Annexes to Chapter 5Downstream and Tailwater Analysis
These annexes support Chapter 5. Annex 5C is a worked example of the outfall-closed check of Clause 5.10, for the illustrative facility of Annex 4C. Annexes 5A and 5B need tidal, surge, survey and river data that this draft does not yet contain; each lists what the chapter already sets, gives the intended layout and states the interim rule of Chapter 5 that applies until it is published. Forms 5-1 and 5-2 are the submittal forms required by Clause 5.14. They are draft forms and have no statutory status.
Annex 5A — Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
Supports Clauses 5.7, 5.9, 5.10, 5.11 and 5.12 of Chapter 5.
5A.1 Table 5A.1 shows how the values of this annex enter the design tailwater levels of Table 5.1. The sea-level allowance is set by Clause 5.7.4 and does not depend on this annex.
Table 5A.1 — Use of the Annex 5A values in the design tailwater (Table 5.1)
| Design case | Tailwater | Annex 5A values used | Chapter value |
|---|---|---|---|
| Minor-system design | MHWS + SLA | MHWS | SLA ≥ +0.3 m (Clause 5.7.4) |
| Major-system and storage design | HAT + surge + SLA | HAT; 10% AEP surge (Clause 5.7.3(a)) | SLA ≥ +0.3 m |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA | 1% AEP still-water level (Clause 5.7.3(b)) | SLA ≥ +0.3 m |
| Datum conversion | Chart datum to project datum | Offset from chart datum to the Survey of India datum (Clause 5.7.2(b)) | — |
Not prepared for Jammu and Kashmir. Jammu and Kashmir has no coast, so no outfall in the Union Territory has a tidal tailwater, and this annex has no Jammu and Kashmir content (Clause 5.1.4). Its tables are kept, empty, so that the annex and table numbers match the other editions of this Manual. Rows F1 to F7 of Form 5-1 are entered as "not applicable", and the tailwater is derived under rows F8 to F10; for an outfall that the Jhelum can close, row F10 records the CWC gauge and its levels, the I&FC closing stage (named, not converted from feet), the river lock and the pumping stations credited of Clause 5.8.5(a); for an outfall to a khad or nallah, the study, the flood marks and the bed survey of Clause 5.8.5(c); and for an outfall to a reservoir, the custodian's levels of Clause 5.8.5(d).
Table 5A.2 — Tidal datums, surge and still-water levels by coastal segment (layout)
| Coastal segment | Reference port and tide-table edition | MSL (m CD) | MHWS (m CD) | HAT (m CD) | CD to Survey of India datum (m) | 10% AEP surge (m) | 1% AEP still-water level (m CD) | Wave set-up (m), open-sea outfalls | Sources |
|---|---|---|---|---|---|---|---|---|---|
Annex 5B — Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
Supports Clauses 5.2, 5.3, 5.8 and 5.13 of Chapter 5.
5B.1 Table 5B.1 lists the water bodies that Chapter 5 already names. It is not complete: the annex will add the extents of each reach, the other rivers, canals and mouths of the State, and a map.
Table 5B.1 — Water bodies named in Chapter 5
| Water body | Region | Listed as | Clause |
|---|---|---|---|
| Jhelum through Srinagar, past the Ram Munshi Bagh gauge, and the flood spill channel from Padshahi Bagh to the Wular | Srinagar, Budgam, Ganderbal | Riverine outfall reach and major drains; embanked, gated and pumped; design river level not below the transferred 1,589.65 m (8 September 2014; 1,588.99 m in the list of 2022: the higher applies [TBC]); 10% AEP and minor-system tailwater not below the danger level 1,585.48 m; gravity outfalls closed from the I&FC flood-declaration stage of 18 ft (danger 21 ft; gauge zero not published, not converted); single river lock of at least 7 days; flood spill channel at 4,000 cusecs (CAG) until I&FC confirms a later capacity; datum [TBC] | 5.2, 5.8.1, 5.8.5 |
| Jhelum past Khanabal and Sangam, at Anantnag, Bijbehara and Pampore | Anantnag, Pulwama | Riverine outfall reach; design river level not below the transferred 1,595.43 m (Khanabal, 3 September 2025) and 1,595.7 m (Sangam, September 2014; 1,595 m in 2022) [TBC]; danger levels 1,592.5 m (Khanabal) and 1,590.88 m (Sangam); I&FC stages at Sangam 21 ft and 25 ft, labels in conflict [TBC]; river lock of at least 7 days | 5.8.1, 5.8.5 |
| Jhelum past Safapora, at Sumbal and Bandipora; the Wular; the outlet reach at Ningli, Sopore and Baramulla | Bandipora, Baramulla | Riverine outfall reach and lake; design river level not below the transferred 1,582.1 m (Safapora, 9 September 2014; danger 1,579.66 m); Wular not below its I&FC danger level of 1,578 m (datum [TBC]); below Ningli, no CWC level found: model or surveyed 2014 flood marks [TBC]; WUCMA's consent; Ramsar site | 5.8.1, 5.8.5 |
| Tawi at Jammu, past the Jammu Tawi (Sidhra) gauge, and at Udhampur, past Kishanpur Manwal; the Tawi barrage | Jammu, Udhampur | Riverine outfall reach; design river level not below the transferred 321.1 m (Sidhra, 26 August 2025; 318.85 m in 2014) and 442.65 m (Kishanpur Manwal, 26 August 2025); level-monitoring sites with no danger level; barrage pond level, gates and operator not found [TBC]; rivers crossing the border: no lowering assumed | 5.8.1, 5.8.3, 5.8.5 |
| Chenab at Akhnoor, below Salal; at Doda (Prem Nagar), Ramban, Reasi and Kishtwar; the Neeru and Kalnai nallahs | Jammu, Doda, Ramban, Reasi, Kishtwar | Riverine outfall reach; design river level not below the transferred 324.29 m (Akhnoor, 10 September 1992) and 902.56 m (Prem Nagar, 2025); Neeru 1,075.33 m and Kalnai 932.7 m (2025); I&FC stages at Akhnoor 32 ft and 35 ft, with 43 ft (2025) and 61 ft (1992), not converted; no CWC level found at Ramban, Reasi or Kishtwar [TBC]; dam releases included | 5.8.1, 5.8.3, 5.8.5 |
| Ujh at Kathua, Basantar at Samba, Devak at Udhampur, Ravi at Basantpur | Kathua, Samba, Udhampur | Riverine outfall reach; Basantpur 318.35 m (26 August 2025); no CWC level found on the Ujh, Basantar or Devak [TBC]; Ujh at Panjtirthi alert 48,000 and danger 88,000 cusecs (I&FC, as reported); modelled or surveyed flood level required; no lowering assumed from the reach beyond the border | 5.8.1, 5.8.5 |
| Lidder, Rambiara, Romushi, Doodhganga, Vishow and Sind above the valley floor | Anantnag, Pulwama, Kulgam, Budgam, Ganderbal | Riverine outfall reach; Ganeshpura 1,871.78 m (28 August 2016), Rumshi 1,589.91 m (27 August 2025), Watchi 1,595.29 m and Kralpora 1,594.3 m (2025); I&FC gauges at Khudwani and Wachi on local zeros, not converted | 5.8.1, 5.8.5 |
| Balol, Thather and Bhalwal khads and the other khads of the Kandi belt; the nallahs and khads of the hill towns | Jammu, Samba, Kathua, Udhampur, Reasi, Ramban, Doda, Kishtwar, Rajouri, Poonch | Khads, nallahs and major drains; ungauged; 1% AEP study with bulking and blockage and surveyed flood marks (September 2014, August–September 2025); outfall at least 0.5 m above the highest surveyed bed level; no outfall in the active channel or on Gair Mumkin Khad land within the functional khad | 5.2, 5.8.1, 5.8.5 |
| Dal and Nigeen, with the Dal Gate, the Tsunth Kol and Nallah Amir Khan; Brari Nambal, Khushalsar, Gilsar and Anchar | Srinagar, Ganderbal | Lake outfalls; outlet levels and datums not found [TBC] (the reported "10.5 feet" is not a level); routed as closed storage while the Jhelum shuts the outlets; LCMA's consent; sediment trap and dry-weather-flow interception before every outfall; 200 m court line at the Dal and Nigeen | 5.8.5 |
| Hokersar, Nambal Narkur, Shallabugh, Hygam and the Rakh-e-Arth basin | Srinagar, Budgam, Baramulla, Ganderbal | Flood-absorption marshes; no storage credited without the custodian's records; no drain to bypass them; Wildlife Department's consent and, for Ramsar sites (Hokersar, Hygam, Shallabugh), the J&K Wetland Authority's | 5.8.5 |
| Manasbal; Mansar and Surinsar | Ganderbal, Samba, Jammu | Lake outfalls; no level found [TBC]; spill level plus head; Surinsar–Mansar a Ramsar site; 30 m bye-law line | 5.8.5 |
| Salal, Baglihar and Dul Hasti reservoirs on the Chenab; Ranjit Sagar on the Ravi | Reasi, Ramban, Kishtwar, Kathua | Reservoir outfalls; tailwater Salal 488.18 m (FRL 487.68 m + 0.5 m), Baglihar 840.5 m (FRL and quoted maximum design flood level 840 m + 0.5 m), Ranjit Sagar 528.41 m (the higher of the conflicting FRLs 527.91 m and 527.13 m, + 0.5 m) [TBC]; no level found for Dul Hasti [TBC]; consent of NHPC, JKSPDC or Ranjit Sagar's operator; releases and flushing included, announced or not | 5.8.3, 5.8.5 |
| Ranbir and Sindh canals; the Tsunth Kol, the Padshahi Canal and the other city channels; zamindari khuls; drains of SMC, JMC, Municipal Councils and Committees, UEED, SDA, JDA, LCMA, Smart City companies and the Public Works (R&B) Department 1.0 m wide or more | Jammu and Kashmir | Major drains; owner's consent (I&FC for canals, city channels, the flood spill channel and khuls), design water level and flap gate | 5.2, 5.8.5 |
| Salal, Baglihar, Dul Hasti and Ranjit Sagar dams; the Tawi barrage | Chenab, Ravi, Tawi | Releases and gate operation to be included in river levels (operating rules and release records [TBC]); releases reported unannounced since April 2025 | 5.8.3, 5.8.5 |
| River mouths subject to sand-bar closure | None in Jammu and Kashmir | Not applicable (Clause 5.1.4) | 5.13.1 |
To be prepared. This annex will list and map (a) the major drains of each basin plan, (b) the riverine outfall reaches where backwater shall be modelled, with their upstream and downstream limits and the source of their design flood levels, and (c) the river mouths and creek inlets subject to seasonal sand-bar closure, with the most recent pre-monsoon bar crest levels and any I&FC mouth-maintenance programme. It needs I&FC river and canal records, design and recorded flood levels, reservoir operating rules, mouth-condition, dredging and bar-cutting records and pre-monsoon bar surveys (I&FC), the drain inventories of SMC and other local bodies, basin stormwater master plans (Chapter 11), and base mapping from the Survey of India and NRSC. Until it is published: every river, I&FC canal, the flood spill channel of the Jhelum from Padshahi Bagh to the Wular, the Tsunth Kol, the Padshahi Canal and the other city channels of Srinagar, the Dal's outlets at Dal Gate and Nallah Amir Khan, the Telbal, Doodhganga, Sukhnag and Sind nallahs and the other nallahs that feed the lakes and marshes of the Kashmir valley, the Devak and the Basantar, the Balol, Thather and Bhalwal khads and the other khads of Jammu and the Kandi belt, the Ranbir and Sindh canals and any other canal or zamindari khul that receives storm water, any drain built or held by SMC, JMC, a Municipal Council or Municipal Committee, UEED, SDA, JDA, LCMA, a Smart City company or the Public Works (R&B) Department with an internal width of 1.0 m or more, and every khad or nallah that drains 8 ha or more and every tidal creek is a major drain (Clause 5.2); the water bodies of Table 5B.1 are riverine outfall reaches (Clause 5.8.1); and the mouths of the coastal States' rivers (there is none in Jammu and Kashmir) are assumed closed at the start of the SW monsoon unless I&FC certifies otherwise (Clause 5.13.2).
Table 5B.2 — Attributes of the Annex 5B layers (layout)
| Field | Content | Unit or format |
|---|---|---|
| feature_id | Unique identifier | text |
| name | Name of the drain, river, canal, creek or mouth | text |
| category | Major drain; riverine outfall reach; mouth subject to sand-bar closure | text |
| clause | Clause of Chapter 5 under which it is listed | text |
| reach_limits | Upstream and downstream limits of the reach | text |
| design_flood_level_source | I&FC design or highest recorded flood level, or hydraulic model (Clause 5.8.2) | text |
| reservoir_release | Upstream reservoir or tank and its operating rule, where any (Clause 5.8.3) | text |
| bar_crest_level | Most recent pre-monsoon bar crest level, for mouths | m (Survey of India datum) |
| mouth_programme | I&FC mouth-maintenance programme and certification (Clause 5.13.2) | text |
| source | Source agency and date | text |
| geometry | Line (drains and reaches) or point (mouths) | line / point |
Annex 5C — Worked example: outfall-closed check for a site on a khad draining to the Tawi in Jammu
Supports Clauses 5.9, 5.10, 5.11 and 5.12 of Chapter 5 and Clause 4.6.6 of Chapter 4.
Illustrative — not design values. This example applies the outfall-closed check of Clause 5.10 to the revised detention facility of Annex 4C. The site, its levels and its receiving drain are invented to show the method. No tidal level is used: the tide enters only through the illustrative statements in Table 5C.1 about whether the receiving drain is above or below the site outlet.
Inputs
5C.1 The site is the 2.0 ha flood-sensitive site of Annex 4C, a colony in Jammu. It discharges through its own outlet chamber and a flap gate to a public storm drain that joins a khad running across the Kandi belt to the Tawi, whose level rises when the khad runs full and when the Tawi is in flood, as on 26 August 2025, so Clause 5.10.1 applies to the facility. To show the method, this example uses the two 6-hour lock windows of Clause 5.10.3, as the coastal editions of this Manual do. In Jammu and Kashmir an outfall to a khad or nallah whose invert is below its design level is closed for as long as the computed level of the stream stays above it, or for the whole storm where no hydrograph of the stream has been computed; an outfall that the Jhelum can close has a single lock of at least 7 days; and an outfall below the design level of a reservoir, lake or nambal is closed for the whole storm, all under Clause 5.8.5, so in each of those cases the facility must store or pump the whole storm volume (Clause 5.9.4); that needs more storage, or pumping, than this example shows. The routing, the volume balance of Clause 5.10.4 and the assessment are the same. The public drain's own outfall to the khad would also need the debris rack and the bulking factor of Clause 6.3.6 and an invert above the range of bed movement of Clause 5.8.5(c); on the Kandi the facility could infiltrate where the Kandi recharge rule allows it, while on the valley floor of Srinagar or a hill slope it would be a lined tank, not an infiltrating basin (Clause 4.11).
Table 5C.1 — Inputs (Illustrative — not design values)
| Item | Value | Basis |
|---|---|---|
| Facility | Revised facility of Annex 4C: 2,500 m² plan area, vertical walls; 170 mm orifice at the floor; 460 mm orifice, invert 0.53 m | Annex 4C, Table 4C.14 |
| Storm | 1% AEP, 48 h, peak day last, AMC III; 72 h also run | Clause 5.10.2 |
| Inflow | Post-development 1% AEP hydrographs of Annex 4C (48 h: 8,420 m³; 72 h: 9,468 m³) | Annex 4C |
| Receiving drain levels at the connection, J1, J2 and J3 | Below the site outlet invert (from the drain owner's model) | Illustrative input |
| Receiving drain during each lock window | Backs up above the site outlet invert, so the site cannot discharge | Illustrative input; Clause 5.10.3(b) |
| Flap gate on the site outlet | Set 0.15 m below the orifice inverts in the outlet chamber, so that outside the lock windows its opening head and head loss do not affect the orifice control | Illustrative input; to be confirmed from the certified curve (Clause 5.11.2) |
| Lock windows | Two of 6 h each, starts 12.4 h apart (semi-diurnal tide) | Clause 5.10.3(a) |
| Pumps | None | — |
5C.2 Cases of Table 5.2. Because the receiving drain stays below the site outlet in J1, J2 and J3 (Table 5C.1), those cases give the free-outfall results of Annex 4C: in J2 the 1% AEP maximum water level is 1.17 m (2,913 m³), and in J3 (10% AEP, 48 h) it is 0.77 m. R1 and R2 do not apply, because the site does not drain to a river. J4, the outfall-closed check, is worked below.
Lock windows (Clause 5.10.3)
5C.3 The peak 1-hour block of the final 24 hours of the 48-hour storm is 35:35–36:35 h, with 98.2 mm (the 1-hour depth of Table 4C.2). Two runs are made:
- Run A: the first window is centred on that block: 33:05–39:05 h; the second starts 12.4 h later: 45:29–51:29 h.
- Run B: the first window starts at that block: 35:35–41:35 h; the second: 47:59–53:59 h.
For the 72-hour storm, every time is 24 h later.
5C.4 Gravity discharge is zero inside each window. Outside the windows the outlet discharges through the orifices of Table 4C.10. The routing is the same level-pool routing as in Annex 4C.
Results
Table 5C.2 — Outfall-closed check results (Illustrative — not design values)
| Storm | Run | Lock windows (h:min) | Maximum stage (m) | Maximum storage (m³) | Time of maximum (h:min) | Largest release after a window (L/s) |
|---|---|---|---|---|---|---|
| 1% AEP, 48 h | A | 33:05–39:05; 45:29–51:29 | 2.01 | 5,019 | 39:05 | 566 |
| 1% AEP, 48 h | B | 35:35–41:35; 47:59–53:59 | 2.10 | 5,238 | 41:35 | 584 |
| 1% AEP, 72 h | A | 57:05–63:05; 69:29–75:29 | 2.00 | 5,012 | 63:05 | 565 |
| 1% AEP, 72 h | B | 59:35–65:35; 71:59–77:59 | 2.09 | 5,233 | 65:35 | 584 |
Run B of the 48-hour storm governs. The first window closes the outlet just as the storm peak arrives, so the whole peak is stored. The second window arrives when the facility has drained to about 0.7 m, below the Stage 2 orifice, and adds little.
5C.5 Volume balance (Clause 5.10.4). Table 5C.3 gives the balance for Run B. The outflow in each period is found by continuity: outflow = storage at start + inflow − storage at end.
Table 5C.3 — Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
| Period (h:min) | Inflow (m³) | Gravity outflow (m³) | Pumped (m³) | Storage at start (m³) | Storage at end (m³) |
|---|---|---|---|---|---|
| 0:00–35:35, before window 1 | 3,817 | 2,213 | 0 | 0 | 1,604 |
| 35:35–41:35, window 1 | 3,634 | 0 | 0 | 1,604 | 5,238 |
| 41:35–47:59, between windows | 941 | 4,423 | 0 | 5,238 | 1,756 |
| 47:59–53:59, window 2 | 28 | 0 | 0 | 1,756 | 1,784 |
| After 53:59 | 0 | 1,784 | 0 | 1,784 | 0 |
| Total | 8,420 | 8,420 | 0 | — | — |
Check for window 1: V_inflow = 3,634 m³ ≤ V_storage available + V_pumped + V_gravity = (5,238 − 1,604) + 0 + 0 = 3,634 m³. The facility therefore needs 5,238 m³ of storage, which the routing confirms.
Table 5C.4 — Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
| Time (h) | Inflow (L/s) | Outlet | Outflow (L/s) | Stage (m) | Storage (m³) |
|---|---|---|---|---|---|
| 24 | 20 | Open | 18 | 0.18 | 445 |
| 28 | 39 | Open | 24 | 0.25 | 621 |
| 32 | 59 | Open | 32 | 0.36 | 906 |
| 34 | 85 | Open | 37 | 0.47 | 1,166 |
| 36 | 286 | Closed | 0 | 0.78 | 1,944 |
| 38 | 106 | Closed | 0 | 1.73 | 4,321 |
| 40 | 66 | Closed | 0 | 1.96 | 4,904 |
| 42 | 51 | Open | 529 | 1.79 | 4,472 |
| 44 | 42 | Open | 204 | 0.87 | 2,181 |
| 46 | 37 | Open | 49 | 0.74 | 1,854 |
| 48 | 33 | Open | 47 | 0.70 | 1,756 |
| 50 | 0 | Closed | 0 | 0.71 | 1,784 |
| 54 | 0 | Closed | 0 | 0.71 | 1,784 |
| 56 | 0 | Open | 43 | 0.58 | 1,459 |
| 60 | 0 | Open | 32 | 0.37 | 921 |
| 66 | 0 | Open | 16 | 0.16 | 397 |
| 72 | 0 | Open | 7 | 0.06 | 162 |
Assessment
5C.6 Clause 5.10.4(a). The facility of Annex 4C reaches 1.17 m in J2, and its spillway crest is at 1.35 m (Annex 4C). In the outfall-closed check the stage reaches 2.10 m, so the spillway would operate. The facility of Annex 4C fails the check.
5C.7 Remedy. Pumping (Clause 5.12) does not help here: during the lock windows the receiving drain is itself closed, and pumping into it would raise its level, which Clause 5.12.3 does not permit. The remedy is more storage. Keeping the plan area of 2,500 m² and the outlets of Annex 4C:
- the facility must hold 5,238 m³, to a stage of 2.10 m;
- the spillway crest is set above that stage, with the 0.15 m clearance recommended in Clause 4.9.3: 2.25 m;
- with the 4.0 m spillway of Annex 4C (head 0.30 m), the maximum level with the spillway flowing is 2.55 m, and with 0.3 m freeboard the top of the walls is at least 2.85 m above the floor.
The outfall-closed check therefore governs the storage: 5,238 m³ against 2,913 m³ from the release-rate checks, about 80% more. A larger plan area would make the facility shallower; the outlet, caps and drawdown would then have to be re-checked, because the stage–discharge relationship changes.
5C.8 Release after the lock. When the first window ends, the stored water is released under a head of about 2 m, at up to 584 L/s. This is above the 100-yr cap of 356 L/s. Clause 5.10.4 allows this, because the release reaches a drain that has itself just reopened, and requires it to be included in the J4 run of the downstream analysis (Clauses 5.4 and 5.9) and reported on Form 5-1, Section H.
5C.9 Drawdown after the storm (Clause 5.10.5). The J1 tidal curve stays below the site outlet (Table 5C.1), so the drawdown of Annex 4C applies: 45.3 h for 90% of the 10-yr storage with the low-flow orifice 50% blocked, within the 48-hour limit of Clause 4.7. In Run B, 90% of the maximum J4 storage is released 22.6 h after the maximum.
5C.10 Other requirements.
- The flap gate on the site outlet is inspected and operated before 15 June each year and after every event in which it closed against a storm flow (Clause 5.11.5).
- The deeper facility is checked for flotation with groundwater at the design groundwater level; in the alluvium, Gurti clay and Nambal peat of the Kashmir valley floor, the Sirowal belt of the Jammu plains, the river terraces and floodplains, and the lake, nambal and reservoir margins without piezometer readings that level is existing ground level (Clauses 4.12.1 and 4.12.3).
- The fence and signs of Annex 4C apply to the deeper facility (Clause 4.15).
Table 5C.5 — Summary (Illustrative — not design values)
| Item | Value |
|---|---|
| Governing case | J4, 1% AEP 48-hour storm, Run B (first window starting at the peak 1-hour block) |
| Storage required | 5,238 m³ (Annex 4C release-rate design: 2,913 m³) |
| Maximum stage | 2.10 m, with 2,500 m² plan area |
| Spillway crest | 2.25 m |
| Top of walls | ≥ 2.85 m above the floor |
| Largest release after a lock window | 584 L/s, to be included in the downstream J4 run |
| Drawdown | Annex 4C result applies: 45.3 h with the low-flow orifice 50% blocked |
Form 5-1 — Downstream and Tailwater Report
Supports Clauses 5.3 to 5.14 of Chapter 5.
Draft form — Jammu and Kashmir Stormwater Design Manual, Draft v1.0. One report for each project. Sites of less than 0.5 ha that meet Clause 5.3.4 may submit Form 5-2 instead, where the Authority accepts it. Attach the plans, model files and hydrographs referred to.
A. Project
Table 5F.1 — Form 5-1: project
| Field | Entry |
|---|---|
| A1. Project name, applicant and location | |
| A2. Project type: site under Chapter 4; drainage project under Chapter 6; regional detention or tank restoration (Clause 5.1.2) | |
| A3. Site or project area (ha) and outfalls | |
| A4. Site Runoff Control Report reference (Form 4-1), where applicable |
B. Extent of the analysis (Clause 5.3; Clause 5.14, item 1)
Table 5F.2 — Form 5-1: analysis points
| Point | Location | Type (Clause 5.3.3 (a) to (e)) | Contributing catchment (ha) | Project area as % of it |
|---|---|---|---|---|
Table 5F.3 — Form 5-1: end point
| Field | Entry |
|---|---|
| B1. End point and reason: 10% point, tank or talab, or major drain or the sea (Clause 5.3.1 (a) to (c)) | |
| B2. Where the end point is a tank or talab: change in maximum water level (m) and in surplus-weir discharge (m³/s); continuation below the weir if the level rises (Clause 5.3.2) | |
| B3. Plan of the analysis extent, showing the site, each point with its contributing area and percentage, and the end point (attach) |
C. Model (Clause 5.4.4; Clause 5.14, item 2)
Table 5F.4 — Form 5-1: model
| Field | Entry |
|---|---|
| C1. Software and version; hydrologic and hydraulic methods (Clause 5.4.4) | |
| C2. Network schematic, with the survey sources for drains and crossings (attach) | |
| C3. Land use and CN of off-site areas (present land use) | |
| C4. Upstream detention included, with evidence that it is built, maintained and documented | |
| C5. Calibration or validation evidence, where available | |
| C6. Scenarios run: existing, with project, and future where the Authority requires it (Clause 5.4.1) | |
| C7. Storms run: AEPs and durations, AMC and areal reduction (Clause 5.4.3) |
D. Results at each analysis point (Clause 5.4.2; Clause 5.14, item 3)
Complete one row for each analysis point, AEP and duration. E = existing; P = with project.
Table 5F.5 — Form 5-1: results by analysis point
| Point | AEP | Duration (h) | Peak flow E / P (m³/s) | Time to peak E / P (h) | Maximum water level E / P (m) | Peak velocity E / P (m/s) | Duration of inundation E / P (h) |
|---|---|---|---|---|---|---|---|
E. Acceptance (Clause 5.5; Clause 5.14, item 4)
Table 5F.6 — Form 5-1: acceptance criteria
| Criterion | Met at every point? | Where not met, the remedy adopted (Clause 5.5.3) |
|---|---|---|
| E1. 1% AEP water level rise ≤ 10 mm at buildings, lowest openings and carriageways (Clause 5.5.1(a)) | ||
| E2. No building newly flooded; no building or road newly failing the Chapter 6 limits (Clause 5.5.1(b)) | ||
| E3. Peak flow not above existing at the minor-system AEP of each element or at 1% AEP (Clause 5.5.1(c)) | ||
| E4. Velocity in lined channels within the lining limit, 3.0 m/s maximum (Clause 5.5.1(d)) | ||
| E5. Velocity in unlined channels, 50% and 10% AEP, not increased by more than 10% (Clause 5.5.1(e)) | ||
| E6. Change in duration of road closure on arterial or emergency routes (Clause 5.5.2) | ||
| E7. Timing exception requested (Clause 5.5.4)? Give the conditions met |
F. Tailwater derivation (Clauses 5.6 to 5.8; Clause 5.14, item 5)
Table 5F.7 — Form 5-1: tailwater derivation
| Field | Entry |
|---|---|
| F1. Tide-table edition and port, or port authority source (Clause 5.7.2(a)) | |
| F2. MHWS, HAT and MSL (m above chart datum) | |
| F3. Connection from chart datum to the Survey of India benchmark and the project datum: offset (m) and source (Clause 5.7.2(b)) | |
| F4. Estuary, creek or canal outfall: levels used and any evidence for a departure from open-coast levels (Clause 5.7.2(c)) | |
| F5. 10% AEP surge and 1% AEP still-water level: values, source, method and record length (Clause 5.7.3) | |
| F6. Wave set-up, for outfalls facing the open sea (Clause 5.7.3(d)) | |
| F7. SLA (m), at least +0.3 m; design life; sensitivity run at twice the SLA for design lives over 50 years (Clause 5.7.4) | |
| F8. Non-tidal tailwater: receiving-system level and source (Clauses 5.6.2, 5.6.3) | |
| F9. River levels and sources; reservoir or tank releases included (Clauses 5.8.2, 5.8.3) | |
| F10. Jhelum-locked outfalls, other rivers, khads and nallahs, reservoir and barrage outfalls, rivers below dams, lakes and nambals, and canals, city channels, khuls or drains of other bodies: operator of each gate and pumping station identified, gate sills, embankment or bund crest, installed permanent capacity, duty point, sump levels and gate-closing stage obtained, with every level tied to a Survey of India benchmark and the gauge and datum named; no I&FC reading in feet converted to metres without the I&FC gauge zero; for the Jhelum, 1% AEP river level from a model and not below the highest recorded level at the nearest CWC gauge transferred (1,589.65 m at Ram Munshi Bagh, 1,595.7 m at Sangam, 1,595.43 m at Khanabal, 1,582.1 m at Safapora; the Wular not below 1,578 m), 10% AEP and minor-system level not below the CWC danger level (1,585.48 m, 1,590.88 m, 1,592.5 m, 1,579.66 m), gravity outfalls closed from the I&FC flood-declaration stage (18 ft at Ram Munshi Bagh), single river lock of not less than 7 days and its source, drain routed as closed storage with its whole catchment and present storage, pumping confirmed available (permanent pumps only, not more than installed capacity less the largest pump; mobile units not counted), each station listed with its capacity, pumps operable at the design river level, the joint drain–pump–river analysis where a DPR is required, the breach depth reported at each station and flood-sensitive building, and the gate-failure check; for another river, the highest recorded CWC level transferred (321.1 m at Sidhra, 324.29 m at Akhnoor and the other levels of Clause 5.8.5(b)) or a modelled or surveyed flood level and its source; for a khad or nallah, the 1% AEP study with the bulking and blockage of Clause 6.3.6, the surveyed flood marks and their sources, any I&FC flood study, the bed survey and range of bed movement, the invert at least 0.5 m above the highest surveyed bed level, the scour depth of the foundation and the Gair Mumkin Khad status of the land; for a reservoir or barrage pond, the custodian's consent, MWL or FRL plus design-flood surcharge (FRL + 0.5 m where neither is published: Salal 488.18 m, Baglihar 840.5 m, Ranjit Sagar 528.41 m), not below the highest recorded level, outfall below it treated as closed for the whole storm, waterbody starting at FRL or pond level, no gate operation or reservoir attenuation credited without the custodian's written rule; for an outfall below a dam or barrage, the design storm with the largest recorded release, placed before, during and after the storm, whether announced or not; for a lake or nambal, the custodian's consent (LCMA, WUCMA, the Wildlife Department, the J&K Wetland Authority), the surveyed spill level plus head, closure for the river lock where the river shuts the outlet, no storage credited in a marsh without records, and the sediment trap and dry-weather-flow interception before the outfall; for a canal, city channel, the flood spill channel or a khul, I&FC's consent, its level computed with all the water it receives, the flood spill channel taken as Jhelum-locked; I&FC consent, and the bye-law, master-plan, wetland and court lines checked; owner's consent, permitted rate, design water level or computed channel level, and flap gate (Clause 5.8.5) |
G. Joint cases (Clause 5.9; Clause 5.14, item 6)
Table 5F.8 — Form 5-1: joint-case results
| Case | Rainfall | Tailwater used (m, project datum) | Applies? | Governing result (storage, level, pipe size or pump capacity) |
|---|---|---|---|---|
| J1 | ||||
| J2 | ||||
| J3 | ||||
| J4 | ||||
| R1 | ||||
| R2 |
H. Outfall-closed check (Clause 5.10; Clause 5.14, item 7)
Table 5F.9 — Form 5-1: outfall-closed check
| Field | Entry |
|---|---|
| H1. Reason the check applies (Clause 5.10.1) | |
| H2. Storm: AEP, 48 h and 72 h, AMC III (Clause 5.10.2) | |
| H3. Lock duration and basis: default of two 6-hour windows, or site study (Clause 5.10.6); extension for sand-bar closure (Clause 5.13.5) | |
| H4. Lock windows of the two runs (start and end times) (Clause 5.10.3(d)) | |
| H5. Maximum stage in each facility, against its 1% AEP maximum water level (Clause 5.10.4(a)) | |
| H6. Maximum stage in the minor and major systems, against the Chapter 6 limits (Clause 5.10.4(b)) | |
| H7. Property connections: surcharge level, or non-return valves fitted (Clause 5.10.4(c)) | |
| H8. Stage hydrographs (attach) | |
| H9. Drawdown after the storm under the J1 tidal curve, and pumping where needed (Clause 5.10.5) |
Table 5F.10 — Form 5-1: volume balance for each lock window (Clause 5.10.4)
| Period | Inflow (m³) | Gravity outflow (m³) | Pumped (m³) | Storage at start (m³) | Storage at end (m³) |
|---|---|---|---|---|---|
| Before window 1 | |||||
| Window 1 | |||||
| Between windows | |||||
| Window 2 | |||||
| After window 2 |
I. Gates and valves (Clause 5.11; Clause 5.14, item 8)
Table 5F.11 — Form 5-1: schedule of flap gates, tide gates and non-return valves
| Location | Type | Size (mm) | Invert (m, project datum) | Certified head–discharge data (reference) | Stop-log or penstock (outfalls > 600 mm) |
|---|---|---|---|---|---|
J. Pumped outfalls (Clause 5.12; Clause 5.14, item 9)
Table 5F.12 — Form 5-1: pumped outfalls
| Field | Entry |
|---|---|
| J1. Reason pumping is needed (Clause 5.12.1) | |
| J2. Duty capacity (m³/s) at the static head for the J2 tailwater; standby capacity (Clause 5.12.2) | |
| J3. Effect on the receiving water level (Clause 5.12.3) | |
| J4. Power supply: two independent supplies, or standby generation with 72 h of fuel; automatic changeover (Clause 5.12.4) | |
| J5. Level of electrical panels, controls, generators and fuel, against the higher of the 1% AEP flood level + 0.5 m and HAT + surge + SLA + 0.5 m (Clause 5.12.5) | |
| J6. Discharge arrangement (Clause 5.12.6); controls, alarms and logging (Clause 5.12.7); screens (Clause 5.12.8) |
K. Sand bar (Clause 5.13; Clause 5.14, item 10)
Table 5F.13 — Form 5-1: sand-bar assumption
| Field | Entry |
|---|---|
| K1. River mouth or creek inlet concerned | |
| K2. Mouth assumed closed, or open with I&FC certification attached (Clause 5.13.2) | |
| K3. Bar crest level from the most recent pre-monsoon survey (m) and the closed-mouth tailwater (Clause 5.13.3) | |
| K4. Extension of the lock duration, where required (Clause 5.13.5) |
L. Inspection and maintenance (Clause 5.14, item 11)
Table 5F.14 — Form 5-1: inspection and maintenance
| Field | Entry |
|---|---|
| L1. Gate and valve inspection before 15 June and after closure events (Clause 5.11.5) | |
| L2. Pump test runs before 15 June (Clause 5.12.9) | |
| L3. Other requirements for the maintenance plan (Chapter 10) |
M. Statement by the registered professional (Clause 10.6)
I state that this report has been prepared under Chapter 5 of the Jammu and Kashmir Stormwater Design Manual (Draft v1.0), that the results reported are reproduced by the models submitted, and that every departure from Chapter 5 is listed with its reason. The Professional Design Certificate (Form 10-3) is attached.
Table 5F.15 — Form 5-1: statement by the registered professional
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Empanelment number, where Clause 10.6.1 requires it | |
| Organisation | |
| Signature | |
| Date |
Draft form — Jammu and Kashmir Stormwater Design Manual, Draft v1.0.
Form 5-2 — Simplified Downstream Statement (small sites)
Supports Clause 5.3.4 of Chapter 5.
Draft form — Jammu and Kashmir Stormwater Design Manual, Draft v1.0. For sites of less than 0.5 ha. The Authority may accept this statement in place of the full analysis only where every answer in Section B is "Yes". Otherwise submit Form 5-1.
A. Site
Table 5F.16 — Form 5-2: site
| Field | Entry |
|---|---|
| A1. Project name, applicant and location | |
| A2. Site area (ha), less than 0.5 ha | |
| A3. Receiving public drain: name or reference, type and size | |
| A4. Site Runoff Control Report reference (Form 4-1) |
B. Conditions (Clause 5.3.4)
Table 5F.17 — Form 5-2: conditions
| Condition | Yes / No | Evidence |
|---|---|---|
| B1. The receiving public drain has documented capacity for its minor-system design flow (Chapter 6) | ||
| B2. No flood-prone location is recorded within 500 m downstream of the site outfall. Records checked: local body, SMC, J&K SDMA, I&FC (Clause 5.3.3(d)) | ||
| B3. The site does not drain to a tidal or backwater-affected outfall |
C. Route plan
Table 5F.18 — Form 5-2: attachments
| Attachment | Attached? |
|---|---|
| C1. Plan of the drainage route from the site outfall for 500 m downstream, with the receiving drain and any recorded flood-prone locations | |
| C2. Copy or reference of the drain capacity record |
D. Statement
I state that the site meets the conditions of Clause 5.3.4 as shown above, and that the records listed have been checked.
Table 5F.19 — Form 5-2: statement
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Jammu and Kashmir Stormwater Design Manual, Draft v1.0.