Draft v1.0 prepared by NEER. Not adopted by the Government of the Union Territory of Jammu and Kashmir or the Administration of the Union Territory of Ladakh, and has no legal force. About this draft

SupplementLadakh

Status. This Supplement is part of Draft v1.0 of the Manual. Neer prepared it as a proposal for applying the Manual in the Union Territory of Ladakh, which adjoins Jammu and Kashmir and was part of the former State of Jammu and Kashmir until 31 October 2019. Ladakh is a Union Territory without a legislature. It is administered by the President through an Administrator, the Lieutenant Governor, appointed under Article 239 of the Constitution, and its laws are regulations made by the President under Article 240 read with section 58(2) of the Jammu and Kashmir Reorganisation Act, 2019. The authority that could adopt this Supplement is therefore the Administration of the Union Territory of Ladakh. No law of the Union Territory of Jammu and Kashmir, and no body of its Government, has any part in that decision.

Not adopted. This Supplement has not been adopted, notified or endorsed by the Administration of the Union Territory of Ladakh, the Lieutenant Governor, the Ladakh Autonomous Hill Development Councils of Leh and Kargil or any new Council constituted for another district, the Municipal Committees of Leh and Kargil, the Deputy Commissioners, the Housing and Urban Development Department, the Irrigation and Flood Control Department, the Public Health Engineering (Jal Shakti) Department, the Rural Development and Panchayati Raj Department, the Ladakh Disaster Management Authority, the Ladakh Pollution Control Committee, the Wetland Authority of the Union Territory of Ladakh, or any other department or agency of the Administration, nor by the Government of the Union Territory of Jammu and Kashmir or any of its departments. Where it names a body, it describes the role that body would have if the Manual and this Supplement were adopted. It does not say the body has agreed to that role. Until the Administration adopts it, the Ladakh Building Bye-Laws, the building bye-laws for rural areas and the approval conditions in force in the Union Territory continue to apply.


S1.1 Scope

S1.1.1 This Supplement applies to the whole of the Union Territory of Ladakh, in its seven districts:

  • (a) Leh, including the area of the Municipal Committee, Leh;
  • (b) Sham (headquarters Khaltse), Nubra (Diskit) and Changthang (Nyoma), formed from Leh district;
  • (c) Kargil, including the area of the Municipal Committee, Kargil; and
  • (d) Zanskar (Padum) and Drass (Drass-Ranbirpura), formed from Kargil district.

It applies in the municipal areas of Leh and Kargil, in Halqa Panchayat areas, and to works of the departments of the Administration, subject to Clause S1.1.5 for works of Central agencies.

S1.1.2 How this Supplement works. In Ladakh, the chapters and annexes of the Manual apply as written, except as modified by Table S1.1 and Clauses S1.3 to S1.8. In particular:

  • (a) where the Manual says "the State", it means the Union Territory of Ladakh; "the State Government" and "the Government" mean the Administration of the Union Territory of Ladakh, acting through the Lieutenant Governor as Administrator; this usage is one of convenience and does not change who holds any power;
  • (b) where the Manual names a body, statute or rule of the Union Territory of Jammu and Kashmir, the Ladakh instrument or body of Table S1.1 or Table S1.2 is read in its place;
  • (c) the instruments of the Union Territory of Jammu and Kashmir that the Manual names, among them UBBL-2021, the Srinagar and Jammu master plans and the orders of its departments, do not apply in Ladakh, and neither do the rainfall zones JK-Z1 to JK-Z4 and the hydrologic sub-areas JK-A to JK-D of Annex 2A, the rules the Manual sets for them, or its river levels, gauges and pumped outfalls; and
  • (d) clause, table, annex and form numbers do not change.

S1.1.3 Values marked [TBC] are to be confirmed from the primary source before adoption. Until they are confirmed, the clause concerned states the rule that applies in the meantime.

S1.1.4 Clauses S1.3 (design rainfall), S1.4 (debris flows and outbursts) and S1.6 (groundwater) take precedence over any clause of the Manual that they contradict.

S1.1.5 Central agencies and defence land. Works of the Border Roads Organisation, the National Highways and Infrastructure Development Corporation (NHIDCL), the armed forces and other Central agencies are covered only as Clause 1.5.1(c) provides, to the extent that the Administration's approval or no-objection is required. The Ladakh Autonomous Hill Development Councils (Amendment) Regulation, 2026 protects land allotted to the Administration and to the Central Government, "including defence establishments", from the Councils' land powers (proviso to section 42(1)).

Commentary. Ladakh is the series' first cold desert. Leh receives on average 15.4 mm of rain in August, its wettest month, and its highest 24-hour fall on record is 51.3 mm (IMD). Its towns stand on fans of loose sediment at the mouths of side valleys, beside the Indus, the Shyok, the Suru and the Zanskar. Their floods come from convective cloudbursts that the gauges miss, from the debris flows those bursts set off, and from outbursts of glacial and landslide-dammed lakes; they do not come from the long storms of the plains and the outer hills on which the design rainfall of Chapter 2 rests. Most of Leh drinks shallow groundwater from the same fans into which its soak pits drain. The ground is frozen for months. The nearest analogue in the series is the hazard-first sub-area of the high and trans-Himalaya in the Himachal Pradesh edition (Kinnaur, Lahaul and Spiti), where the zone-7 relations of the CWC Flood Estimation Report are not used for snow-fed catchments, design starts with an outburst and debris-flow screening, and no work is sized to carry a debris flow or an outburst. In Ladakh every settlement is in that position, and this Supplement makes that approach the rule for the whole Union Territory.

The Lieutenant Governor approved the issue of the notification creating the five new districts on 27 April 2026 (Administration of Ladakh); the number of the notification was not found, and whether the districts are fully operational is [TBC]. The Ladakh Autonomous Hill Development Councils (Amendment) Regulation, 2026 (No. 16 of 2026, Gazette of India Extraordinary, Part II, Section 1, No. 441, 16 October 2026) defines "district" as the seven districts and gives each Council the "allotment, use and occupation of land vested in the Council" (section 23(1)(i)), "all the powers of the Panchayat at the district level" (section 23(2)), the development plan (section 32) and bye-laws made "with the approval of the Administration" (section 61). It comes into force on a date that the Administrator appoints by notification; that date, and whether Councils have been constituted for the five new districts, are [TBC]. Section 61A transfers land, staff and bye-laws from an existing Council to a new Council on the new Council's appointed day; until that day, this Supplement reads the Councils of Leh and Kargil as acting for the districts formed from them (NEER reading). Ladakh has no legislature, so no "Ladakh Act" is cited in this Supplement: its law is the law of the former State continued for it, as amended by the President's regulations, and the bye-laws and rules made under that law.


S1.2 How the Manual applies: clause-by-clause modifications

S1.2.1 The clauses of the Manual listed in Table S1.1 apply in Ladakh with the changes shown. Clauses not listed apply unchanged.

Table S1.1 — Modifications to the Manual for Ladakh

Manual clause What changes in Ladakh
1.3.1 Notification Statutory effect would be given (a) in the municipal areas of Leh and Kargil, by an amendment to the Ladakh Building Bye-Laws, 2025, made by the Administration under section 218 of the Jammu and Kashmir Municipal Act, 2000 with the publication required by section 219; and (b) in Halqa Panchayat areas, by an amendment to the building bye-laws for rural areas made under rule 155 of the Jammu and Kashmir Panchayati Raj Rules, 1996. The Councils could add bye-laws for their districts under section 61 of the Ladakh Autonomous Hill Development Councils Act, 1997, with the approval of the Administration, once the Regulation of 2026 is in force. The instruments of the Union Territory of Jammu and Kashmir do not apply.
Building rules ("UBBL-2021" throughout) Read as (a) the Ladakh Building Bye-Laws, 2025 within the notified municipal limits; the draft of 16 October 2025, which supersedes the Unified Ladakh Building Bye-Laws, 2024 (S.O. 123 of 04-11-2024), was read for this Supplement, and the final bye-laws are reported to have been notified as S.O. 121 on 20 February 2026 (as reported); their text was not read [TBC], so the clause numbers in this Supplement are those of the draft; and (b) the Ladakh Unified Building Bye-Laws Rural, 2025 in Halqa Panchayat areas, of which the draft of 9 October 2025 was read; whether they have been made final is [TBC].
1.3.2 State Stormwater Technical Committee The committee would be constituted by the Administrator, for example under the Housing and Urban Development Department, with the Irrigation and Flood Control Department, the Public Health Engineering (Jal Shakti) Department, the Ladakh Disaster Management Authority and the Councils of Leh and Kargil represented (set by this Supplement).
1.4.1 Approving Authority ("the Authority") In the municipal areas, the Municipal Committee, Leh and the Municipal Committee, Kargil: under the 2025 draft "Municipal area" is the area of the Municipal Committee (cl. 3.87), and committees of municipal and other officials may be constituted (cl. 4.5). In Halqa Panchayat areas, the Competent Authority of cl. 6 of the rural bye-laws: for an individual house (Category I), a committee chaired by the Sarpanch with the Secretary Panchayat as Member Secretary, and for other buildings (Categories II and III), a committee chaired by the Sub-Divisional Magistrate with the Block Development Officer as Member Secretary. There is no Development Authority in Ladakh (as reported, July 2026). A department of the Administration is the Authority for its own works.
1.5.3 RWH Chapter 9 of the 2025 draft, "Climate Change and Sustainable Measures in Cold Desert", provides for rainwater and snow-melt harvesting by the owner of a plot of more than 200 m² (cl. 9.1), prefers recharge for all buildings, including group housing on plots of more than 250 m² (cl. 9.1(i)), and sends the water of melting snow to the recharge system (cl. 9.1(iii)). In Ladakh these provisions are read with Clause S1.6: storage for use comes first, and only clean roof water is recharged.
1.5.4(b), 1.5.4(d) Provisions at every size Apply, with Clause S1.4: no building, wall or fill in a debris-flow corridor or active fan channel, at any size.
1.6 Tiers The Municipal Committees of Leh and Kargil, and the Competent Authorities of Halqa Panchayat areas, are Tier B authorities (set by this Supplement). The Municipal Committee, Leh may opt into Tier A under Clause 1.6.4. The Councils are not Approving Authorities; their land allotment and development plans are governed by Clauses S1.4.2 and S1.8 and Chapter 11.
1.8, 1.9 Other instruments and roles Instruments in force in Ladakh and relevant to the Manual: the Jammu and Kashmir Municipal Act, 2000; the Jammu and Kashmir Development Act, 1970 (cited in the definitions of the 2025 draft, though no Development Authority is constituted under it in Ladakh); the Jammu and Kashmir Panchayati Raj Act, 1989 and Rules, 1996; and the Ladakh Autonomous Hill Development Councils Act, 1997, as amended by Jammu and Kashmir Act No. 19 of 2018 and by Regulation No. 16 of 2026. An interim land-use framework for the municipal areas was approved on 8 July 2026 (as reported). Whether the water-resources and flood-plain statutes that the Manual cites for Jammu and Kashmir apply in Ladakh, and in what form, is [TBC]; until it is confirmed, the consents of the Irrigation and Flood Control Department required by Clause S1.5.5 are conditions set by this Supplement. Roles are as in Table S1.2.
Chapter 1 flood history and evidence The events of the Union Territory of Jammu and Kashmir are not evidence for Ladakh. Ladakh's events are in Clause S1.9.
2.3 to 2.12, Annex 2A, Annex 2B, Annex 2E Design rainfall Replaced by Clause S1.3. Ladakh is outside Annex 2A and forms the single rainfall zone L-Z1 Trans-Himalayan cold desert (set by this Supplement). The interim source of Clause 2.3.6, its ratios, plate readings and record check, NIH-DHAARA and the zone-7 synthetic unit hydrograph are not used.
2.11.4 Antecedent moisture AMC III for every design storm (Clause S1.3.7).
3.7, 3.8 Soils and CN Clause S1.3.8.
3.10 Groundwater and high water table Clause S1.6.6.
4.4, 4.11, 8.8, 8.11 Retention, infiltration and recharge Modified by Clause S1.6. The hill infiltration rule of Clause 4.11 applies in Ladakh as written, to slopes, colluvium, slide debris and moraine and above cuts and retaining walls; the valley-floor rule and the Kandi recharge rule of Clause 4.11 do not apply.
4.5.3 Flood-sensitive catchments The Jammu and Kashmir catchments do not apply. In Ladakh, the catchments of Clause S1.4.3 are flood-sensitive (set by this Supplement).
4.6, Annex 4B, Table 4.3 Detention sizing L-Z1 is not tabulated; Clause 4.6 applies, with the design storm of Clause S1.3.5.
5.6, 5.8, 5.9 Tailwater and river backwater Clause S1.5. The river levels, gauges and outfall rules of Clause 5.8.5 for the rivers of Jammu and Kashmir do not apply.
5.10, 5.12 Outfall-closed check; pumped outfalls The outfall-closed check applies where the river level of Clause S1.5.2 or S1.5.3 stands above an outfall invert. No drainage in Ladakh is pumped; Clause 5.12 applies only where a pump is proposed.
6.3.6 Debris, bulking and blockage Applies in full to every drain, culvert and channel in Ladakh, with Clause S1.4.
6.4, Table 6.1 Design AEPs Every minor-system and road-drainage element of Table 6.1 is designed for the nominal storm of Clause S1.3.3, whatever its AEP, and every check event is made as Clause S1.3.4 provides.
6.9 Major system The major system in Ladakh is the tokpo corridor, kept open as a debris-flow path under Clause S1.4; no flow is computed for a debris flow.
6.11 Floor levels The 2025 draft requires a plinth not less than 450 mm and not more than 1.5 m above the surrounding ground (cl. 8.5(1)) and a courtyard at least 150 mm above the street (cl. 8.5(2)). Clause 6.11 applies with the levels of Clause S1.5, and the higher level governs. No habitable floor shall be built in a debris-flow corridor or active fan channel mapped under Clause S1.4, whatever its plinth: a raised plinth does not protect against a debris flow (set by this Supplement).
7.4 Setbacks No statutory setback from a nallah or tokpo was found in Ladakh. The 2025 draft keeps boundary and compound walls "at least 10 m away from the bank of the river" (cl. 8.7(7)), and the rural draft says "Natural drainage not to be obstructed" (Annexure-III). Zones 1 and 2 of Clause 7.4 apply to every tokpo and fan channel, measured as Clause S1.4.4 provides (set by this Supplement).
7.10 Supply channels Yuras (irrigation channels) are protected as Clause S1.8.4 provides.
7.12 Wetlands Clause S1.8.
8.9 Sewage cross-connections Applies, with Clause S1.6.4. The 2025 draft forbids any outlet from an absorption pit to a storm or surface drain (cl. 12.5(2)) and requires absorption-pit walls at least 0.5 m above ground "to ensure that storm water does not enter" (cl. 12.5(3)).
Chapter 9 Culverts and structures Clause S1.4.6 for crossings of fans and tokpos, and Clause S1.7 for frost and ice. Clauses 9.9 and 9.10 apply only where a pump or gate is proposed.
10.4.4(c) GIS data Sites west of 78° E, including Leh, Kargil, Drass, Padum and Diskit, are in UTM zone 43N (EPSG:32643); sites east of 78° E, in much of Changthang district, are in zone 44N (EPSG:32644). A project that crosses 78° E states the zone it uses (NEER reading of the meridian; to be confirmed against Survey of India).
10.12, Figure 10.3 Maintenance calendar Apply, with Clause S1.7.6.
10.16 Post-event review Led by the Ladakh Disaster Management Authority, in place of J&K SDMA, with the Deputy Commissioner of the district. Every cloudburst, debris flow and outburst flood that damages a building or a road is mapped and recorded, as the 2010 event was in the District Disaster Management Plan of Leh, and the corridor maps of Clause S1.4.2 are revised.
Chapter 11 Basin plans The planning unit is each tokpo catchment and its fan. The basin plan begins with the hazard screening of Clause S1.4.5 and adopts the corridor map of Clause S1.4.2 before any drain is planned. The GIS master plans of Leh and Kargil are not notified (as reported, July 2026).

Commentary. The 2025 draft already contains the hooks this Supplement uses. It defines "natural hazard prone areas" as areas of significant "flood flow or inundation or landslides/mud flows … declared so by the competent authority" (cl. 3.85), which is the power Clause S1.4.2 relies on. It asks that hazard profiling of construction zones be "mandatorily carried out" under the National Disaster Management Plan, 2019, with IS codes "for Cloud bursts, Floods/Flashfloods, Avalanches" (chapter 4). It sends snowmelt drains "away from pathways in order to prevent hazards due to freeze-thaw cycles" (cl. 9.2(xi)), keeps recharge wells 10 m from any structure handling sewage (cl. 9.2(v)), forbids absorption pits where "domestic supply is taken from sub soil water" (cl. 12.3(1)), and keeps stormwater out of absorption pits (cl. 12.5). What it lacks is a design storm, any peak-flow or detention rule, any setback from a tokpo, and a map of the corridors to which its hazard power could be applied; that is the gap this Supplement fills. The interim land-use framework of July 2026 is reported to allow land of up to 2 kanals in a municipal area to be used for residential, commercial, industrial or mixed use, and to bar refusal of a proposal "solely on the ground of the non-availability of the Master Plan" (as reported). With no master plan notified, the check at building permission is the only point at which a house on a fan channel can be stopped, which is why Table S1.1 sets the corridor rule at every size. Every authority is Tier B because the two Municipal Committees are small; Leh, the larger, may opt up.

Table S1.2 — Roles in Ladakh

Body Role under the Manual and this Supplement
Lieutenant Governor (Administrator, Article 239); Chief Secretary; Administration of the Union Territory of Ladakh Would amend the bye-laws (Table S1.1, 1.3.1), constitute the committee of Clause 1.3.2 and declare the corridors of Clause S1.4.2 as natural-hazard-prone areas through the competent authority; the Lieutenant Governor chairs the Ladakh Disaster Management Authority (as reported).
Housing and Urban Development Department; Director, Urban Local Bodies; Urban Planning Would prepare the bye-law amendments under section 218 of the Jammu and Kashmir Municipal Act, 2000; would add the checks of this Supplement to the Online Building Permission System; master plans of Leh and Kargil.
Municipal Committees, Leh and Kargil Approving Authority in the municipal areas; town drains, subject to the [TBC] on drain ownership in Clause S1.4.7; anti-encroachment along tokpos, as in the Skamlung Nallah drive of 27 July 2023; compliance of septic tanks and soak pits (Clause S1.6).
Ladakh Autonomous Hill Development Councils, Leh and Kargil, and the Councils of the five new districts once constituted Allotment, use and occupation of land vested in the Council (section 23(1)(i)), district-level Panchayat powers (section 23(2)) and the development plan (section 32), once the Regulation of 2026 is in force: would keep allotments and the development plan off the corridors of Clause S1.4.2 and would be consulted on basin plans. Whether the Councils hold any power over building permission is not explicit in the Act as amended (NEER reading).
Deputy Commissioners of the seven districts (also Chief Executive Officers of the Councils); Sub-Divisional Magistrates; Block Development Officers District disaster management, warnings and evacuation; chair or serve on the rural approving committees (Table S1.1, 1.4.1); post-event mapping (Table S1.1, 10.16).
Rural Development and Panchayati Raj Department; Halqa Panchayats Rural building permission under rule 155 of the Jammu and Kashmir Panchayati Raj Rules, 1996; consent for works on yuras with the Irrigation and Flood Control Department (Clause S1.8.4).
Irrigation and Flood Control Department Custodian of nallah training, check dams and flood-protection works (as reported); yuras; consent for outfalls and works on rivers and tokpos (Clause S1.5.5); a flood-zone master plan reported to have been commissioned from a consultant, PDCOR, whose status is [TBC].
Public Health Engineering (Jal Shakti) Department, Leh and Kargil Water supply from groundwater and springs; registration of borewells under the notification of 18 April 2022; sewerage, STPs and faecal sludge treatment plants (FSTPs); water testing; frost-depth practice for buried pipes (Clause S1.7.3).
Public Works Department (Roads and Buildings) Road drains and culverts on Union Territory roads (Clause S1.4.6).
Border Roads Organisation; NHIDCL Culverts and causeways on strategic roads and national highways that cross fans; covered only as Clause S1.1.5 provides; their role under the Manual is [TBC].
Ladakh Disaster Management Authority (LDMA) Hazard maps; cloudburst and outburst warning with IMD; post-event review (Table S1.1, 10.16). Its first meeting was held on 10 February 2021 (as reported).
Ladakh Pollution Control Committee (LPCC) Consents under the Water Act for effluent and septage; enforcement of Clause S1.6.4. It was constituted on 25 March 2021 (as reported).
Wetland Authority of the Union Territory of Ladakh; Wildlife and Forest Departments Tso Moriri, Tso Kar and the other lakes of Clause S1.8; wetland notifications under the Wetlands (Conservation and Management) Rules, 2017.
IMD, Meteorological Centre Leh Rainfall records for Leh, Kargil, Drass and other stations; nowcasts and warnings; the data requests of Clause S1.3.2.
CWC No flood-forecasting site in Ladakh at last report (Clause S1.5); glacial-lake monitoring, whose coverage of Ladakh is [TBC].
CGWB Aquifer mapping and groundwater assessments of Leh and Kargil (Clause S1.6).
NHPC Operation of the Nimoo Bazgo (Indus) and Chutak (Suru) projects and their levels (Clause S1.5.3).
NDMA; the Army Response to landslide dams and outbursts, as at Phuktal in 2015 and in the rescue of 2010 (as reported).

S1.3 Design rainfall and season: replacing the design-storm approach

S1.3.1 Zone L-Z1. Ladakh is outside Annex 2A. The whole Union Territory is one rainfall zone, L-Z1 Trans-Himalayan cold desert (set by this Supplement). In L-Z1:

  • (a) no rainfall-intensity table, IDF relationship, FER plate, NIH-DHAARA value or zone-7 synthetic unit hydrograph is used to design any drain, storage or structure;
  • (b) the minor system and site storage are sized for the nominal storm of Clauses S1.3.3 to S1.3.5; and
  • (c) cloudbursts, debris flows and outburst floods are treated as siting and corridor problems under Clause S1.4, never as pipe-sizing problems. No drain, culvert, storage or other work is sized to carry a debris flow or an outburst.

The hazard-first approach that Clause 2.3.6(i) takes in sub-area JK-D (High mountains and snow-fed catchments) thus applies to the whole of Ladakh; the 1-hour floor of Clause 2.3.6(g) and the record check of Clause 2.3.6(h) do not, because they rest on gauges in Jammu and Kashmir.

S1.3.2 Data request. The first data request of this Supplement is for the IMD annual-maximum series of 24-hour rainfall, and any hourly or automatic-weather-station records, at Leh, Kargil and Drass, and at any other IMD station or automatic rain gauge in the Union Territory, with the years of record of each [TBC]. When the series for a station has been analysed and published, the Administration may set the nominal storm for the district of that station from it under Clause 1.12.

S1.3.3 Nominal storm for minor drains. Until the analysis of Clause S1.3.2 is published, every element of the minor system and every road drain and crossing listed in Table 6.1, whatever its AEP, shall be designed for a nominal storm of 51.3 mm falling uniformly in 1 hour (51.3 mm/h), with the Rational Method of Clause 3.5 within its limits (Clause 3.4.2) and a hydrograph method above them (set by this Supplement). For a time of concentration longer than 1 hour, the intensity is 51.3 mm divided by the time of concentration in hours; for a shorter one, it is 51.3 mm/h. The nominal storm applies throughout L-Z1, at Leh, Kargil and Drass alike. Where an IMD table confirms a 24-hour fall at a station in the Union Territory larger than 51.3 mm, that fall, assumed to fall in 1 hour, replaces 51.3 mm within the district of that station until the analysis of Clause S1.3.2 is published (set by this Supplement).

S1.3.4 Check events. The check events of Table 6.1, and the 1% AEP overland-path requirement of Clauses 6.3.2 and 6.4.2, are met:

  • (a) on a tokpo or fan channel, by keeping the corridor of Clause S1.4 open; no flow is computed for it; and
  • (b) on any other overland flow path, by showing that the path carries the flow of the nominal storm computed with a runoff coefficient of 0.9 for every surface, pervious or not, and with every inlet and culvert on it 50% blocked, without water entering a building (set by this Supplement; the case is that of frozen ground with drains choked by ice or debris, the condition in which Ladakh's drains are most likely to fail).

S1.3.5 Storage and the climate factor. For Chapter 4, the nominal storm is the design storm for every AEP: it is applied as a 1-hour event and as a 24-hour event of the same depth, and the criteria of Clauses 2.11.2 and 2.11.3 are checked with it (so that, in a flood-sensitive catchment, the post-development peak shall not exceed the pre-development peak for the nominal storm). The retention design depth of Clause 2.10 is 20 mm until a percentile depth is computed from the IMD daily record of Leh or Kargil [TBC] (set by this Supplement; it is more than the mean August rainfall at Leh, 15.4 mm, so a site that retains it retains almost every ordinary rain day). The climate factor of Clause 2.8 is not applied to the nominal storm (set by this Supplement), because the nominal storm already places the whole of the highest 24-hour fall recorded at Leh in a single hour; it is applied to any design rainfall set later under Clause S1.3.2.

S1.3.6 Never from the 2010 gauge value. No design depth, intensity or ratio shall be derived from the rainfall recorded at the Leh gauge on 5–6 August 2010, or from any gauge reading taken during a cloudburst (Clause S1.3.9).

S1.3.7 Season and antecedent moisture. The cloudburst season in Ladakh is June to September (LDMA; IMD). The snowmelt season, April to June [TBC] from IMD and Irrigation and Flood Control records, is a separate design case on frozen or saturated ground (Clause S1.7.5). AMC III applies to every design storm in L-Z1, in every month (set by this Supplement): in summer the bare slopes shed nearly all of a burst, and in winter and spring the ground is frozen or saturated.

S1.3.8 Soils. No hydrologic soil group mapping of Ladakh was found. Until a field test is made, every soil in L-Z1 shall be taken as HSG D (set by this Supplement). A field test made in the thawed season may place a fan gravel or valley fill in a lower-runoff group for the summer case, but the frozen-ground case of Clause S1.7.5 is always made with HSG D, and no infiltration credit is taken except as Clause S1.6 allows. Default CN values of Chapter 3 are used only with a tested group.

Commentary. IMD's note on the cloudburst of 6 August 2010 gives the August normal at Leh as 15.4 mm and "the highest rainfall ever recorded over Leh during 24 hours period" as 51.3 mm on 22 August 1933, and describes Ladakh as a cold desert "not known to be frequently affected" by cloudbursts. The annual normal is given as less than 100 mm in the CWC zone-7 report and as 40–70 mm in the District Disaster Management Plan of Leh (2011-12); the two are not reconciled [TBC]. The zone-7 report's study area, longitudes 73° to 81° E and latitudes 29° to 37°30′ N, takes in Ladakh, and it notes the low rainfall of Leh, but its gauged catchments lie in the outer Himalaya far to the south, its synthetic unit hydrograph is "not to be utilised" in the snow-fed area, and whether its plates cover the Indus, the Shyok and the Zanskar has not been checked against the report's plates [TBC]. That is why Clause S1.3.1 does not use it. The nominal storm of Clause S1.3.3 is a deliberate overstatement of the record, not a frequency estimate: it takes the largest day in about ninety years at Leh and assumes it all falls in one hour. Even so it sizes nuisance drainage only. The rain that caused the 2010 disaster was not measured: the Indian Air Force observatory at Leh recorded 12.8 mm in the 24 hours to 05:30 IST on 6 August 2010 (IMD), while the burst was reconstructed at at least 150 mm/h over Leh (Hobley, Sinclair and Mudd, 2012, as reported in a secondary source; the paper was not read). NCMRWF's high-resolution simulation of the event produced only about 4 cm in three hours at its wettest point (NCMRWF, 2010, paraphrased). Neither the gauge nor the model saw the design event, which is why Clause S1.3.6 forbids using the gauge value and Clause S1.4 handles the event by siting. Later falls are of the same order as the nominal storm or below it: in August 2025 Leh recorded 80.2 mm for the month, the highest in 52 years, with a wettest day of 37 mm, and Kargil 33 mm in 24 hours (as reported); on 8–9 July 2023 Ladakh received 19.1 mm against a normal of 0.1 mm (as reported). The 46.4 mm (1995) and 45.2 mm (2006) "highs" quoted in the press for Leh may be daily or monthly totals and are not used [TBC]. The retention depth of 20 mm and the roof store of Clause S1.6.3 are set together, so that the store holds the retention depth from its roof.

S1.3.9 Cloudbursts. IMD's note on the Leh event describes a cloudburst as a fall at a rate that "may be of the order of 100mm per hour" over a localised area. No design rule is drawn from the term, and no design depth is set to match a cloudburst. A burst over a side valley in Ladakh does its damage through the debris flow it sets off on bare slopes of loose sediment, which Clause S1.4 keeps out of buildings by siting; a drain cannot carry it.


S1.4 Debris flows, tokpos and outburst floods

S1.4.1 Tokpos are the major system. A tokpo (side-valley stream or nallah, Clause S1.8.5) that crosses or borders a settlement shall be kept open along its whole course through the settlement (set by this Supplement):

  • (a) it shall not be culverted, covered, built over or narrowed, except at a road crossing designed under Clause S1.4.6;
  • (b) no plantation shall be made in the bed of a tokpo or on land next to it within the corridor of Clause S1.4.2, following the District Disaster Management Plan of Leh ("Not allowing plantations in the nallah bed, near nallah"); trees already standing in the bed may be removed by the Authority, as in the Skamlung Nallah drive of 2023; and
  • (c) no solid waste, construction debris or excavated material shall be placed in it or on its banks.

S1.4.2 Corridor map. The Authority, with the LDMA and the Irrigation and Flood Control Department, should map for every settlement the active debris-flow paths, active fan channels and flash-flood paths, including every channel that carried a flow in 2010 or since, and should have them declared as natural-hazard-prone areas under cl. 3.85 of the 2025 draft (as the competent authority's declaration it provides for). One candidate method is the susceptibility mapping of the Leh valley by Sharma et al. (2022), which combines connectivity, flow-routing and weights-of-evidence models. Until a map is adopted for a settlement, the designer shall map the corridor for the site and its surroundings from the field, from the imagery of the events of Clause S1.9 and from the records of the Authority and the LDMA, and show it in the drainage report (set by this Supplement).

S1.4.3 Flood-sensitive catchments. The following are flood-sensitive catchments for Clause 4.5.3 and Chapter 11 in Ladakh (set by this Supplement):

  • (a) the catchments of the nallahs that the District Disaster Management Plan of Leh lists as most vulnerable to cloudburst and flash flood, among them the Leh Nallah from Gabglies to Spituk, and the Saboo, Igoo, Phyang, Taru, Nimoo, Ney–Basgo, Tia–Temisgam, Shila–Wanla, Kungam, Anlay, Tingang, Trishi, Chamshen, Tyakshi, Bogdang, Diskit, Turtuk, Hunder, Lungdo and Taksha nallahs and the Murgi nallah at Nungstate (the first five items of the list are not legible in the copy read [TBC]);
  • (b) the Skamlung Nallah in Leh, which flooded in July 2023, and the Leh Nallah and the Shenam nallah, which the status report of Clause S1.6 names as the main drains of Leh town;
  • (c) every other catchment with a corridor mapped under Clause S1.4.2 through a settlement; and
  • (d) the catchments of Kargil and the other towns of the Kargil, Zanskar and Drass districts that the Authority lists once their events are dated (Clause S1.9; [TBC]).

S1.4.4 Setbacks on tokpos and fans. Clause 7.4 applies to every tokpo and fan channel, with these changes (set by this Supplement):

  • (a) Zone 1 is measured from the outer edge of the corridor mapped under Clause S1.4.2, not from the low-flow channel or the top of its bank, and extends not less than the minimum of Clause 7.4.7 (15 m) beyond it;
  • (b) the whole of the mapped corridor is in Zone 1, which is a no-build zone: no building, compound wall, fill, storage facility or stormwater facility other than a crossing under Clause S1.4.6 or a training work of the Irrigation and Flood Control Department is placed in it;
  • (c) where no corridor has been mapped, Table 7.1 applies with the "channel draining more than 20 km², and rivers" row (50 m, of which 20 m is Zone 1) for every tokpo whose fan holds a settlement, measured from the edge of the active fan channel; and
  • (d) on a river, the 10 m boundary-wall setback of cl. 8.7(7) of the 2025 draft is the statutory minimum, and Zone 1 governs where it is wider (Clause 7.4.5).

S1.4.5 Outburst screening. No basin plan, and no drainage report for a site with a glacier, a glacial lake, a moraine- or landslide-dammed lake or a landslide-prone gorge in the catchment above it, is complete without a screening for glacial-lake outbursts, landslide-dam breaches, ice-dam floods and debris flows recorded in the report. It identifies the lakes, dams and fans upstream from the glacial-lake inventories, the LDMA's hazard maps and CWC's glacial-lake monitoring where they cover the site [TBC], and states whether the site lies on their flow path. Where it does, the siting, setback and floor-level rules of this Supplement and of Chapters 6 and 7 govern, and the outburst sets the tailwater case of Clause S1.5.4; it never sets a pipe size (set by this Supplement).

S1.4.6 Crossings of fans and tokpos. A road or path that crosses an active fan or a tokpo shall cross it by a vented causeway, a ford or a culvert or bridge sized under Clause 6.3.6 for debris and blockage, and debris racks or basins, where provided, shall be placed upstream of the crossing and not at the inlet (set by this Supplement). Crossings by the Border Roads Organisation and NHIDCL are covered as Clause S1.1.5 provides; their design practice on fans is [TBC].

S1.4.7 Drain ownership. Who owns and maintains the town drains of Leh and Kargil, as between the Municipal Committee, the Public Works Department and the Irrigation and Flood Control Department, is [TBC]. Until it is confirmed, the Municipal Committee is taken as owner of drains within its area that are not part of a tokpo, and the Irrigation and Flood Control Department as custodian of the tokpos and their training works, and the Authority shall record the response of both to every drainage report that affects a tokpo.

Commentary. In 2010 the destruction in Leh district came from "the rapid movement of huge volumes of water charged with mud, boulders, trees, building debris and other objects" off slopes "covered in loose, unconsolidated deposits". At Choglamsar the debris flow travelled about 10 km from near Saboo and spread up to 2 km wide; in Leh it travelled about 3 km, from 3,800 m to 3,410 m, down the catchment of the Shakshaling stream, destroying settlements and the bus stand (District Disaster Management Plan, Leh). Sharma et al. (2022) find the Leh valley "affected almost annually by debris flows", with rare, extensive flows formed where drainage networks integrate "in an open fan area". A drain or a culvert does not survive such a flow, and a raised plinth does not protect a house in its path. The only protection is to keep buildings, walls and fill out of the paths the flows take and to keep those paths open, which is what Clauses S1.4.1 to S1.4.4 require. The DDMP's own measures were "Construction of Checkdams", "Nallah training" and "Not allowing plantations in the nallah bed, near nallah". In July 2023, after "flash floods from the overflowing nallah", the Council, the District Administration and the Municipal Committee cleared the Skamlung Nallah in Leh of encroachments and removed "over 200 trees" that hindered its flow (Administration of Ladakh); no distance rule was stated, which Clause S1.4.4 supplies. The 15 m minimum of Zone 1 is the Manual's; the 50 m fixed width for a tokpo with a settlement on its fan, until a corridor is mapped, is set by this Supplement because the 2010 flows spread far beyond the channels.

Outburst floods are not driven by rain at any gauge. The Gya glacial lake, at about 5,300 m, grew from about 0.03 to 0.08 km² between 1969 and 2014 and burst in 2014, destroying terraces, a new bridge and two houses (as quoted in a conference abstract, EGU 2016); a hydraulic model of the event gave a peak of about 470 m³/s (as reported, source not identified) [TBC]; Schmidt et al. (2020) note that the lake had been "overlooked in inventories". On the Phuktal river in Zanskar a landslide dammed the valley at about the end of 2014 and the lake breached on 7 May 2015, damaging bridges and a school downstream; its volume is reported variously as about 24 to more than 30 million m³, and the Army and NDMA cut a channel through the dam in April 2015 (as reported). On the Shyok, ice dams of the Chong Kumdan glacier burst in 1926, 1929 and 1932 (as quoted in the Himalayan Journal), and sixteen outbursts from the Kumdan glacier group since 1835 are counted in a recent abstract (as quoted, EGU 2026). An inventory of 2018 counted 192 glacial lakes in Ladakh, 127 of them proglacial, and a Kargil inventory 85 proglacial lakes in contact with a glacier (as quoted in conference abstracts, EGU 2023 and 2024) [TBC]. These events set where not to build and the river levels of Clause S1.5; they set no pipe size.


S1.5 Rivers and tailwater

S1.5.1 Receiving waters. The receiving waters of Ladakh's towns are the Indus (Leh, Choglamsar, Nimoo–Basgo, Khaltse), the Shyok and the Nubra (Diskit, Hunder, Turtuk), the Suru (Kargil), the Zanskar and its tributaries (Padum), and the Drass and the Shingo (Drass). CWC has no flood-forecasting site in Ladakh: "Presently there is no site functioning in Ladakh" (as reported, SANDRP, 2022). No danger level, warning level or high flood level is published for any river in the Union Territory.

S1.5.2 Design river level. Until a level is published [TBC], the river level used for Clauses 5.6, 5.8 and 6.11.2 at an outfall shall be the highest of (set by this Supplement):

  • (a) the highest flood mark surveyed at or near the outfall from the events of 2010, 2015, 2023 and 2025 and any later event, with the source of each mark stated on Form 5-1;
  • (b) the level of the river at its snowmelt peak in July and August, the months of the cloudbursts, from surveyed marks or the records of the Irrigation and Flood Control Department or NHPC, because a burst over a side valley meets a river already high with melt (NEER reading); and
  • (c) a level from a hydraulic model of the reach under Clause 5.8.2(b), where one is made.

Where none of (a) to (c) is available for a plot below the Chapter 1 thresholds, Clause 6.11.3 applies.

S1.5.3 Projects. On the Indus near Alchi and on the Suru, the operating levels and spillway records of NHPC's Nimoo Bazgo (45 MW, on the Indus at Alchi) and Chutak (44 MW, on the Suru) projects (as reported) shall be included under Clause 5.8.3 where the reach is affected; the levels are [TBC], and until they are known the reach is analysed under Clause S1.5.2.

S1.5.4 Outburst tailwater. Where the screening of Clause S1.4.5 finds a lake or dam whose outburst would reach the river at the outfall, the outfall shall be checked against the river level of that outburst, estimated by a method agreed with the Authority and the Irrigation and Flood Control Department, with a non-return valve or a raised outfall where the check fails (set by this Supplement). No drain is enlarged for it.

S1.5.5 Consent. Every outfall to a river or a tokpo, and every wall, embankment or training work in or on one, shall be referred to the Irrigation and Flood Control Department, whose consent shall be recorded before approval (set by this Supplement; its statutory basis in Ladakh is [TBC], Table S1.1, 1.8).

Commentary. The Indus is high with snowmelt in July and August, the same months in which cloudbursts occur (NEER reading), so an outfall checked only against the river's low autumn level will be drowned when it is needed. No river level is published because CWC had no functioning site in Ladakh at last report (as reported, 2022); whether one has been added since, and the high flood level of the Indus at Leh (Choglamsar and Spituk), are [TBC]. Surveyed marks of the known events are therefore the only levels available. During the Phuktal crisis of 2015 a risk to the Nimoo Bazgo project downstream was reported (as reported), which is why outbursts are part of the tailwater check.


S1.6 Groundwater, infiltration and rainwater harvesting: roof water only over the Leh aquifer

S1.6.1 Roof water only. Where groundwater or a spring is drawn for drinking within 500 m of the site, which includes the whole of the municipal area of Leh, only clean roof water shall be led into a recharge well, soakaway, infiltration trench or other infiltration facility (set by this Supplement; the distance is the Supplement's, pending the aquifer maps of Clause S1.6.6). Runoff from roads, parking, yards, animal pens and fuel areas shall not be infiltrated there: it shall be conveyed at the surface, through a sediment trap, to a tokpo or river under Clause S1.5.5.

S1.6.2 Separations. In addition to Clause 8.8 (set by this Supplement, except as stated):

  • (a) a recharge well shall be at least 10 m from any structure handling sewage or industrial wastewater, such as a septic tank or effluent treatment plant (2025 draft, cl. 9.2(v));
  • (b) no absorption pit shall be allowed where domestic supply is taken from sub-soil water (2025 draft, cl. 12.3(1)); in Ladakh this Supplement reads every settlement whose drinking supply comes from wells, borewells or springs, including Leh town, as such an area (NEER reading);
  • (c) a septic tank or absorption pit shall be at least 60 m from any percolation well, watercourse or stream used or likely to be used for drinking or domestic purposes, unless a hydrogeological report accepted by the Authority shows that a smaller distance protects the source, and then not less than 16 m; and
  • (d) no recharge well or soakaway shall be placed within the corridor of Clause S1.4.2.

S1.6.3 Storage for use first. The rainwater and snow-melt harvesting of cl. 9.1 of the 2025 draft shall be provided first as roof-water storage for use, with a store of not less than 20 L per m² of roof (set by this Supplement), protected from frost under Clause S1.7.2. Only the overflow of the store may go to a recharge well, and only under Clauses S1.6.1 and S1.6.2. Clauses 4.11 and 8.11.5 apply: the store is assumed full at the start of every design storm and is not counted as detention.

S1.6.4 Sewage and stormwater. Clause 8.9 applies. Where no sewer is available, the on-site system shall meet Clause S1.6.2 and cl. 12.5(2) and (3) of the 2025 draft, and no overflow or effluent from it shall be led to a storm drain, a tokpo, a yura or a recharge structure.

S1.6.5 Snow-melt. The draft's direction that "the water of melting snow should flow to the ground water recharge system" (cl. 9.1(iii)) applies only to melt from roofs and from clean open space, and only under Clause S1.6.1; melt from roads and yards is surface runoff under Clause S1.7.5.

S1.6.6 Water table. For Clause 3.10, the seasonal high water table shall be taken as the highest level recorded from May to September, when the rivers are high, and on valley floors and terraces within 100 m of a river or a spring (chumik) as ground level unless measured (set by this Supplement). The aquifer maps of CGWB for Leh are [TBC].

Commentary. Leh drinks groundwater. The status report of the Deputy Commissioner and Chief Executive Officer of the Council, Leh to the National Green Tribunal (O.A. 206 of 2023, 28 March 2023) records 927 borewells in Leh town, including those of the defence establishments, at 31 December 2022, and the registration of borewell users under the Union Territory's notification of 18 April 2022. It records that the 48 km sewer network is "just 30% of total required sewer network", that 2,884 of 6,820 households are connected to the 3 MLD plant at Agling, that the rest use septic tanks and soak pits, whose septage goes by suction truck to a 12 KLD FSTP, and that "Disposal of untreated waste (sewage) directly into Ground (through soak pit) could be the reason for ground water contamination which needs further investigation". Kargil has no sewer and a 10 KLD FSTP (the same report). Nitrate in Leh's wells is reported as 60 mg/L in one account and as "approaching the WHO limit of 50 mg/L in some cases" in another (both as reported); the two conflict and neither is a primary measurement. CGWB is reported, in material seen only in summary, to find the groundwater unconfined in valley fill, at depths from very shallow to 45 m "related to river water level" (as quoted in a CGWB presentation of 2020) [TBC]. The plains rule of putting as much water into the ground as possible is unsafe here: road and yard runoff carries fuel, dung and silt into the same fan gravels from which the town drinks, and every soak pit is a source of the contamination the Tribunal is examining. Clause S1.6.1 therefore keeps infiltration to clean roof water. The 2023 draft bye-laws kept septic tanks 60 m from a drinking-water well or watercourse; the 2025 draft reduces this to 16 m (cl. 12.4(1)(iii), checked on the page image). Whether the final bye-laws keep 16 m is [TBC], and the draft gives no reason for the change. With most of Leh on soak pits over its drinking aquifer, this Supplement keeps the larger distance unless a hydrogeological check supports less. Rainwater harvesting yields little: at 40–100 mm a year, a 100 m² roof collects about 4–10 m³ a year before losses (NEER arithmetic), so the store of Clause S1.6.3 is a small seasonal supply and a snow-melt store, not a source of recharge.


S1.7 Freeze–thaw and snowmelt

S1.7.1 No permanent wet pools. No wet pond, permanent pool or wetland treatment cell shall be designed in Ladakh. Detention basins shall be dry, with outlets that drain them completely before the first freeze, and shall be empty through the winter (set by this Supplement).

S1.7.2 Ice. Inlets, outlets, orifices and gratings shall be protected from ice, by placement out of drifting snow, by covers or by heating where power is available, and shall be shown on the O&M plan of Clause 10.11 with their winter checks. Open channels shall be designed with an allowance for ice in the freeboard, stated in the drainage report [TBC] (set by this Supplement).

S1.7.3 Frost depth. Buried stormwater pipes shall be laid with their crown below the frost depth. The frost depth for each town is [TBC] from the practice of the Public Health Engineering Department and the Public Works Department and the relevant IS code. Until it is confirmed, the cover shall be not less than that to which the Public Health Engineering Department lays water mains in the same town, stated on the drawings; where that is not known, open or covered channels designed under Clause S1.7.2 shall be used in place of buried pipes (set by this Supplement).

S1.7.4 Snowmelt drains. Snowmelt drains shall be led away from pathways, as cl. 9.2(xi) of the 2025 draft requires "in order to prevent hazards due to freeze-thaw cycles", and no roof, terrace or yard outlet shall discharge onto a footpath, road or neighbouring plot. Snow cleared from roads and roofs shall be stored where its melt drains to a drain or tokpo and not across a path or into a building.

S1.7.5 Snowmelt-on-frozen-ground check. Every drainage report shall show that melt and rain in the snowmelt season of Clause S1.3.7, running off frozen ground with every inlet and culvert 50% blocked by ice, reaches a drain, tokpo or river without crossing a pathway or entering a building (set by this Supplement). The melt rate for the check is [TBC]; until it is set, the check is made as a flow-path check, with the nominal storm of Clause S1.3.3 on frozen ground (runoff coefficient 0.9) where a flow is needed.

S1.7.6 Maintenance calendar. Clause 10.12 and Figure 10.3 apply, with the pre-monsoon date of 31 May, readiness by 15 June and standby to 31 October. In addition, inlets, culverts and fan channels in settlements shall be cleared of ice, snow and debris by 30 April, before the snowmelt season, and every channel and crossing affected by a debris flow shall be cleared within the time set by the Authority after the event (set by this Supplement).

S1.7.7 Structures. Retaining walls, embankments and other structures of a stormwater facility shall be designed for the snow loads of Annexure-II of the rural draft (2.0, 3.0 and 4.5 kN/m² for altitudes of 3,000–3,500, 3,501–4,000 and more than 4,000 m) where they carry snow. The rural draft (Annexure-I) puts all buildings in IS 1893 Zone V, while the District Disaster Management Plan of Leh (2011-12) places Leh district in Zone IV. Until the zone is confirmed [TBC], structures of a stormwater facility shall be designed for Zone V (set by this Supplement, the stricter of the two).

Commentary. Minimum temperatures in Leh district fall to about −40 °C (District Disaster Management Plan, Leh). A pool or basin that holds water into winter freezes solid, splits its lining and outlet, and stays blocked into the snowmelt season, when it is needed; that is why Clause S1.7.1 forbids permanent pools. The snowmelt season of April to June is the Supplement's working assumption from the climate of the region and is to be confirmed [TBC]. No frost-depth value for Ladakh was found for this draft, which is why Clause S1.7.3 relies on local practice for water mains.


S1.8 Waterbodies and local terms

S1.8.1 Ramsar sites. Tso Moriri (Ramsar site No. 1213, designated 19 August 2002, 12,000 ha) and the Tso Kar Wetland Complex (No. 2443, designated 17 November 2020, 9,577 ha, of which the hypersaline lake is about 1,800 ha, in the Changthang Cold Desert Wildlife Sanctuary) are Wetlands of International Importance (as listed by the Ramsar Sites Information Service, seen only in summary; areas [TBC] against the Ramsar list). Pangong Tso is not a Ramsar site; no listing was found. Clause 7.12 applies to all three lakes and to Tso-Rul and the other lakes the District Disaster Management Plan of Leh lists, and no drain from a road, camp or settlement shall discharge to them without the treatment of Chapter 8 and the consent of the Wetland Authority of the Union Territory of Ladakh (set by this Supplement).

S1.8.2 Wetland Authority. The Wetland Authority of the Union Territory of Ladakh, under the Wetlands (Conservation and Management) Rules, 2017, held its first meeting in September 2021 (as reported). Its constitution notification, and any wetland notified under the Rules in Ladakh, are [TBC].

S1.8.3 Village waterbodies. Zings (village ponds) are waterbodies under Clause 7.3 and receive the setbacks of Clause 7.4. Whether a zing in Ladakh is a holding pond on the yura system is [TBC]; where it is, Clause S1.8.4 applies to it as well.

S1.8.4 Yuras. A yura (irrigation channel) is a supply channel under Clause 7.10. No storm drain shall discharge into a yura, and no yura shall be used as a storm drain, without the consent of the Irrigation and Flood Control Department and of the Halqa Panchayat concerned (set by this Supplement), because a yura carries water for irrigation and, in many villages, for domestic use.

S1.8.5 Local terms. The terms below are used in this Supplement. The meanings are those of Jäschke's Tibetan-English Dictionary (1881), which gives the classical spellings; the romanised Ladakhi forms are the customary ones and were not checked in a Ladakhi dictionary, and the Tibetan script is written from the classical spelling. A Ladakhi-speaking reviewer should confirm both [TBC].

Table S1.3 — Local terms

Term (Ladakhi, as commonly romanised) Tibetan script; classical spelling Meaning (Jäschke, 1881) Use in this Supplement
tokpo གྲོག་པོ; grog po "a deep dell, ravine, lateral valley" the stream or nallah of a side valley; the regulated watercourse of Clause S1.4
yura ཡུར་བ; yur ba "aqueduct, conduit, water-course, ditch" an irrigation channel, protected under Clause S1.8.4
zing རྫིང; rdzing "pond" a village pond, a waterbody under Clause S1.8.3
chumik ཆུ་མིག; chu mig "spring, fountain" a spring; ground level is the water table near it (Clause S1.6.6)
tso མཚོ; mtsho lake a lake, as in Tso Moriri and Tso Kar

Commentary. The village water official who times the delivery of water and maintains the channels, the churpon, is described in secondary sources (as reported); his consent is not made a condition because his role is customary and varies from village to village.


S1.9 Event evidence

Commentary. August 2010. Cloudbursts struck on the night of 4–5 August at Ney, Nimoo and Basgo, and on the night of 5–6 August at Leh, Choglamsar, Saboo and Phyang (District Disaster Management Plan, Leh). IMD placed the Leh burst around 01:30–02:00 IST on 6 August, from "an intense convective cloud clusture" that formed east of Leh by 21:30 IST on 5 August. Seventy-one villages and about 9,000 people were affected; the DDMP records about 233 lives lost, 424 people injured and about 79 still missing, while other accounts give "at least 255" dead and estimates of more than 600 (as reported). The toll is therefore given as a range: 233 recorded dead, about 312 if the 79 missing are counted (NEER arithmetic), and higher in some estimates. The debris flows are described in Clause S1.4 and the rainfall in Clause S1.3. Other cloudbursts. The LDMA lists similar events causing "low-intensity flooding and mudslides" in 2006, 2012, 2016 and 2018 (as quoted on its website) [TBC]. 2014–2015. The Gya outburst (2014) and the Phuktal landslide-dam breach (7 May 2015) are described in Clause S1.4. July 2023. Heavy rain on 8–9 July (Clause S1.3) was followed in Leh by flash floods from the Skamlung Nallah and the clearance of 27 July 2023 (Clause S1.4). August 2025. Leh recorded its wettest August in 52 years and Kargil 33 mm in a day (as reported), and the Council, Kargil assessed areas affected by cloudbursts in a notice of 18 August 2025 (as reported). Kargil. Flash floods at Sangra and Khangral, Drass and Holiyal, and Pashkum and Khawos are reported without dates [TBC]. These records are evidence only and are not design values (Clause 2.3.4(c)).


To be confirmed

The following are needed before this Supplement could be adopted. Each is followed by the rule that applies until it is confirmed.

  1. Final Ladakh Building Bye-Laws, 2025 (reported as S.O. 121 of 20 February 2026): whether cl. 3.85, 8.5, 8.7(7), 9.1, 9.2, 12.3, 12.4 (16 m) and 12.5 of the draft survive. Until then, the clause numbers of the draft are used, and the 60 m distance of Clause S1.6.2(c) applies.
  2. Rural bye-laws: whether the draft of 9 October 2025 was made final after its comment period (10 October to 10 November 2025). Until then, the Competent Authority of the draft is read as the Approving Authority in Halqa Panchayat areas (Table S1.1, 1.4.1), under the rural rules in force.
  3. Regulation No. 16 of 2026: the date of commencement, whether Councils have been constituted for the five new districts, and whether building permission is delegated to the Councils. Until then, the Councils of Leh and Kargil act for the districts formed from them, and the Councils are not Approving Authorities (Table S1.2).
  4. District notification of 27 April 2026: its number and the operational status of the new districts. Until then, Clause S1.1.1 lists the seven districts as approved, and every rule of this Supplement applies in the same way in each.
  5. Nallah setbacks: any order of a Council or a Deputy Commissioner after 2010 or 2023 fixing a distance from a nallah. Until one is found, Clause S1.4.4 applies; a wider order, if found, governs under Clause 7.4.5.
  6. IMD records: annual-maximum series and normals for Leh, Kargil and Drass; whether the annual normal at Leh is about 100 mm or 40–70 mm; whether the 46.4 mm (1995) and 45.2 mm (2006) "highs" are daily or monthly. Until then, the nominal storm of Clause S1.3.3 and the retention depth of Clause S1.3.5 apply.
  7. Rainfall of 2010: the papers of Hobley et al. (2012) and Thayyen et al. (2013), and the "250 mm" and "356 mm in two hours" figures quoted in the press and in a snippet. Until they are read, no figure for the 2010 burst is used for design (Clause S1.3.6).
  8. CWC zone-7 coverage: whether the plates of the zone-7 report extend over the Indus, the Shyok and the Zanskar in Ladakh (Plate 1). Until then, the zone-7 report is not used (Clause S1.3.1).
  9. CWC sites: whether a flood-forecasting site has been added in Ladakh since 2022, and whether CWC's glacial-lake monitoring covers Ladakh's lakes. Until then, Clause S1.5.2 applies.
  10. CGWB: the aquifer mapping of 2022 for Leh and the district brochure. Until they are read, Clause S1.6.1 applies within 500 m of every drinking source, and Clause S1.6.6 sets the water table.
  11. Kargil events: the dates of the flash floods of Sangra and Khangral, Drass and Holiyal, and Pashkum and Khawos. Until they are dated, Clause S1.4.3(c) applies to the corridors mapped in those valleys.
  12. Frost depth, pipe cover and snow storage practice of the Public Health Engineering and Public Works Departments in Leh and Kargil, and the melt rate for Clause S1.7.5. Until then, Clauses S1.7.3 and S1.7.5 apply.
  13. Ladakhi terms: the pronunciation and usage of tokpo, yura, zing and chumik, from a Ladakhi dictionary or a Ladakhi-speaking reviewer. Until then, the meanings of Table S1.3 are used.
  14. Seismic zone: Zone V (rural draft) or Zone IV (DDMP, 2011-12). Until then, Zone V applies to stormwater structures (Clause S1.7.7).
  15. Irrigation and Flood Control Department: the status of the flood-zone master plan reported to have been commissioned from PDCOR, and of its flood-management schemes for Leh and Kargil. Until then, Clause S1.4.2 sets the corridors.
  16. Drain ownership in Leh and Kargil, as between the Municipal Committees, the Public Works Department and the Irrigation and Flood Control Department. Until then, Clause S1.4.7 applies.

References