir valley, with a closed low over Srinagar. Basis. The unit hydrograph rests on only six catchments of 44–658 km² (five railway bridges and the Sewa hydro-electric project), with 2–5 years of record each in 1962–67 and 45 flood events, all near the southern edge of the zone: in the report's words they are "clustered near the border of the zone with subzone 1(e) and represent only about 1%" of it. No catchment of the Jhelum valley, the Tawi, the Ujh or the Chenab was used. The Sewa. The Sewa is the one catchment of the six in Jammu and Kashmir. Its representative unit graph is printed only as parameters (Annex 3.4): tp 4.5 h, qp 0.89 m³/s per km², a peak of 340.00 m³/s, TB 15 h, W50 2.4 h, W75 1.1 h, WR50 1.0 h and WR75 0.5 h; Annex 3.3 prints the ordinates of the five railway-bridge catchments only. For the Sewa the printed relationships give L·Lc/S = 31.25, tp ≈ 4.27 h, qp ≈ 0.81 m³/s per km², a peak of about 310 m³/s, TB ≈ 15.1 h, W50 ≈ 2.7 h, W75 ≈ 1.5 h and TD ≈ 4.7 h (NEER's computation). The regression thus reproduces the Sewa's time to peak within about 5% and its base width closely, but gives a peak about 9% below the Sewa's own unit graph and a broader hydrograph: in the one Jammu and Kashmir catchment of the report the relationships under-state the peak. Until CWC's ordinates for the Sewa are obtained [TBC], a designer using the SUH on a catchment of the Ravi side of Kathua district, of the Ujh or of the Basantar shall report the peak from the relationships increased by 10% beside the unadjusted value, and adopt the higher where the result governs (set by this Manual). The report itself warns that a design flood computed from these relations is not to be used "without verifying the results on the basis of alternate methods", and that the relations are "not to be utilised for computation of design flood in the snow fed area of the zone". Worked example. The report's example, the Banu Khad at railway bridge 629, outside the Union Territory (103.60 km², L 21.32 km, Lc 11.58 km, S 69.21 m/km), was checked for this Manual against its own equations. It prints tp = 2.5 h, which is the value of that catchment's own representative unit graph in Annex 3.4, while the equations give L·Lc/S = 3.57 and tp ≈ 3.05 h; the printed qp (0.86 m³/s per km²), TB (13.0 h) and unit-hydrograph peak (89.02 m³/s) follow 3.05 h, not 2.5 h, so the example mixes the two. With the 50-yr 24-hour point rainfall of 32.00 cm read from Plate 9, the 3-hour ratio of 0.600 and an ARF of 0.926, the areal rainfall is 17.78 cm. The example then applies a loss of 0.20 cm/h, "as recommended in para 3.5", where para 3.5 recommends 0.5 cm/h; the printed 50-yr peak of 1,365.22 m³/s follows from the 0.20 cm/h loss, and with 0.5 cm/h the same unit hydrograph gives about 1,311 m³/s, about 4% lower (NEER's recomputation). This Manual uses 0.5 cm/h and reads tp from the equations [TBC]. Use in the Union Territory. The gauged catchments have slopes of 9.9–84 m/km; the urban hill catchments of Udhampur, Katra, Ramban, Doda and Rajouri are far steeper and far smaller than 25 km², and are designed by the methods of Clause 3.4 with the rules for steep ground of the Commentary to Clause 3.7. The SUH applies to the rural khads and nallahs of 25–1,000 km² that enter the towns of the Jammu division and leave the hills of the Kashmir valley, such as the tributaries of the Tawi and the khads of the Kandi above Jammu, the Devak above Udhampur, the Basantar above Samba, the tributaries of the Ujh and the Ravi above Kathua and Hiranagar, the streams entering Akhnoor, Rajouri and Poonch, and, down to the break of slope only, the Doodhganga, the Sukhnag, the Romshi, the Vishow and the Rambiara where they leave the Pir Panjal for the Karewas; the Tawi at Jammu, the Ujh and the Basantar shall be checked against the report's range of 25–1,000 km² before it is used. It does not apply on the floor of the Kashmir valley, whose flat land drains to an embanked river and whose flows are stored by Wular, Hokersar and the flood basins, nor to the Jhelum main stem; there the catchment is modelled with storage, pumps and river stage under Clauses 3.12 and 3.13. In sub-area JK-D (High mountains and snow-fed catchments) the zone 7 SUH does not apply: catchments with snow or glacier cover, such as the Sind above Sonamarg, the Lidder above Pahalgam, the Kishanganga at Gurez, the Warwan, the Marwah and the Paddar valley, require a site-specific hydrological study, and no design there is complete without the glacial-lake-outburst, landslide-lake and debris-flow screening of Clause 2.3.6(i). Where a city catchment lies within the range, the SUH is computed only as the benchmark of its natural condition (Clause 3.11.4), and the catchment itself is designed by the methods of Clause 3.4 with the design rainfall of Chapter 2. The Jhelum, the Chenab and the Ravi are far larger than the catchments of the report and are outside Clause 3.11.4 (Clause 3.4.5); below Salal, Baglihar, Dul Hasti and Ranjit Sagar the flood is set by releases (Chapter 5). The design loss rate of 5 mm/h is a φ-index fitted to the monsoon floods of whole rural catchments of the outer hills; it is used only in rural SUH runs in the Jammu division, is not a soil infiltration capacity and is not used to assign HSG (Clause 3.7), in urban SCS-CN or SWMM models, or to size infiltration practices (Chapter 4). The ratios are not to be used to derive intensities for durations shorter than the TD of the SUH (Chapter 2): with the zone 7 ratio of 0.425 the 50-yr 1-hour depth is below about 51 mm at Srinagar, about 51–68 mm at Gulmarg and about 102–119 mm at Jammu, against largest recorded 1-hour falls of 32 mm at Srinagar (28 August 1975) and 62 mm at Gulmarg (9 September 1980) (Annex 4.4 of the report); no 1-hour record at Jammu has been found, and Clause 2.3.6 deals with the difference. At 24 hours the plates are exceeded on the outer-hill front of the Jammu division, where Jammu recorded 380 mm in the 24 hours to 08:30 IST on 27 August 2025 (IMD) and 299.2 mm on 31 July 1961, Batote 316.2 mm and Katra 292.4 mm on 25 September 1988 (IMD, Extremes … up to 2012), and Udhampur IAF 630 mm on 27 August 2025 (IMD; gauge record to be confirmed [TBC]); at high stations in winter, such as Gulmarg (293.4 mm on 20 February 1967); and they are matched or not reached in the Kashmir valley, as at Srinagar (147.8 mm on 31 January 1930) and Qazigund (206 mm in September 2014). The plate values are therefore a floor under Clause 2.3.3, not a ceiling, and Clause 2.3.6(h) decides which records count.

Table 3E.2 — Worked example outline (layout)

Step Content Clause
1 Catchment area, main stream length, length to centroid and equivalent slope, from survey or DEM 3.11.4(a)
2 SUH parameters from Table 3E.1 and the plotted unit hydrograph 3.11.4(a)
3 Design storm duration, point and areal 24-hour rainfall with climate factor, time distribution 3.11.4(a), (b)
4 Effective rainfall after the design loss rate; convolution with the SUH; base flow added 3.11.4(a)
5 1% AEP peak compared with the HEC-HMS or SWMM peak for the existing natural condition 3.11.4(c), (d)

Form 3-1 — Hydrologic Calculation Summary

Supports Clauses 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 of Chapter 3.

Draft form — Jammu and Kashmir Stormwater Design Manual, Draft v1.0. One form per submittal. Attach the documents listed in Section H.

A. Project

Table 3F.1 — Form 3-1: project

Field Entry
A1. Project name and applicant  
A2. Location (village or ward, survey numbers, district)  
A3. Site area (ha) and number of points of comparison (POCs)  
A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3)  
A5. Design Rainfall Sheet reference (Form 2-1)  

B. Method and software (Clauses 3.4, 3.11, 3.12, 3.16)

Table 3F.2 — Form 3-1: method and software

Field Entry
B1. Purpose of each calculation (conveyance, storage, comparison, catchment study)  
B2. Contributing area for each purpose (ha or km²)  
B3. Method used and the row of Table 3.1 that permits it  
B4. Reason for the choice of method  
B5. Software and version; engine and version for packages built on SWMM or HEC (Clause 3.16.1, 3.16.2)  
B6. For other software: benchmark results of Annex 3C attached (Table 3C.7) and the 5% comparison of Clause 3.16.2  
B7. Runoff transform (Clause 3.11.1)  
B8. Computation interval Δt (h), with 0.133 Tc of the smallest sub-area and the hyetograph time step (Clause 3.11.3(a))  
B9. Storage routing and channel routing methods (Clauses 3.12.1, 3.12.2)  
B10. Dynamic-wave routing required? If yes, which condition of Clause 3.12.4  
B11. CWC SUH benchmark required (25–5,000 km², Clause 3.11.4)? Result reference  
B12. Continuous simulation required (Clause 3.13.1)? Record used and starting tank levels (Clause 3.13.5)  
B13. Calibration required (Clause 3.15.1)? Calibration report reference  

C. Soils and groundwater (Clauses 3.3.3(b), 3.7, 3.10)

Table 3F.3 — Form 3-1: soils and groundwater

Field Entry
C1. HSG source map, scale and lookup used (Clause 3.7.1, Annex 3A) or NEH Part 630, Ch. 7 assignment (Clause 3.7.2)  
C2. Infiltration tests: number, locations, depths, results (Clause 3.7.3)  
C3. Seasonal high water table: depth below ground and source (Clause 3.10.2)  
C4. Areas within 0.6 m assigned HSG D (Clause 3.10.1)  
C5. Disturbed pervious areas and HSG downgrade applied (Clause 3.3.3(b))  

D. Parameters by sub-area and condition (Clauses 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)

Table 3F.4 — Form 3-1: parameters by sub-area and condition

Sub-area Condition (pre / post) Area (ha) Impervious: roofs / paved / roads (ha) DCIA (ha) Disconnected (ha) HSG CN, AMC II CN, AMC III (pervious part) C and Cf (if Rational) Tc (min)
                     
                     
                     

E. Time of concentration worksheet (Clause 3.6)

One worksheet per sub-area and condition.

Table 3F.5 — Form 3-1: time of concentration worksheet

Segment Flow type Surface and n (Table 3.4) L (m) S (m/m) P2 (mm) V (m/s) Tt (min)
1 Sheet         —  
2 Shallow concentrated       —    
3 Channel or pipe       —    
Tc (not less than 10 min)  

E1. Is the post-development Tc shorter than the pre-development Tc? If not, explain (Clause 3.6.6): ______

F. Rainfall and losses (Clauses 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)

Table 3F.6 — Form 3-1: rainfall, losses and starting levels

Field Entry
F1. AEPs and durations run; climate factor applied (Chapter 2)  
F2. AMC used for each duration (Clause 3.8.4)  
F3. Ia ratio for design runs; Ia = 0.05S sensitivity run made (Clause 3.8.5)  
F4. Peak rate factor used; if lower than 484, the Annex 3D value and the land it applies to (Clause 3.11.5)  
F5. Starting water level of each tank or waterbody, and its basis (Clauses 3.12.5, 3.13.5)  
F6. Off-site run-on: land use assumed for conveyance and for the comparison (Clause 3.3.5)  
F7. Incidental storage counted? If yes, the authority's acceptance (Clause 3.12.3)  

G. Departures

Table 3F.7 — Form 3-1: departures from Chapter 3

No. Clause departed from Value used in place of the Chapter 3 value Justification
1      
2      

H. Attachments (Clause 3.17)

Table 3F.8 — Form 3-1: attachments

Item Attached (yes / no / not applicable) Reference
H1. Catchment maps, pre- and post-development, with sub-areas, Tc flow paths, POCs and off-site run-on    
H2. HSG map, water-table data and infiltration test results    
H3. Parameter tables (Section D) and Tc worksheets (Section E)    
H4. Design Rainfall Sheet (Form 2-1) and hyetographs    
H5. Hydrograph tables and plots; stage–storage and stage–discharge tables; routed outflows; peak water levels    
H6. Form 3-2 for each POC    
H7. Calibration report (Clause 3.15)    
H8. Native model input and output files (Clause 3.16.4)    

I. Statement by the responsible engineer (Clause 3.17 item 10)

I state that the methods and parameters of Chapter 3 of the Jammu and Kashmir Stormwater Design Manual (Draft v1.0) have been used in this submittal, and that every departure is listed and justified in Section G.

Table 3F.9 — Form 3-1: statement by the responsible engineer

Field Entry
Name  
Qualification and registration number  
Organisation  
Signature  
Date  

Draft form — Jammu and Kashmir Stormwater Design Manual, Draft v1.0.


Form 3-2 — Pre- vs Post-Development Comparison

Supports Clauses 3.8.5, 3.11.5 and 3.14 of Chapter 3.

Draft form — Jammu and Kashmir Stormwater Design Manual, Draft v1.0. One form for each point of comparison (POC). Flows in m³/s, volumes in m³.

A. Point of comparison (Clause 3.14.2)

Table 3F.10 — Form 3-2: point of comparison

Field Entry
A1. POC identifier and location  
A2. Area draining to the POC: site (ha) and off-site run-on (ha)  
A3. Off-site run-on passes through site storage? (Clause 3.14.2(c))  
A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3)  
A5. Tailwater applied, including joint cases of Clause 2.12 (Clause 3.14.9(c))  
A6. Flood-sensitive only: largest 10% AEP pre-development peak over all durations, the cap of Clause 2.11.3 (Clause 3.14.7)  
A7. Flood-sensitive only: 50% AEP pre-development peak at the pre-development critical duration (Clause 2.11.3)  

B. Peak flows (Clauses 3.14.7–3.14.10)

Limit: standard catchments 0.9 × Q_pre for the same AEP and duration (Clause 3.14.10(a)); flood-sensitive catchments the caps A6 (for 1% AEP) and A7 (for 50% AEP) (Clause 3.14.10(b)).

Table 3F.11 — Form 3-2: peak flows by AEP and duration

AEP Duration (h) AMC Q_pre Q_post, uncontrolled Q_post, routed Limit Met?
50% (2-yr) 1 II          
50% (2-yr) 2 II          
50% (2-yr) 3 II          
50% (2-yr) 6 II          
50% (2-yr) 12 III          
50% (2-yr) 24 III          
50% (2-yr) 48 III          
50% (2-yr) 72 III          
10% (10-yr) 1 II          
10% (10-yr) 2 II          
10% (10-yr) 3 II          
10% (10-yr) 6 II          
10% (10-yr) 12 III          
10% (10-yr) 24 III          
10% (10-yr) 48 III          
10% (10-yr) 72 III          
1% (100-yr) 1 II          
1% (100-yr) 2 II          
1% (100-yr) 3 II          
1% (100-yr) 6 II          
1% (100-yr) 12 III          
1% (100-yr) 24 III          
1% (100-yr) 48 III          
1% (100-yr) 72 III          

C. Volumes and storage (Clauses 3.14.8–3.14.10)

Table 3F.12 — Form 3-2: volumes and storage

AEP Governing duration (h) Runoff volume, pre Runoff volume, post uncontrolled Retention volume Detention storage required Peak water level in storage (m)
50% (2-yr)            
10% (10-yr)            
1% (100-yr)            

C1. Governing duration for storage, and the 24, 48 and 72 h results (Clause 3.14.10): ______

D. Sensitivity runs (Clauses 3.8.5, 3.14.11)

Table 3F.13 — Form 3-2: sensitivity runs

Run Governing storm (AEP, duration) Change in Q_post, routed (%) Change in required storage (%) Retention volume or WQv governing (Clause 3.8.5(c))
Ia = 0.05S        
Standard peak rate factor (only where a lower factor is used)       —

E. Associated checks (Clause 3.14.12)

Table 3F.14 — Form 3-2: associated checks

Check Result Reference in submittal
Drawdown times (Chapter 4)    
Minimum orifice and trash screen (Chapter 4)    
Emergency spillway (Chapter 4)    
Outfall-closed storage check (Chapter 5)    
Downstream analysis (Chapter 5)    

F. Statement by the responsible engineer

I state that this comparison has been made by the procedure of Clause 3.14, with the same design storms in the pre- and post-development runs, and that no runoff has been diverted from one natural catchment to another to meet the criterion (Clause 3.14.2(b)).

Table 3F.15 — Form 3-2: statement by the responsible engineer

Field Entry
Name  
Qualification and registration number  
Signature  
Date  

Draft form — Jammu and Kashmir Stormwater Design Manual, Draft v1.0.