Annexes to Chapter 8Water Quality and Recharge
These annexes support Chapter 8. They give the layout of the water quality rainfall tables, the Level of Service and Value Rating method in detail, the layout of the BMP calibration programme, design sheets for each BMP, standard details for construction erosion and sediment control, and the two forms that Clause 8.14 requires. Annexes 8A and 8C need data that are not yet available; they say so and give the rule to use in the meantime. The forms are draft forms.
Annex 8A — 3-month ARI 24-hour depth and IDF by zone
Supports Clauses 8.2, 8.4.1 and 8.4.5 of Chapter 8.
To be prepared. This annex will contain, for each rainfall zone of Chapter 2, the 24-hour 3-month ARI depth P_3m and the 3-month ARI intensity–duration relationship used for Q_wq. It needs long-term daily and sub-daily rainfall records (IMD station and gridded data, with NIH as the Chapter 2 primary source), analysed as a partial-duration series. Until it is published, the designer shall compute P_3m from the longest available daily record for the site's zone, as the 24-hour depth equalled or exceeded on average four times a year (Clause 8.2), state the record, its length and the method on the Water Quality Sheet (Form 8-1), and use P_wq = max (P_ret, P_3m) (Clause 8.4.1). The climate factor is not applied (Clause 8.4.3).
8A.1 Method to be used in preparing the annex
- (a) Use daily records of at least 30 years where available (as for station IDF in Chapter 2).
- (b) Form the partial-duration series of 24-hour depths, with independent events separated by at least one dry day.
- (c) Choose the threshold so that the number of events above it averages four per year; P_3m is that threshold.
- (d) Derive the 3-month ARI intensities for durations from 10 minutes to 24 hours from sub-daily records, or by the Chapter 2 method of scaling from the daily value, stating which.
- (e) Do not apply the climate factor (Clause 8.4.3).
Table 8A.1 — Water quality rainfall depths by zone (layout)
| Zone (Chapter 2) | Representative stations or grid | Record (years) | P_ret, Annex 2E (mm) | P_3m (mm) | P_wq = max (mm) |
|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ |
Table 8A.2 — 3-month ARI intensity by duration (layout)
| Zone | 10 min (mm/h) | 15 min (mm/h) | 30 min (mm/h) | 1 h (mm/h) | 2 h (mm/h) | 6 h (mm/h) | 24 h (mm/h) |
|---|---|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
Annex 8B — Redevelopment LoS table and treatment-train composite VR
Supports Clauses 8.6.2 to 8.6.5 of Chapter 8.
8B.1 Required Level of Service for redevelopment
To be prepared. This part will give the required Level of Service for redevelopment sites (existing impervious cover of 20% or more of the site, Clause 8.6.2). The MARC/APWA BMP Manual (2012, Table 4.3) sets the redevelopment LoS from the percentage of impervious cover within the disturbed area; the Jammu and Kashmir values need to be set by the State Stormwater Technical Committee and checked against local redevelopment cases. Until it is published, the required LoS for a redevelopment site is 6 for the disturbed area. Where Table 8.2, applied to the change in CN from the existing condition to post-development, gives a higher LoS, that higher LoS applies. This interim value is set by this Manual. A redevelopment site that retains its whole WQv on site under Chapter 4 needs no further treatment for that area, apart from pretreatment, hotspot controls and the outfall requirements (Clause 8.4.4).
Table 8B.1 — Required LoS for redevelopment (layout)
| Existing impervious cover within the disturbed area (%) | Change in impervious cover | Required LoS |
|---|---|---|
| ______ | ______ | ______ |
| ______ | ______ | ______ |
| ______ | ______ | ______ |
8B.2 Composite Value Rating: area-weighted method
The composite VR of a site is the area-weighted average of the VRs of the BMPs serving each part of the site (Clause 8.6.3):
VR_site = Σ (A_i × VR_i) / Σ A_i + VR_signage
where:
- A_i = the area of part i of the site, ha;
- VR_i = the Value Rating (Table 8.3) of the BMP serving part i, which counts only if the BMP meets Clause 8.6.4 for the whole of A_i;
- Σ A_i = the whole site area: every part of the site is assigned to one BMP, or to preserved native vegetation; a part served by no BMP is entered with VR_i = 0; and
- VR_signage = 0.25 where public education signage is provided (Table 8.3), otherwise 0.
The site complies where VR_site ≥ required LoS (Clause 8.6.3).
Illustrative — not design values. A 1.0 ha site that is not redevelopment, with ΔCN = 18. Required LoS = 8 (Table 8.2).
Table 8B.2 — Worked example: composite VR (illustrative)
| Part | Area A_i (ha) | BMP | VR_i (Table 8.3) | A_i × VR_i |
|---|---|---|---|---|
| Roofs and paving draining to bioretention | 0.60 | Bioretention | 8.5 | 5.100 |
| Car park | 0.25 | Permeable pavement | 7.5 | 1.875 |
| Preserved strip along boundary | 0.15 | Native vegetation (preserved) | 9.25 | 1.388 |
| Total | 1.00 | 8.363 |
- Area-weighted VR = 8.363 / 1.00 = 8.36
- Signage provided: + 0.25
- VR_site = 8.61 ≥ 8. The site complies.
Without the permeable pavement (car park draining untreated, VR = 0): (5.100 + 0 + 1.388) / 1.00 + 0.25 = 6.74 < 8. The site would not comply.
8B.3 Treatment trains
To be prepared. This part will give the composite VR of BMPs in series (a treatment train), following the approach of the MARC/APWA BMP Manual (2012, Table 4.6), with values to be confirmed for Jammu and Kashmir by the calibration programme of Clause 8.13.4 (Annex 8C). Until it is published, each part of the site is credited with the VR of one BMP in the train that meets Clause 8.6.4 for that part, normally the last BMP before discharge, and no extra credit is given for BMPs in series. Pretreatment devices, silt traps and oil-grit separators upstream of the credited BMP earn no VR of their own (Clauses 8.6.4(c), 8.7.11(c) and 8.7.12(c)).
Table 8B.3 — Composite VR of treatment trains (layout)
| First BMP | Second BMP | Composite VR | Conditions |
|---|---|---|---|
| ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ |
Annex 8C — Jammu and Kashmir BMP performance calibration
Supports Clauses 8.6.3, 8.13 and 8.15.1 of Chapter 8.
To be prepared. This annex will report the BMP performance calibration programme of the State Stormwater Technical Committee (Clause 8.13.4): measured inflow and outflow concentrations and volumes for BMPs built in Jammu and Kashmir, and the revised Value Ratings that follow from them. It needs wet-weather monitoring of BMPs over several SW monsoon seasons, with laboratory analysis to the CPCB methods, and the outfall monitoring of Clause 8.13.1 published under Clause 10.17. Until it is published, the Value Ratings of Table 8.3 (MARC/APWA 2012) apply, and a proprietary device earns a VR only from verified test data (Table 8.3).
The layouts below set the minimum records the programme shall keep, so that results from different authorities can be pooled.
Table 8C.1 — Monitoring site register (layout)
| Site ID | BMP type (Table 8.3) | Location and authority | Catchment area (ha) | Impervious (%) | Soil and groundwater setting | Date commissioned | Pretreatment |
|---|---|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
Table 8C.2 — Event record (layout; parameters of Clause 8.13.2)
| Site ID | Event date | Rainfall (mm) | Inflow volume (m³) | Outflow volume (m³) | TSS in / out (mg/L) | BOD in / out (mg/L) | COD in / out (mg/L) | Faecal coliform in / out (MPN/100 mL) | TN in / out (mg/L) | TP in / out (mg/L) | Oil and grease in / out (mg/L) | Heavy metals (industrial catchments) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
Table 8C.3 — Performance summary and proposed VR (layout)
| BMP type | Sites | Events | Volume reduction (%) | Median effluent TSS (mg/L) | Other findings | VR in Table 8.3 | Proposed VR |
|---|---|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
Annex 8D — BMP design sheets, media specification, plant lists
Supports Clauses 8.5, 8.7, 8.8 and 8.11 of Chapter 8.
Each design sheet collects the requirements of Chapter 8 for one BMP. Values marked "recommended starting value" in Clause 8.7.1 may be departed from with justification. Values that the Manual does not set are marked "to be confirmed in design"; the designer shall state and justify them. Every BMP also needs: sizing for the WQv or Q_wq (Clause 8.6.4(a)), pretreatment (Clause 8.5.3), a safe bypass for flows above Q_wq (Clause 8.4.6) and maintenance access (Chapter 10).
8D.1 Design sheets
Table 8D.1 — Pretreatment (all BMPs)
| Item | Requirement | Clause |
|---|---|---|
| Where needed | Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland, at each concentrated inflow | 8.5.3 |
| Types | Sediment forebay, grass filter strip, silt trap or proprietary device | 8.5.3 |
| Size | Holds at least 10% of the WQv of its contributing area; or sized for Q_wq (flow-through devices) | 8.5.3 |
| Access | Cleanable without entering or disturbing the main BMP | 8.5.4 |
| Silt traps and catch pits | At every inlet receiving runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody; sump at least 300 mm below the outlet invert; earn no VR | 8.7.12 |
Table 8D.2 — Bioretention and rain gardens (Figure 8.2)
| Item | Requirement | Clause |
|---|---|---|
| Ponding depth | ≤ 300 mm above the mulch, with an overflow at maximum ponding level | 8.7.2(a) |
| Ponding drawdown | Within 48 h | 8.7.2(b) |
| Filter media | 600–900 mm engineered sandy loam, low fines, low phosphorus (Table 8D.12) | 8.7.2(c) |
| Mulch | 50–75 mm | 8.7.2(c) |
| Transition (choker) and gravel drainage layers | Required; thickness and grading to be confirmed in design | 8.7.2(d) |
| Underdrain | Perforated; required where the design infiltration rate cannot meet the 48 h drawdown, or where lined; diameter to be confirmed in design | 8.7.2(e) |
| Lining | Required where Clause 8.8 cannot be met, and at hotspots | 8.7.2(f) |
| Plants | Native or naturalised, tolerant of waterlogging and long dry spells (Tables 8D.13 and 8D.14) | 8.7.2(g) |
| VR | 8.5 (rain garden / infiltration 9.0) | Table 8.3 |
Table 8D.3 — Vegetated swales
| Item | Requirement | Clause |
|---|---|---|
| Section | Trapezoidal or parabolic; side slopes no steeper than 1V:3H | 8.7.3(a) |
| Longitudinal slope | 0.5% to 4%; check dams where steeper | 8.7.3(b) |
| Flow at Q_wq | Depth not more than grass height; velocity ≤ 0.3 m/s | 8.7.3(c) |
| 1% AEP or bypass flow | No erosion (Chapter 9 permissible velocities) | 8.7.3(d) |
| Underdrained ("dry") swale | Where slope < 1% or subsoil is poorly drained; filter media as Table 8D.12 | 8.7.3(e) |
| VR | 4.0 (native vegetation swale) | Table 8.3 |
Table 8D.4 — Vegetated filter strips
| Item | Requirement | Clause |
|---|---|---|
| Inflow | Sheet flow only; level spreader where flow arrives concentrated | 8.7.4(a) |
| Length in flow direction | ≥ 5 m | 8.7.4(b) |
| Slope | 1% to 8% | 8.7.4(b) |
| Use | Mainly pretreatment for bioretention, infiltration and swales | 8.7.4(c) |
| VR | 5.0 | Table 8.3 |
Table 8D.5 — Permeable pavement
| Item | Requirement | Clause |
|---|---|---|
| Run-on | Impervious run-on area ≤ 2 × permeable area; none from unpaved or eroding areas | 8.7.5(a) |
| Base reservoir | Clean open-graded aggregate holding its share of the WQv in its voids; void ratio confirmed by test | 8.7.5(b) |
| Open (infiltrating) base | Only where Clause 8.8 is met; otherwise lined with underdrain and counted as filtration only | 8.7.5(c) |
| Structure | Designed for traffic loading to the road authority's standards | 8.7.5(d) |
| Exclusions | Not at hotspots; not where it will be resurfaced with impermeable material | 8.7.5(e) |
| VR | 7.5 | Table 8.3 |
Table 8D.6 — Infiltration trenches and basins (Figure 8.3)
| Item | Requirement | Clause |
|---|---|---|
| Pretreatment | Always (Table 8D.1) | 8.7.6(a) |
| Fill | Clean washed aggregate, void ratio confirmed by test; geotextile on sides and top; sand base | 8.7.6(b) |
| Observation well | To the base of each trench | 8.7.6(c) |
| Storage | WQv (or Chapter 4 retention volume, if greater) held in the voids | 8.7.6(d) |
| Drawdown | Empty within 72 h at the design infiltration rate | 8.7.6(d), 8.8.7 |
| Overflow | At grade, to the minor or major system | 8.7.6(e) |
| Commissioning | Not in service until the contributing area is stabilised | 8.7.6(f) |
| Criteria | All of Clause 8.8 (Table 8D.11) | 8.8 |
Table 8D.7 — Wet ponds (extended wet detention)
| Item | Requirement | Clause |
|---|---|---|
| Permanent pool | ≥ WQv | 8.7.7(a) |
| Extended detention | WQv above the pool, released over 24–48 h | 8.7.7(a), 8.4.7 |
| Forebay | At each inlet | 8.7.7(b) |
| Flow path | Length-to-width ≥ 3:1; no short-circuiting | 8.7.7(c) |
| Pool depth | 1.0–2.5 m, with safety bench (Clause 7.9.4) | 8.7.7(d) |
| Water balance | Monthly balance with IMD rainfall and pan evaporation: ≥ 50% of pool volume kept through the driest year in 10; no top-up with groundwater, potable water or sewage | 8.7.8 |
| Flood detention | Chapter 4 detention may sit above the extended detention level | 8.7.7(f) |
| VR | 5.0 | Table 8.3 |
Table 8D.8 — Constructed wetlands
| Item | Requirement | Clause |
|---|---|---|
| Layout | Inlet sedimentation pond (forebay), then shallow macrophyte zone | 8.7.9(a) |
| Extended detention | WQv above normal water level, released over 24–48 h; depth ≤ 0.5 m | 8.7.9(b) |
| Flow path | Length-to-width ≥ 3:1; deep zones across the flow path | 8.7.9(c) |
| Bypass | High-flow bypass so that floods do not scour the macrophyte zone | 8.7.9(d) |
| At a tank inlet | Within the tank's setback, outside its waterspread; not counted as tank storage | 8.7.9(e) |
| Water balance | As wet ponds (minimum wetland depth kept) | 8.7.8 |
| VR | 7.0 (extended detention wetland) | Table 8.3 |
Table 8D.9 — Gross pollutant traps and outfall screens
| Item | Requirement | Clause |
|---|---|---|
| Treatment flow | Q_wq; all flows up to 1% AEP pass without washing out captured material | 8.7.10(a) |
| Capture size | Down to about 5 mm | 8.7.10(b) |
| Head loss | In the drain HGL (Chapter 9), screen 50% blocked | 8.7.10(c), 8.10.3(a) |
| Storage | For the O&M cleaning interval; not less than 3-monthly cleaning | 8.7.10(d) |
| Access | Vehicle access for suction or grab cleaning; safe cleaning platform | 8.7.10(e), 8.10.3(d) |
| Blocked screen | Overflow or bypass path so that a fully blocked screen does not flood property | 8.10.3(b) |
| Bar spacing | Chosen for the hazard: closer for litter capture, wider where blockage would cause flooding; to be confirmed in design | 8.10.3(c) |
Table 8D.10 — Oil-grit separators
| Item | Requirement | Clause |
|---|---|---|
| Where | Fuel stations; vehicle workshops and washing bays; bus and truck depots; parking areas of more than 50 spaces | 8.7.11(a) |
| Sizing | Q_wq, with high-flow bypass | 8.7.11(b) |
| Not alone | Followed by a filtering BMP where the site needs a VR above 5; lined filtering BMP before any infiltration at hotspots | 8.7.11(c), 8.8.8 |
Table 8D.11 — Infiltration and recharge criteria (all infiltrating BMPs)
| Item | Requirement | Clause |
|---|---|---|
| Groundwater separation | Seasonal high groundwater ≥ 1.0 m below base (roof-only runoff in notified coastal sand: ≥ 0.5 m with mounding check, mound ≥ 0.3 m below base) | 8.8.1, 8.8.9(d) |
| Bedrock or impermeable layer | Base ≥ 1.0 m above, unless designed for rock-aquifer recharge under Clause 8.8.10 | 8.8.2 |
| Tests | Double-ring (ASTM D3385) for basins, bioretention, permeable pavement; falling-head borehole or trial-pit soakage (e.g. BRE Digest 365) for trenches, soakaways, pits, wells; ≥ 2 per facility and ≥ 1 per 100 m² of base or per 50 m of trench; Form 8-2 | 8.8.3 |
| Design rate | Measured rate ÷ 2.0 (tests meet 8.8.3(c) and vary by no more than a factor of 2), otherwise ÷ 3.0 | 8.8.4 |
| Minimum rates | ≥ 13 mm/h full infiltration; 3–13 mm/h partial, with underdrain, credit only for volume infiltrated within 72 h; < 3 mm/h no credit | 8.8.5 |
| Setbacks (runoff from paved surfaces) | Foundations 3 m, basements 5 m; property boundary 1.5 m; drinking-water well or borewell 30 m; septic tank or soak pit 15 m; crest of slope steeper than 1V:3H 6 m | 8.8.6 |
| Expansive soils | Foundation setback doubled | 8.8.11(b) |
| Drawdown | Empty within 72 h at design rate; tested after construction | 8.8.7 |
| Hotspots | No infiltration without treatment; none at all for waste sites and contaminated land | 8.8.8 |
| Road runoff | Never led directly into a well, borewell or recharge shaft | 8.11.3(b) |
8D.2 Bioretention drawdown check
The 48-hour ponding drawdown (Clause 8.7.2(b)) and the minimum rates of Clause 8.8.5 together decide whether a cell needs an underdrain.
- Rate needed to drain the maximum ponding depth in 48 h = 300 mm / 48 h = 6.25 mm/h.
- Design rate ≥ 13 mm/h: full infiltration, no underdrain, provided Clause 8.8 is met.
- Design rate from 6.25 mm/h to 13 mm/h: the ponding drains in time, but Clause 8.8.5(b) applies, so an underdrain is required.
- Design rate below 6.25 mm/h: the ponding cannot drain in 48 h by infiltration; an underdrain is required (Clause 8.7.2(e)), and below 3 mm/h no infiltration credit is given.
Illustrative — not design values. Two tests at the base of a proposed cell give 30 mm/h and 22 mm/h. The two results differ by a factor of 30 / 22 = 1.36, which is not more than 2, and the number of tests meets Clause 8.8.3(c), so the safety factor is 2.0. Taking the lower result, the design rate = 22 / 2.0 = 11 mm/h. This is above 6.25 mm/h, so the ponding drains in 300 / 11 = 27 h, within 48 h. It is below 13 mm/h, so the cell is a partial-infiltration design with an underdrain (Clause 8.8.5(b)).
8D.3 Filter media specification
Table 8D.12 — Bioretention filter media and layers
| Layer | Requirement from Chapter 8 | Values to be confirmed in design |
|---|---|---|
| Mulch | 50–75 mm (Clause 8.7.2(c)); shredded hardwood or similar organic mulch that does not float away at the ponding depth | Material and source |
| Filter media | 600–900 mm engineered sandy loam with low fines and low phosphorus content (Clause 8.7.2(c)) | Particle size grading; fines (silt + clay) limit; organic matter content; phosphorus limit; saturated hydraulic conductivity of the compacted media; source and test certificate for each batch |
| Transition (choker) layer | Between media and gravel, to stop media washing into the gravel (Clause 8.7.2(d)) | Thickness and grading, matched to the media and gravel |
| Gravel drainage layer | Below the transition layer, surrounding the underdrain (Clause 8.7.2(d)) | Thickness, grading, washed |
| Underdrain | Perforated pipe where Clause 8.7.2(e) applies, with cleanouts | Diameter, slope, perforation, outlet level |
| Liner | Where Clause 8.7.2(f) applies (cannot meet Clause 8.8; hotspots) | Liner type and protection |
Media shall be tested before placing, and placed in lifts without heavy compaction. The State Stormwater Technical Committee should set numeric limits for grading, fines, organic matter and phosphorus, with local sources of sand and compost, when it reviews this annex.
8D.4 Plant lists
No Jammu and Kashmir source on planting for stormwater BMPs was found during research for this Manual, and none of the sources read names the native species to be used in bioretention, swales, filter strips or constructed wetlands in the Union Territory. This annex therefore lists no species for Jammu and Kashmir, and gives no Kashmiri, Dogri or Urdu plant names, rather than carry over lists drawn up for other States, whose climates are unlike the Kashmir valley's cold winters or the Kandi's dry stony fans. Until the State Stormwater Technical Committee issues lists, the species for each BMP shall be chosen, and recorded on the BMP design sheet, by a horticulturist or the Forest Department for the site's sub-area of Annex 2A, its altitude, its soil and its water table, under the following rules (set by this Manual):
- (a) Native or long naturalised species only, as the Forest Department confirms for the site; no species named in Table 8D.15 or otherwise known to be invasive in the Union Territory.
- (b) Frost and snow. On the Kashmir valley floor, in the Karewas and in every town above about 1,500 m, species hardy to the frost and snow of December to March; above that height no species that is not frost-hardy is used in any BMP.
- (c) Wet and dry ground. On the valley floor, the Sirowal and lake and nambal margins, where the water table is within 2 m, species tolerant of long waterlogging; on the Kandi fans and the hill slopes, species tolerant of dry, stony ground, chosen first on banks, cut slopes and the margins of khads and nallahs to bind the soil.
- (d) Not in the waterway. No planting in the bed or on the banks of a river, nallah, khad, kol or khul, or on an embankment, without the authorisation of I&FC (Water Resources Act, 2010, section 81 [TBC]), and none that would obstruct the flow of a channel or the outlet of a lake.
- (e) Not in the waterbodies. No planting under this annex in a lake, nambal, talab, Kandi pond, spring or wetland, whose vegetation, such as the reed beds of Hygam, "the largest remaining reed-bed area" (Wildlife Department, 2024), is managed by its custodian under Chapter 7.
Table 8D.13 — Indicative plants for bioretention, swales and filter strips
| Use | Botanical name | Local name | Notes |
|---|---|---|---|
| All BMPs of Clause 8.7 | None listed for Jammu and Kashmir in this draft | — | Chosen under rules (a) to (e) above and recorded on the BMP design sheet (Annex 8D) |
Table 8D.14 — Indicative plants for constructed wetlands and wet ponds
| Zone | Botanical name | Local name | Notes |
|---|---|---|---|
| All zones | None listed for Jammu and Kashmir in this draft | — | Chosen under rules (a) to (e) above; constructed wetlands are built outside the waterspread of any natural waterbody (Clause 8.7.9(e)) |
Table 8D.15 — Species not to be planted
| Botanical name | Local name | Reason |
|---|---|---|
| Any species the Forest Department lists as invasive in the Union Territory | — | No list of invasive species for Jammu and Kashmir was read for this Manual [TBC] |
Annex 8E — Erosion and sediment control standard details
Supports Clause 8.12 of Chapter 8.
The details below show the arrangement of each measure. Dimensions set by the Manual are given. Dimensions the Manual does not set are labelled "to be confirmed in design" and shall be shown on the ESC plan (Clause 8.12.1). Temporary measures are designed with the rainfall of Chapter 2 and a climate factor of 1.0 (Clause 8.12.4).
Table 8E.1 — Selection of measures (Clause 8.12.3)
| Situation | Measure | Detail |
|---|---|---|
| Sheet flow leaving a disturbed area, along its downslope edge | Silt fence | Figure 8E.1 |
| Concentrated flow from a disturbed area of up to 2 ha | Sediment trap | Figure 8E.2 |
| Disturbed area of more than 2 ha | Sediment basin with surface dewatering outlet | Figure 8E.2 |
| Existing drain inlet receiving site runoff | Inlet protection | Figure 8E.4 |
| Vehicle exit to a public road | Stabilised construction exit, with wheel washing | Figure 8E.3 |
| Stockpiles | Outside Zone 1 of any waterbody setback; ≥ 10 m from any drain; covered in the SW monsoon | Notes to Figure 8E.1 |
| Dewatering | Through a sediment basin, settling tank or filter bag; never pumped directly to a drain or waterbody | Notes to Figure 8E.2 |
| Concrete washout | Lined pit; never into a drain | Notes to Figure 8E.3 |
8E.1 Silt fence
Figure 8E.1 — Silt fence: section showing geotextile on posts with the bottom edge buried in an anchor trench on the upslope side, and plan showing the fence on the contour with returns at the ends. Dimensions not set by the Manual are to be confirmed in design. Original drawing for this Manual, adapted from US EPA, NPDES Construction General Permit (2022), and CIRIA, The SuDS Manual (C753), 2015.
To be prepared. Clause 8.12.3(a) refers to this annex for the limit on the area draining to each silt fence. That limit, and the maximum slope length above a fence, need to be set by the State Stormwater Technical Committee for Jammu and Kashmir rainfall. Until they are published, the following interim limits apply, taken from common US practice (US EPA, Stormwater Best Management Practice fact sheet: Silt Fence):
- drainage area: not more than 0.1 ha per 30 m of fence;
- slope length above the fence: not more than 30 m on slopes under 2%, 23 m at 2–5%, 15 m at 5–10%, 8 m at 10–20% and 5 m steeper than 20%;
- wherever flow arrives concentrated, or a limit cannot be met, a sediment trap (Figure 8E.2) is used instead.
The designer shall show the drainage area and slope length served by each fence on the ESC plan.
Notes:
- Place along the contour at the downslope edge of the disturbed area, never across a concentrated flow path.
- Turn the ends upslope so that water cannot run round them.
- Inspect weekly and within 24 hours after every heavy-rainfall event; repair within 48 hours; remove sediment when the deposit reaches half the fence height (Clause 8.12.5).
- Remove only after the area draining to it is stabilised (Clause 8.12.6).
- Stockpiles: outside Zone 1, at least 10 m from any drain, and covered during the SW monsoon (Clause 8.12.3(f)).
8E.2 Sediment trap and sediment basin
Figure 8E.2 — Sediment trap or basin in section: inflow, storage volume below the outlet, surface dewatering outlet (skimmer) drawing water from the top of the pool, emergency spillway, and sediment cleanout level at half the storage. Original drawing for this Manual, adapted from US EPA, NPDES Construction General Permit (2022).
Notes:
- Sediment trap: for concentrated flow from disturbed areas of up to 2 ha (Clause 8.12.3(b)). Storage volume, depth and outlet: to be confirmed in design.
- Sediment basin: for disturbed areas of more than 2 ha. Storage below the outlet ≥ the greater of (a) the runoff from the 50% AEP (2-yr) 24-hour storm and (b) 250 m³ per hectare of drainage area (Clause 8.12.3(c)).
- The dewatering outlet draws water from the surface (Clause 8.12.3(c)).
- An emergency spillway and its capacity: to be confirmed in design. Where the basin is also a permanent detention facility, the Chapter 4 spillway rules apply.
- Clean out when half full of sediment (Clause 8.12.5). Remove sediment from any permanent facility before its as-built survey (Clause 8.12.6).
- Dewatering of excavations shall pass through a sediment basin, settling tank or filter bag (Clause 8.12.3(g)).
Illustrative — not design values. A sediment basin serves 3.0 ha of disturbed land. Assume a 2-yr 24-hour rainfall of 100 mm (climate factor 1.0, Clause 8.12.4) and a curve number of 86 for bare compacted ground under the antecedent moisture condition of Chapter 2.
- S = 25,400 / 86 − 254 = 41.35 mm; Ia = 0.2S = 8.27 mm
- Q = (P − Ia)² / (P − Ia + S) = (100 − 8.27)² / (100 − 8.27 + 41.35) = 8,414 / 133.08 = 63.2 mm
- (a) Runoff volume = 10 × Q × A = 10 × 63.2 × 3.0 = 1,896 m³
- (b) 250 m³/ha × 3.0 ha = 750 m³
- Required storage below the outlet = max (1,896, 750) = 1,896 m³. Here the 2-yr runoff governs.
8E.3 Stabilised construction exit and concrete washout
Figure 8E.3 — Stabilised construction exit: plan and section showing a coarse aggregate pad on geotextile between the site and the public road, a wheel-wash bay draining to a sediment trap, and a lined concrete washout pit. Dimensions not set by the Manual are to be confirmed in design. Original drawing for this Manual, adapted from US EPA, NPDES Construction General Permit (2022).
Notes:
- Provide at every point where vehicles leave the site onto a public road, with wheel washing (Clause 8.12.3(e)).
- Pad length, width, thickness and aggregate size: to be confirmed in design.
- Wash water drains to a sediment trap or basin, never to a drain.
- Concrete washout in a lined pit, never into a drain (Clause 8.12.3(h)).
- Sweep any sediment tracked onto the public road at the end of each working day.
8E.4 Inlet protection
Figure 8E.4 — Inlet protection at an existing drain inlet: a filter barrier around a grate or kerb inlet, with an overflow path so that ponding does not flood the road or property. Original drawing for this Manual, adapted from US EPA, NPDES Construction General Permit (2022), and CIRIA, The SuDS Manual (C753), 2015.
Notes:
- At every existing drain inlet that receives runoff from the site (Clause 8.12.3(d)).
- The protection must not block the inlet: water ponding behind it must be able to overflow into the inlet or along the street.
- Barrier type and height: to be confirmed in design.
- Remove sediment after each heavy-rainfall event (Clause 8.12.5).
8E.5 Timing and inspection
Table 8E.2 — ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
| Item | Requirement |
|---|---|
| Completed earthworks | Stabilised by vegetation, mulch, matting or paving by 31 May |
| Area cleared between 15 June and 31 October | Sediment controls in place before clearing |
| Area exposed in the SW monsoon | As small as practicable |
| Inspection | Weekly, and within 24 h after every heavy-rainfall event (Chapter 10) |
| Repair | Within 48 h |
| Cleaning | When half full of sediment |
| Removal | Only after the area draining to the measure is stabilised |
Form 8-1 — Water Quality Sheet
Supports Clauses 8.4, 8.6 and 8.14 of Chapter 8.
Draft form — Jammu and Kashmir Stormwater Design Manual, Draft v1.0.
Table 8F.1 — Form 8-1, Section A: Site and rainfall
| No. | Field | Entry | Clause |
|---|---|---|---|
| A1 | Project name and Authority file number | ______ | — |
| A2 | Tier (A / B) and site area, ha | ______ | 8.6.1 |
| A3 | Rainfall zone (Chapter 2) | ______ | 8.4.1 |
| A4 | P_ret, mm (Annex 2E) | ______ | 8.4.1 |
| A5 | P_3m, mm (Annex 8A, or the interim calculation: record, years, method) | ______ | 8.4.1 |
| A6 | P_wq = max (P_ret, P_3m), mm (no climate factor) | ______ | 8.4.1, 8.4.3 |
| A7 | WQv method: SCS-CN, or Rv (sites < 0.5 ha and Tier B simplified method only) | ______ | 8.4.2 |
| A8 | Redevelopment (existing impervious ≥ 20%)? | ______ | 8.6.2 |
Table 8F.2 — Form 8-1, Section B: Water quality volume and flow by drainage area
| Area ID | Area (ha) | Impervious I (%) | Q_wq runoff depth (mm) or Rv | WQv (m³) | Q_wq (m³/s) | Volume retained, Chapter 4 (m³) | WQv not retained (m³) | BMP serving the area | Pretreatment |
|---|---|---|---|---|---|---|---|---|---|
| ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ | ______ |
| Total | ______ | ______ | ______ | ______ |
Table 8F.3 — Form 8-1, Section C: Level of Service and Value Rating (Tier A)
| No. | Field | Entry | Clause |
|---|---|---|---|
| C1 | CN pre-development; CN post-development; ΔCN | ______ | 8.6.2 |
| C2 | Required LoS (Table 8.2, or Annex 8B for redevelopment) | ______ | 8.6.2 |
| C3 | Composite VR (Annex 8B calculation attached) | ______ | 8.6.3 |
| C4 | Composite VR ≥ required LoS? | ______ | 8.6.3 |
| C5 | Tier B: route used under Clause 8.6.5 (a) retained on site / (b) bioretention, rain garden or infiltration | ______ | 8.6.5 |
Table 8F.4 — Form 8-1, Section D: Other submittals (Clause 8.14)
| No. | Item | Attached (yes / no / not applicable) | Clause |
|---|---|---|---|
| D1 | BMP designs to Clause 8.7 and Annex 8D, with pretreatment | ______ | 8.14(3) |
| D2 | Infiltration Test Record (Form 8-2), seasonal high groundwater level and source, design rate, drawdown time, setbacks | ______ | 8.14(4) |
| D3 | Sewage and sullage connection plan; dye or smoke test record | ______ | 8.9.2, 8.14(5) |
| D4 | GPT and first-flush design for any outfall to a waterbody | ______ | 8.10, 8.14(6) |
| D5 | RWH layout separating harvesting, recharge and detention | ______ | 8.11, 8.14(7) |
| D6 | ESC plan | ______ | 8.12, 8.14(8) |
| D7 | Hotspot controls, where Clause 8.8.8 applies | ______ | 8.8.8 |
Table 8F.5 — Form 8-1, Section E: Prepared by
| Field | Entry |
|---|---|
| Name, registration and empanelment number (Clause 10.6) | ______ |
| Signature and date | ______ |
Form 8-2 — Infiltration Test Record
Supports Clauses 8.8.1 to 8.8.7 and 8.11.4 of Chapter 8.
Draft form — Jammu and Kashmir Stormwater Design Manual, Draft v1.0. One record per facility. Attach a plan showing the test locations, and the readings for each test.
Table 8F.6 — Form 8-2, Section A: Facility
| No. | Field | Entry | Clause |
|---|---|---|---|
| A1 | Project and facility ID; facility type | ______ | 8.8.3 |
| A2 | Infiltration base area (m²) or trench length (m) | ______ | 8.8.3(c) |
| A3 | Proposed base level of the facility, m (datum) | ______ | 8.8.3 |
| A4 | Runoff source: roof only / paved surfaces / mixed; hotspot (yes / no) | ______ | 8.8.6, 8.8.8 |
| A5 | Ground setting: sandy coastal / laterite or hard rock / delta clay or black cotton / other | ______ | 8.8.9–8.8.11 |
Table 8F.7 — Form 8-2, Section B: Tests
| Test no. | Location (grid ref.) | Date | Method: double-ring (ASTM D3385) / falling-head borehole or trial-pit soakage (e.g. BRE Digest 365) | Test level, m | Groundwater level at time of test, m | Measured rate (mm/h) |
|---|---|---|---|---|---|---|
| 1 | ______ | ______ | ______ | ______ | ______ | ______ |
| 2 | ______ | ______ | ______ | ______ | ______ | ______ |
| 3 | ______ | ______ | ______ | ______ | ______ | ______ |
Minimum number of tests: 2 per facility, and 1 per 100 m² of base area or per 50 m of trench (Clause 8.8.3(c)).
Table 8F.8 — Form 8-2, Section C: Design rate and drawdown
| No. | Item | Entry | Clause |
|---|---|---|---|
| C1 | Number of tests made; number required | ______ | 8.8.3(c) |
| C2 | Highest and lowest measured rates; ratio (highest ÷ lowest) | ______ | 8.8.4 |
| C3 | Safety factor: 2.0 (tests meet 8.8.3(c) and ratio ≤ 2) or 3.0 | ______ | 8.8.4 |
| C4 | Design rate = measured rate used ÷ safety factor, mm/h (state which measured rate was used) | ______ | 8.8.4 |
| C5 | Category: ≥ 13 mm/h full infiltration / 3–13 mm/h partial with underdrain / < 3 mm/h no credit | ______ | 8.8.5 |
| C6 | Depth of water to infiltrate, mm; drawdown time = depth ÷ design rate, h (≤ 72 h) | ______ | 8.8.7 |
Table 8F.9 — Form 8-2, Section D: Separation and setbacks
| No. | Item | Entry | Clause |
|---|---|---|---|
| D1 | Seasonal high groundwater level, m, and its source (Clause 3.10.2) | ______ | 8.8.1 |
| D2 | Separation from facility base to seasonal high groundwater, m (≥ 1.0; ≥ 0.5 for roof-only runoff in notified coastal sand with mounding check) | ______ | 8.8.1, 8.8.9(d) |
| D3 | Depth to bedrock or impermeable layer below base, m (≥ 1.0 unless Clause 8.8.10) | ______ | 8.8.2 |
| D4 | Distances to: foundations / basement / property boundary / drinking-water well or borewell / septic tank or soak pit / crest of slope steeper than 1V:3H, m | ______ | 8.8.6 |
| D5 | Expansive soils: foundation setback doubled? | ______ | 8.8.11(b) |
Table 8F.10 — Form 8-2, Section E: Declaration
| Field | Entry |
|---|---|
| Tester: name, qualification in geotechnical testing, organisation | ______ |
| I certify that the tests were made at the stated locations and levels, by the stated methods, and that the readings attached are complete. Signature and date | ______ |
| Designer (Clause 10.6): name and signature | ______ |