Draft v1.0 prepared by NEER. Not adopted by the Government of the Union Territory of Jammu and Kashmir or the Administration of the Union Territory of Ladakh, and has no legal force. About this draft

Chapter 5Downstream and Tailwater Analysis


5.1 Purpose and scope

5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.

  • The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
  • The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.

5.1.2 This chapter applies to:

  • (a) every site to which Chapter 4 applies;
  • (b) every minor- and major-system drainage project under Chapter 6; and
  • (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.

5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.

5.1.4 No tidal outfalls in Jammu and Kashmir. Jammu and Kashmir is landlocked and mountainous: it has no coast, no tide and no Coastal Regulation Zone, and the south-west monsoon and the western disturbances reach it only as rainfall and snow, which are dealt with in Chapter 2, not as a tidal or surge level. No outfall in the Union Territory discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Jammu and Kashmir: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials, and shall resist abrasion by gravel and boulders and the action of ice), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other editions. In Jammu and Kashmir the receiving water is one of six kinds: the Jhelum on the floor of the Kashmir valley, held above Srinagar and the other valley towns by its embankments, which the towns reach through gates and dewatering stations and which shuts their gravity outfalls for days once it rises; another river, such as the Tawi at Jammu, the Chenab at Akhnoor, the Ujh at Kathua or the Basantar at Samba, reached directly or through a gate; a khad (खड्ड; a seasonal hill torrent or ravine stream) or a nallah (नाला; نالا; a natural or artificial drainage channel), ungauged, seasonal and laden with boulders, whose bed rises and falls in a single flood; a reservoir or barrage pond, such as Salal, Baglihar, Ranjit Sagar or the pond of the Tawi barrage; a sar (सर्; a lake), a nambal (नंबल्; a marsh or shallow lake choked by vegetation) or a talab, such as the Dal, whose outlet the river shuts, the flood-absorption marshes of Hokersar and Anchar, the Wular, or Mansar and Surinsar; or a canal, a city channel or a khul (a village irrigation channel), such as the Ranbir Canal, the Tsunth Kol or the flood spill channel; and:

  • (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
  • (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
  • (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by the Jhelum or another river, a khad or nallah, a reservoir or barrage pond, a lake or nambal, a canal, city channel or khul, or a receiving drain, with the river lock of Clause 5.8.5(a) and the closures of Clause 5.8.5(b) to (f) in place of the tidal lock windows.

Commentary. The drains of Jammu and Kashmir's towns fail in places that site design does not see, and in six different ways. The first is the Jhelum. Srinagar lies on the floor of the Kashmir valley beside a river that its embankments hold above parts of the city in flood, and its drains reach the river through gates and pumping stations, about 89 of them in 2019 (Srinagar Master Plan 2035) and 104 permanent dewatering stations in 2026 (as reported). In September 2014, 34% of the Srinagar planning area, 262 km², was flooded (Srinagar Master Plan 2035, §4.2), and the floods of that month killed 304 people in the State, 217 in the Jammu division and 87 in Kashmir (CAG, Report No. 4 of 2016); the flood spill channel that is meant to carry the Jhelum round the city had been reduced by sediment from a design capacity of 17,000 cusecs to 4,000, and the audit found that the impact of the floods "may have been mitigated" had the schemes to restore it been carried out as approved (CAG, Report No. 4 of 2016). Srinagar's own rain in that flood was modest, about 140 to 152 mm in four days at its gauges, against 400 to 600 mm on the catchments of south Kashmir (Ray et al., 2015): the city flooded from the river. The second is the other rivers. The Tawi at Jammu set a new highest level of 321.1 m at Sidhra on 26 August 2025, 2.25 m above the level of 2014, on the day Jammu recorded 380 mm in 24 hours (IMD; CWC data, as copied by SANDRP); and the Chenab at Akhnoor rose to 43 ft on 3 September 2025 against 61 ft in 1992 (as reported). The third is the khad and the nallah. Jammu's Kandi belt has "more than 100 small and big dry khads which have flash floods during the rainy season" (Jammu Master Plan 2032, §7.3.2), none of them gauged, and much of its drainage land is recorded as Gair Mumkin Khad, which the master plan proposes to reduce to the "true Khad" (§12.2.3). The fourth is the reservoir: the Chenab's dams at Dul Hasti, Baglihar and Salal and the Ranjit Sagar dam on the Ravi pass floods and flush silt into the rivers below, and since April 2025 their releases are reported to go unannounced downstream (as reported). The fifth is the lake and the nambal: the Dal drains to the Jhelum through the Dal Gate, whose flood-gates close when the river rises (Grierson, A Dictionary of the Kashmiri Language, p. 210), and the marshes that absorbed the Jhelum's floods west and north of Srinagar have been built over and silted, Hokersar losing "nearly half of its flood storage" (as reported). The sixth is the canal and the city channel: the Tsunth Kol, the Padshahi Canal and the flood spill channel are under I&FC by statute (Water Resources Act 2010, s.81 [TBC on the section number]). The outfalls also belong to one body while the drains above them belong to others: the rivers, nallahs, khads, embankments and channels are I&FC's, the reservoirs NHPC's, JKSPDC's or Punjab's, the Dal LCMA's and the Wular WUCMA's, and the drains and pumping stations UEED's, the municipal bodies' and the Public Works (R&B) Department's, and no rule divides them (Chapter 6, Clause 6.9). No document found during research sets a design level for any river, khad, reservoir, lake or canal outfall in the Union Territory, or a design standard for any town drain. A detention basin that meets every release rate in Chapter 4 still fails if the Jhelum has shut its outfall, if the khad has buried its outlet in boulders, or if the lake or reservoir is full. This chapter makes these failure modes part of the design. Jammu and Kashmir has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.


5.2 Definitions

Term Meaning in this Manual
Analysis point A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3).
Contributing catchment The whole area draining to an analysis point, on and off site.
Major drain A channel listed as a major drain in the basin plan or Annex 5B, or any river, I&FC canal, the flood spill channel of the Jhelum from Padshahi Bagh to the Wular, the Tsunth Kol, the Padshahi Canal and the other city channels of Srinagar, the Dal's outlets at Dal Gate and Nallah Amir Khan, the Telbal, Doodhganga, Sukhnag and Sind nallahs and the other nallahs that feed the lakes and marshes of the Kashmir valley, the Devak and the Basantar, the Balol, Thather and Bhalwal khads and the other khads of Jammu and the Kandi belt, the Ranbir and Sindh canals and any other canal or zamindari khul that receives storm water, any drain built or held by SMC, JMC, a Municipal Council or Municipal Committee, UEED, SDA, JDA, LCMA, a Smart City company or the Public Works (R&B) Department with an internal width of 1.0 m or more, and every khad or nallah that drains 8 ha or more, or a tidal creek.
Chart datum (CD) The datum of the published tide tables and nautical charts, to which tidal heights are referred.
Mean sea level (MSL) Average sea level over a long period at a tide gauge.
MHWS Mean high water springs: the average of high waters at spring tides.
HAT Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years).
Storm surge The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones.
Still-water level Astronomical tide plus surge, excluding individual waves.
Sea-level allowance (SLA) The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4).
Tailwater The water level at the downstream end of a drain, outlet or storage.
Tide-lock The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge.
Lock window A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero.
Sand bar A bar of beach sand that partly or fully closes a river mouth or creek inlet.
Project datum The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2).

5.3 Extent of the downstream analysis

5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:

  • (a) the point at which the project area is 10% or less of the contributing catchment;
  • (b) the next tank, talab or other waterbody with a surplus weir or controlled outlet; or
  • (c) the next major drain, or the sea.

The end point itself shall be analysed (Figure 5.1).

5.3.2 Where the analysis ends at a tank or talab under 5.3.1(b), it shall report:

  • the change in the tank's maximum water level; and
  • the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.

If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.

5.3.3 Analysis points shall be set at least at:

  • (a) each site outfall;
  • (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
  • (c) each culvert, bridge or road crossing;
  • (d) each location recorded as flood-prone by the local body, SMC, J&K SDMA or I&FC; and
  • (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.

5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:

  • the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
  • no flood-prone location is recorded within 500 m downstream; and
  • the site does not drain to a tidal or backwater-affected outfall.

Figure 5.1 — Extent of downstream analysis (10% rule or next tank / major drain) Plan sketch of a catchment showing a development site, downstream analysis points A to D along the receiving drain, the contributing area at each point, the point where the site is 10% of the contributing area, and a tank that ends the analysis if reached first. Not to scale. Extent of downstream analysis — plan, not to scale (Clause 5.3) Major drain / river Tank (surplus weir) Development site A B C D A Site outfall site = 100% of contributing area B Confluence site ≈ 30% → continue C Site ≤ 10% of contributing area → analysis may end here (Clause 5.3.1 a) D Next tank or major drain → ends analysis if reached before C Contributing area at C Contributing area at B Development site At every analysis point (A, B, C …), pre- vs post-development, all storage durations: capacity of channel, pipe and culvert · 1% AEP water level at buildings and roads · velocity · timing of combined peaks · tailwater at the end point (Clause 5.6). Percentages are illustrative.

Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next talab or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).

Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Jammu and Kashmir. In the Kashmir valley, where a colony's drain runs to a dewatering station that lifts it over the embankment into the Jhelum, which carries it through Srinagar, or round the city by the flood spill channel, to the Wular many kilometres below, and in the Jammu plains and hills, where a colony's drain runs down a khad across the Kandi belt to the Tawi, the Ujh, the Basantar or the Chenab, the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.


5.4 What the analysis must check

5.4.1 Scenarios. Each analysis shall compare:

  • (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
  • (b) With project: the same, with the project and all its controls (Chapter 4) in place.

Where the Authority's basin plan defines future land use, the Authority may also require:

  • (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.

5.4.2 Quantities to be checked at every analysis point:

  • (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
  • (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
  • (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
  • (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
  • (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.

5.4.3 Storms. The analysis shall use:

  • 50%, 10% and 1% AEP;
  • the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
  • the 24-, 48- and 72-hour storms in every case.

The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.

5.4.4 Method. The analysis shall:

  • use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
  • include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
  • not use the Rational Method at any analysis point, because it cannot represent timing.

Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.

5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.

Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the Kashmir valley, whose towns drain to a Jhelum held above them by its embankments: in September 2014 water stood up to 16 ft deep in parts of Srinagar, and for up to 25 days in places (Alam et al., 2018, as cited by Malik, 2021), and 34% of the Srinagar planning area, 262 km², was under water (Srinagar Master Plan 2035, §4.2); once the river shuts the gravity outfalls, the city's dewatering stations, reported at about 2,300 cusecs in 2026, can lift only about 0.3 mm of rain an hour from the 767 km² of its drainage master plan (a NEER reading of figures as reported). Detention that prolongs releases can lengthen that time even when it lowers the peak.


5.5 Acceptance criteria

5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":

  • (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
  • (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
  • (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
  • (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
  • (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.

5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.

5.5.3 Where the criteria are not met, the project shall do one or more of the following:

  • (a) reduce release rates or increase storage (Chapter 4);
  • (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
  • (c) contribute to a regional facility under Clause 4.13; or
  • (d) under Clause 5.5.4, change the release strategy.

5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:

  • (a) the varied strategy meets 5.5.1;
  • (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
  • (c) the outfall-closed check (Clause 5.10) is met.

Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.


5.6 Tailwater: general and non-tidal outfalls

5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.

5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:

  • for a receiving pipe, its obvert; or
  • for a receiving open drain, its full-bank level less freeboard (Chapter 6).

5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.

5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.

5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.


5.7 Tidal tailwater: datums, surge and sea-level allowance

5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:

Table 5.1 — Design tailwater levels for tidal outfalls

Design case Tailwater
Minor-system design (Chapter 6) MHWS + SLA
Major-system design and storage design HAT + surge + SLA, with the surge term defined in Clause 5.7.3
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA

The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.

5.7.2 Sources and datums.

  • (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
  • (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
  • (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Jammu and Kashmir, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
  • (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.

5.7.3 Storm surge.

  • (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
  • (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
  • (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
  • (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.

5.7.4 Sea-level allowance. The SLA shall be:

  • (a) +0.3 m minimum for every element;
  • (b) greater than 0.3 m where the State, a Development Authority or the Authority adopts a higher projection for the planning area; and
  • (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.

Figure 5.2 — Tidal outfall section with flap gate and design tailwater levels Schematic section through a drain discharging to a tidal creek or river mouth. It shows the headwall, flap gate and non-return valve, the drain stage, and the design tailwater levels: mean sea level, MHWS, MHWS plus sea-level allowance (minor system), HAT, HAT plus surge, and HAT plus surge plus sea-level allowance (major system), with a seasonal sand bar at the mouth. Not to scale. Tidal outfall — schematic section, not to scale (Clauses 5.6–5.13) Seasonal sand bar (Clause 5.13) Drain stage upstream of gate Open drain / storage (outfall-closed check, Clause 5.10) Flap / tide gate (Clause 5.11) Floor ≥ 1% AEP level + 0.5 m (Ch 6) Property connection with non-return valve Mean sea level MHWS MHWS + 0.3 m: minor-system tailwater HAT HAT + surge HAT + surge + 0.3 m: major-system tailwater +0.3 m sea-level allowance (minimum) +0.3 m Notes Levels are diagrammatic. Datums from the current NHO / Survey of India tide tables, reduced to the project datum (Clause 5.7). Joint case (Clause 2.12 b): 10-yr 48 h storm with the 1% AEP still-water level + 0.3 m. Riverine reaches: see Clause 5.8. Outfall invert below the 1% still-water level → flap or tide gate required; property connections need non-return valves.

Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.

Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:

  • MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
  • MHWS to HAT for a major storm; and
  • "Effect of climate change: additional 0.3 m".

CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Jammu and Kashmir has no coast, and the surge term does not arise in the Union Territory, whose largest floods come from long storms over the hills, as in September 2014, when monsoon moisture met a western trough (Chapter 2).

Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Jammu and Kashmir, which has no coast, and Annex 5A is not prepared for the Union Territory (Clause 5.1.4).


5.8 Riverine backwater

5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:

  • the Jhelum through Srinagar, past the Ram Munshi Bagh gauge, with the flood spill channel from Padshahi Bagh to the Wular and every drain, nallah, lake and nambal behind the embankments that drains to them by gate or by pumping (Clause 5.8.5(a), (e) and (f));
  • the Jhelum above Srinagar, past Khanabal and Sangam, at Anantnag, Bijbehara and Pampore (Clause 5.8.5(a));
  • the Jhelum below Srinagar, past Safapora, at Sumbal and Bandipora, the Wular, and the outlet reach at Ningli, Sopore and Baramulla (Clause 5.8.5(a) and (e));
  • the Tawi at Jammu, past the Jammu Tawi (Sidhra) gauge, with the Tawi barrage, and at Udhampur, past Kishanpur Manwal (Clause 5.8.5(b) and (d));
  • the Chenab at Akhnoor, below the Salal dam, and at Doda (Prem Nagar), Ramban, Reasi and Kishtwar, with the Dul Hasti, Baglihar and Salal reservoirs (Clause 5.8.5(b) and (d));
  • the Ujh at Kathua, the Basantar at Samba, the Devak at Udhampur, and the Ravi at Basantpur and along the Ranjit Sagar reservoir (Clause 5.8.5(b) and (d));
  • the tributaries of the Jhelum above the valley floor, among them the Lidder, the Rambiara, the Romushi, the Doodhganga, the Vishow and the Sind (Clause 5.8.5(b));
  • the khads and nallahs of the towns, among them the Balol, Thather and Bhalwal khads and the other khads of the Kandi belt at Jammu, Samba, Kathua and Hiranagar, the nallahs and khads of the hill towns of the Pir Panjal and the Chenab valley, and the Telbal, Sukhnag and other nallahs that feed the lakes and marshes of the Kashmir valley (Clause 5.8.5(c));
  • the Dal, Nigeen, Brari Nambal, Khushalsar, Gilsar, Anchar, Hokersar, Nambal Narkur, Shallabugh, Hygam, Manasbal and Mansar–Surinsar, and the other lakes, nambals and talabs (Clause 5.8.5(e));
  • the Ranbir and Sindh canals, the Tsunth Kol, the Padshahi Canal and the other city channels, the zamindari khuls, and any drain or channel of another body that receives storm water (Clause 5.8.5(f)); and
  • elsewhere: any river or I&FC channel listed in Annex 5B.

5.8.2 River levels. River water levels shall be taken from:

  • (a) I&FC design flood levels or recorded highest flood levels for the reach, where published; or
  • (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
    • the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
    • the tidal boundary of Clause 5.7 at the mouth; and
    • the sand-bar condition of Clause 5.13.

5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example on the Chenab, the Dul Hasti and Baglihar dams in Kishtwar and Ramban districts and the Salal dam in Reasi district above Akhnoor; the Ranjit Sagar dam on the Ravi, on the Punjab border of Kathua district; and the Tawi barrage at Jammu), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.

5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:

  • (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
  • (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).

The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.

5.8.5 The Jhelum and its embankments, other rivers, khads and nallahs, reservoirs and barrages, lakes and wetlands, canals, city channels and khuls, and I&FC consent.

  • (a) The Jhelum in the Kashmir valley: embanked, gated and pumped. For an outfall in Srinagar or another town of the Kashmir valley floor, among them Anantnag, Bijbehara, Pampore, Sopore, Baramulla, Sumbal and Bandipora, to the Jhelum directly, through a gate in its embankments or in a bund, through a dewatering or drainage pumping station, or to the flood spill channel, or into a drain, nallah, lake or nambal that itself discharges in one of those ways, the designer shall identify the body that operates each gate and pumping station, and obtain from its written records the sill of each gate, the crest of the embankment or bund, the installed permanent pumping capacity of each station and its duty point, its sump levels, and the river stage at which its gravity gate is shut. No list of Srinagar's stations with these values was found during research [TBC]. Every level shall state its datum and its connection to a Survey of India benchmark, and shall name the gauge with which it is compared.
    • Two gauge systems. The Jhelum is gauged by CWC in metres, with no datum stated in the lists found (taken as metres above mean sea level [TBC]), and by I&FC on staff gauges read in feet from a gauge zero that is not published, so that a reading can be negative. No I&FC reading in feet shall be converted to metres, or compared with a CWC level, until I&FC gives the reduced level of that gauge's zero tied to a Survey of India benchmark (set by this Manual). The two systems do not describe the same levels: at Ram Munshi Bagh the CWC highest flood level stands 3.20 m (10.5 ft) above the CWC danger level of the list of 2018, while the I&FC peak of September 2014 is reported as about 29.5 ft against a danger stage of 21 ft, 8.5 ft above it (a NEER reading of figures as reported).
    • Design river level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system and storage cases (Clause 5.8.4(b)), the 1% AEP river level at the outfall, from a hydraulic model under Clause 5.8.2(b) of the Jhelum, the flood spill channel and the Wular together. Neither the Flood Plain Zones Act 2005 nor Part VI of the Water Resources Act 2010 has been used to fix a flood level for any reach (Chapter 7), so no level is available from a floodplain study. The level shall in no case be less than the highest recorded level at the nearest CWC gauge on the river, transferred to the outfall. The levels found during research (Table 5B.1), all from SANDRP's copies of the CWC lists, with no datum stated and none read in a CWC site sheet [TBC], are: at Ram Munshi Bagh in Srinagar, a warning level of 1,584.87 m, a danger level of 1,585.48 m and a highest flood level of 1,588.99 m (8 September 2014) in the list of 2022, against 1,585.53 m, 1,586.45 m and 1,589.65 m for the same gauge and the same flood in the list of 2018; at Sangam near Anantnag, a warning level of 1,589.96 m, a danger level of 1,590.88 m and a highest level of 1,595 m (4 September 2014) in 2022, against 1,595.7 m in 2018; at Khanabal near Anantnag, a danger level of 1,592.5 m and a highest level of 1,595.43 m, set on 3 September 2025; and at Safapora, above the Wular, a warning level of 1,579.36 m, a danger level of 1,579.66 m and a highest level of 1,582.1 m (9 September 2014). Where two highest levels are given for the same gauge and flood, the higher applies until CWC confirms the level in its site sheet: 1,589.65 m at Ram Munshi Bagh and 1,595.7 m at Sangam [TBC]. The danger levels are thresholds that CWC lowered by 0.3 to 0.7 m between the two lists, and the values of 2022 apply. For an outfall on the shore of the Wular, or to a drain or channel that ends in it, the tailwater shall not be less than the Wular's danger level of 1,578 m given by I&FC (as reported; datum taken as metres above mean sea level [TBC]) nor than the level at Safapora transferred; for Sopore and Baramulla, below the Wular's outlet at Ningli, the level shall be taken from a model of the outlet reach or from flood marks of September 2014 surveyed at the outfall, and not less than the Wular's danger level, until CWC publishes a level for a gauge on that reach [TBC]. Where a later flood has exceeded a listed level, the later level governs. The recorded level shall be transferred along the river with the water-surface slope of the flood that set it, from the CWC gauge records or from the model; until either is available, the recorded level of the nearest gauge upstream applies unchanged at the outfall, except that between two gauges on the same river with no tributary joining between them, as at Pampore between Sangam and Ram Munshi Bagh, the level may be interpolated linearly by river distance between their highest recorded levels (set by this Manual).
    • 10% AEP level. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), and for the minor-system tailwater of Clause 5.1.4(b), the level shall be taken from the same model or a frequency analysis of the gauge record, and not less than the CWC danger level at the nearest gauge, transferred in the same way: 1,585.48 m at Ram Munshi Bagh, 1,590.88 m at Sangam, 1,592.5 m at Khanabal and 1,579.66 m at Safapora (SANDRP's copy of the CWC list of 2022) (set by this Manual). I&FC gives its own stages: at Ram Munshi Bagh, flood declaration at 18 ft and danger at 21 ft; at Sangam, flood declaration at 21 ft and danger at 25 ft; and at Asham, 14 ft and 16.5 ft; at Sangam and Asham the two labels are reported the other way round in some accounts, and a danger stage of 23 ft is also reported at Sangam (as reported) [TBC]. They are used for the closure of the next item, and where I&FC gives the reduced level of a gauge's zero, the 10% AEP level at that gauge shall also be not less than its danger stage converted with it.
    • Gravity outfalls closed. Every gravity outfall to the Jhelum, to the flood spill channel or to a lake, nambal or channel that the Jhelum backs up shall be taken as closed from the time the river reaches the I&FC flood-declaration stage at the governing gauge, 18 ft at Ram Munshi Bagh for Srinagar and 21 ft at Sangam for Anantnag, Bijbehara and Pampore until I&FC confirms its labels [TBC], or from the time the river level beyond the gate reaches the outfall invert or the level at which its gate is shut, if that is earlier, and shall stay closed for the whole of the river lock of this item. While the gates are shut, the town drains only by storage and pumping (set by this Manual).
    • Tailwater. The tailwater at the outfall shall be the higher of the river level beyond the gate, embankment or bund and the maximum level in the drain behind it, computed by routing the drain, with every lake, nambal and low ground that it fills, as a closed storage for as long as the gates are shut, with the inflow of the whole catchment that drains to it, its storage as surveyed in its present condition, net of silt, solid waste, weed and encroachment, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual). Pumps shall deliver against the design river level of this item, and every pump, panel, generator and control shall remain operable with the river at that level beyond the bund (Clause 5.12.5).
    • River lock. Mobile and portable dewatering pumps, among them the mobile units that Srinagar keeps for events (281 in 2026, as reported), and capacity that has been sanctioned or proposed but not commissioned, shall not be counted; they are a reserve for the failure of a station and for a breach. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the river stays above the closing stage of the item before last, taken from the river model or from the stage record of the nearest CWC gauge in the flood that set the highest recorded level (September 2014 at Ram Munshi Bagh, Sangam and Safapora; September 2025 at Khanabal) or in a comparable flood, and not less than 7 days (168 hours) (set by this Manual). The lock starts no later than the start of the storm and covers the whole of the 48- and 72-hour storms of Clause 5.10.2, so that storage and pumping handle the full storm volume (Clause 5.9.4), and the drawdown of Clause 5.10.5 is met by pumping until the lock ends. The check shall be run for both design cases of the valley floor in Clause 2.3.6(g)(ii), the summer convective storm and the long western-disturbance or snowmelt event of March and April, at AMC III (Clause 2.11.4), because the river can stand above flood-declaration stage in either season. A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where an analysis of the stage record of a CWC gauge under Clause 5.10.6 shows it and the Authority approves it.
    • Pumped capacity and the joint analysis. Every pumping station credited shall be stated by name, with its installed permanent capacity in cusecs and in m³/s, its largest pump, its duty point at the design river level, its sump levels, the river stage at which its gravity gate is shut, its standby power and its operator, on Form 5-1 and on the GIS drainage asset register (Clause 10.14.3). Station counts shall be cited with their dates and sources and never added together: about 56 storm-water pumping stations in Srinagar in 2015 (JTFRP environmental and social management framework); 89 drainage pumping stations, 38 lift, 21 gravity and 30 lift-cum-gravity, in February 2019 (Srinagar Master Plan 2035, Table 12-5); and 104 permanent dewatering stations of about 2,300 cusecs with 281 mobile units in February 2026 (H&UDD in the Legislative Assembly, as reported). Every DPR for drainage in Srinagar, or in another embanked town of the valley floor, shall include a joint drain–pump–river analysis: the drains and storages of the whole drainage zone, every pumping station with its pump curves and its sump and gate levels, and the Jhelum and the flood spill channel as a time-varying stage boundary, run for the lock of this item with the coincident cases of Clause 5.8.4; a project inside a zone may take its tailwater from that analysis once the Authority has accepted it (set by this Manual).
    • Breach and gate failure. A breach of the Jhelum's embankments, as in September 2014, when water stood up to 16 ft deep in parts of Srinagar and for up to 25 days in places (Alam et al., 2018, as cited by Malik, 2021), is a residual risk and not a design case for drains, storage or pumps, which cannot be sized for it. The designer shall report on Form 5-1, for every pumping station and for the buildings of every flood-sensitive catchment behind the embankment (Clause 4.5.3.2(a) to (c)), the depth with the land behind it filled to the highest recorded river level beyond it, and the means of evacuation and of restarting the station (set by this Manual). Floor levels and pumped outfalls behind a gate shall also be checked for the failure of the gate open, with the drain behind it filled to the river level beyond it.
  • (b) Other rivers. For an outfall to the Tawi, the Chenab, the Ujh, the Basantar, the Devak, the Ravi or another river, or to a tributary of the Jhelum above the valley floor, such as the Lidder, the Rambiara, the Romushi, the Doodhganga, the Vishow or the Sind, directly, through a gate or a pumping station, or into a drain that ends in one, the operator's data, tailwater routing, pump credit and gate-failure check of item (a) apply, with these levels:
    • Design river level. For the major-system cases, the 1% AEP river level at the outfall from a hydraulic model under Clause 5.8.2(b), with the releases of item (d), and not less than the highest recorded level at the nearest CWC gauge on the same river, transferred to the outfall. The levels found, all from SANDRP's copies of CWC data, with no datum stated [TBC], are: the Tawi at Jammu Tawi (Sidhra), a level-monitoring site, 321.1 m at 17:00 on 26 August 2025, above the 318.85 m of 6 September 2014; the Tawi at Kishanpur Manwal in Udhampur district, 442.65 m on 26 August 2025, above an undated 436.75 m; the Chenab at Akhnoor, a level-monitoring site, 324.29 m (10 September 1992); the Chenab at Prem Nagar in Doda district, 902.56 m (2025); the Neeru Nallah, 1,075.33 m, and the Kalnai, 932.7 m (2025); the Ravi at Basantpur, 318.35 m on 26 August 2025; the Lidder at Ganeshpura, 1,871.78 m (28 August 2016); and, in the Kashmir valley, Rumshi on the Romushi, 1,589.91 m (27 August 2025), the Rambiara at Watchi, 1,595.29 m (3 September 2025), and the Doodhganga at Kralpora, 1,594.3 m (2025). SANDRP counted fifteen breaches of a highest flood level in the Union Territory in the monsoon of 2025 and could not obtain the data of six sites (as reported), so a later level shall be sought from CWC for every gauge before design [TBC]. The level shall be transferred as item (a) provides, and on a mountain river, whose bed falls several metres in a kilometre, a profile of the flood marks of the same flood, surveyed between the gauge and the outfall and tied to a Survey of India benchmark, may be used in place of the unchanged level (set by this Manual).
    • Rivers and reaches with no gauge level. No CWC level was found for the Ujh at Kathua, the Basantar at Samba, the Devak at Udhampur, the Tawi in Udhampur town, or the Chenab at Kishtwar, Ramban or Reasi [TBC]. I&FC reports the Ujh at Panjtirthi in Kathua district by flow, with an alert at 48,000 cusecs and a danger mark at 88,000 cusecs against 59,750 cusecs in late August 2025, and the Tawi at Udhampur with an alert at 15 ft and a danger mark at 20 ft (also reported as 17 ft) against 24.975 ft on 26 August 2025 (as reported); no threshold was found for the Basantar. On such a reach, and for an outfall upstream of every gauge on its reach, the river level shall be the higher of the level from a model under Clause 5.8.2(b) and the highest flood level surveyed at the outfall from flood marks, including those of September 2014 and of August and September 2025, and from the records of I&FC, the local body or the Deputy Commissioner, with its source stated. Where a level is known only as a gauge reading, the designer shall tie the gauge zero to the project datum and a Survey of India benchmark by levelling. No outfall shall be designed on such a reach without one of these levels (set by this Manual).
    • 10% AEP level. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or a frequency analysis of the gauge record. The CWC sites in the Jammu division are level-monitoring sites with no danger level; there, the 10% AEP case shall use the design river level of this item until a frequency analysis is accepted (set by this Manual). The I&FC stages at Akhnoor, an alert at 32 ft and a danger mark at 35 ft, against 43 ft at 19:00 on 3 September 2025 and 61 ft in September 1992 (as reported), are named for the record and not converted to metres (item (a)).
    • The Tawi barrage. The pond level, the gates, the design flood and the operator of the Tawi barrage at Jammu, whose first phase was dedicated on 14 April 2026, were not found (as reported) [TBC]. An outfall to its pond is an outfall to a barrage pond under item (d); an outfall to the Tawi below it takes the releases of item (d).
    • Rivers that cross the border. The Tawi, the Basantar, the Ujh and the Chenab cross into Pakistan within about 10 to 30 km of Jammu, R.S. Pura, Samba and Akhnoor. No lowering of the river at an outfall shall be assumed on the ground of the channel below the border, whose levels are not available to the designer, and the downstream boundary of a model shall be set far enough below the outfall that it does not control the level there (set by this Manual).
    • No reduction. The river level shall not be reduced on the ground that the flood comes from rain that falls outside the town, from snow or glacier melt, or from the burst of a glacial or landslide lake, or that the site storm is small.
  • (c) Khads and nallahs. For an outfall to a khad or a nallah, such as the Balol, Thather and Bhalwal khads and the more than a hundred dry khads of the Kandi belt around Jammu, the khads of Samba, Kathua and Hiranagar, the nallahs and khads of Udhampur, Katra, Reasi, Ramban, Doda, Kishtwar, Rajouri and Poonch, the Telbal Nallah above the Dal, and the Doodhganga, Sukhnag, Rambiara, Vishow and Romushi nallahs above the valley towns, or into a drain that ends in one:
    • No gauge. None of these streams has a published flood level at a town, except the Neeru and the Kalnai nallahs of item (b), and the I&FC gauges on the Vishow at Khudwani (danger 7.75 m) and the Rambiara at Wachi (warning 5.4 m) read from local zeros (as reported) [TBC]. They are seasonal, steep and boulder-laden: the Kandi's ravines are "transformed into gushing torrents" (Jammu Master Plan 2032, §2.4); they rise within an hour of a burst of rain, lose part of their flow into the gravels of the Kandi fans, carry gravel, boulders, timber and debris, and raise or scour their beds in a single flood.
    • Design level. The tailwater for the major-system and storage cases shall be the highest of: (i) the 1% AEP level at the outfall from a study of the stream, made with a hydrograph method of Chapter 3 for the whole catchment above the outfall, with the rainfall of its sub-area in Annex 2A, the AMC of Clause 3.8.4 and the bulking factor of Clause 6.3.6(b) on the peak flow, and routed through a hydraulic model (Clause 5.8.2(b)) of the channel as surveyed, with the crossings downstream blocked as Clause 6.3.6(c) requires, and with no credit for flow lost into the gravels; (ii) the level at the outfall of any flood study of the stream made by or for I&FC, where it gives one [TBC]; and (iii) the highest flood level surveyed at the outfall from flood marks, such as debris lines, silt and scour marks and the accounts of residents, of the floods of September 2014 and of August and September 2025 or a later flood, and from the records of I&FC, the local body or the Deputy Commissioner, with its source stated. No outfall to such a stream shall be designed without items (i) and (iii) (set by this Manual).
    • Bed level, scour and aggradation. The designer shall survey the bed of the stream at the outfall and for at least 100 m upstream and downstream, and state the range within which the bed has moved, from past surveys, cross-sections, exposed foundations and pipes, and the records of I&FC and the local body. The outfall invert, and the seat of any flap gate on it, shall stand at least 0.5 m above the highest bed level found in that range within 50 m downstream of the outfall, and the foundation of the outfall structure and its apron shall be taken below the scour depth computed under Chapter 9 (Clause 9.6) for the 1% AEP flow with the bulking factor (set by this Manual).
    • Siting. An outfall shall be built into the bank and shall not project into the bed or the active channel, taken for this Manual as the land flooded once in 5 years (set by this Manual). It shall discharge in the direction of the stream's flow, with the bank protection that Chapter 9 requires, and no pipe, interceptor or chamber of the drainage system shall be laid along the bed of the stream. No outfall structure, pumping station or storage shall be built on land recorded as Gair Mumkin Khad, or released from that class, within the functional khad and corridor of Clause 6.9 (Chapter 6). No muck, spoil or excavated material from the works shall be placed in the stream or where a storm can carry it into one (Clause 6.3.6(g)).
    • Closed outfall. Where the outfall invert is below the design level of this item, the outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the level of the stream, computed under item (i) for the coincident cases of Clause 5.8.4, stays above the invert, and, where no hydrograph of the stream has been computed, for the whole storm (Clause 5.9.4) (set by this Manual). Where the khad or nallah itself ends at a gated or pumped outfall to the Jhelum, the lock of item (a) applies to it.
    • Interceptors. An interception and diversion structure on a khad or nallah or its drains (Clause 8.9) shall not raise the design level of this item or reduce the capacity of the drain; it shall stand above that level or be designed to be overtopped without damage.
  • (d) Reservoirs and barrages. For an outfall to a reservoir or barrage pond, directly or through a drain, khad or nallah that ends in it, such as the reservoirs of the Salal dam in Reasi district, the Baglihar dam in Ramban district and the Dul Hasti dam in Kishtwar district on the Chenab, the reservoir of the Ranjit Sagar dam on the Ravi along the Kathua border, and the pond of the Tawi barrage at Jammu:
    • Consent. Storm water shall not be discharged to a reservoir or barrage pond without the written consent of its custodian: NHPC for Salal and Dul Hasti, JKSPDC for Baglihar, the operator of the Ranjit Sagar dam in Punjab, and, for the Tawi barrage, the body that operates it, which was not confirmed during research [TBC]. The Ratle project on the Chenab and the Pakal Dul project on the Marusudar are under construction; when they are filled, this item applies to them. An outfall that carries dry-weather flow is dealt with under Clause 8.9.
    • Design level. The tailwater for the major-system and storage cases shall be the waterbody's maximum water level (MWL) as its custodian publishes it, or, where only the full reservoir level (FRL) or maximum pond level is published, FRL plus the surcharge in its design flood, computed from the rating of its spillway and gates with the gates operated only as the custodian's written rule provides. Where neither the MWL nor the surcharge has been published, or where the published MWL is not above the FRL, the tailwater is FRL + 0.5 m (set by this Manual) [TBC]. For a barrage pond, the tailwater is the higher of that level and the river level of item (b) at the barrage with its gates as operated. In every case it shall be not less than the highest level recorded at the waterbody. The minor-system tailwater is the FRL or maximum pond level, or the level at which the custodian's rule opens the gates if that is higher. The project's discharge shall be included in the level (Clauses 5.3.2 and 5.12.3).
    • The named reservoirs. Until the custodian confirms the MWL or the design-flood level and its datum, the tailwaters are (set by this Manual) [TBC]: Salal, FRL 487.68 m (as reported), with no MWL found: 488.18 m; Baglihar, FRL 840 m (as reported), whose maximum design flood level is quoted as "lowered from EL 841.5 m to EL 840.0 m" in a letter of 13 July 2002 reproduced in a party's submission to an international arbitration (as quoted), so that the published MWL is not above the FRL: 840.5 m; and Ranjit Sagar, whose FRL is given as 527.91 m ("1,731.5 feet", which is 527.76 m) and elsewhere as 527.13 m (as reported), a conflict that only its operator can resolve: 528.41 m, from the highest. No level on a stated datum was found for Dul Hasti or the Tawi barrage [TBC]; no outfall to either shall be designed without the custodian's FRL or pond level and spillway rating in writing, or, until the custodian gives them, the higher of a survey of the spillway or gate crest tied to a Survey of India benchmark and the river level of item (b) (set by this Manual).
    • Closed outfall. Where the outfall invert is below the design level of this item, the outfall shall be treated as closed for the whole storm (Clause 5.9.4), with storage and pumping handling the full storm volume, unless the custodian's stage record shows the waterbody below the invert at the start of comparable storms and the Authority accepts it. Every reservoir and barrage pond starts every design storm at its FRL or maximum pond level (Clause 7.7.3), and no lowering of a reservoir or pond before a storm and no early or additional gate opening shall be assumed unless the custodian's written operating rule and records show it. The drawdown zone of a reservoir, such as the pondage band of 836 m to 840 m at Baglihar (as reported), is part of the reservoir: no outfall structure, pumping station or storage shall be built in it without the custodian's consent.
    • Rivers below dams and barrages. For an outfall to a river below a dam or barrage, such as the Chenab below Salal at Akhnoor, the Chenab below Dul Hasti and Baglihar, and the Tawi below the Tawi barrage, in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) shall be run with the river at the level that results from the largest recorded release of the dams and barrages above, routed to the outfall, with the flow of the catchment below them as it occurred in the same event, and with the release placed before, during and after the site storm (set by this Manual), until the operator publishes an operating rule that bounds the release [TBC]. The releases found are reported only: the gates of Salal are opened at least once a month in the monsoon to flush its silt, passing about 4,250 m³/s (an NHPC tender, as reported), and were all opened on 12 August 2025; all the spillways of Baglihar were opened on 1 August 2025; and the outflow from Ranjit Sagar rose from 9,000 to 173,000 cusecs (about 255 to 4,900 m³/s) between 24 and 27 August 2025 (all as reported). The largest recorded release of each dam and barrage and its duration shall be obtained from its operator and stated [TBC]. A release, or a release rule, alone shall not be taken to bound the river level: the level shall also be checked for the largest recorded event at the nearest gauge, with the local inflows as they occurred. No attenuation by the storage of any reservoir shall be credited to the river below unless the operator's written rule commits that storage to flood control for the event, and no dam or barrage gate shall be assumed to open earlier or wider than the operator's records show.
    • Releases without notice. Since April 2025 the Indus Waters Treaty has been held in abeyance, and the releases and flushing of the dams in the Union Territory are reported to be no longer notified downstream (as reported). The Treaty bears on drainage design only through this: no outfall design shall depend on notice of a release or of a flushing, a flushing of Baglihar or Salal shall be assumed possible at any time in the monsoon, with the sediment it carries to outfalls below (Clause 5.11.3(b)), and the release cases of the previous item apply whether or not a release is announced (set by this Manual).
  • (e) Lakes and wetlands. For an outfall to the Dal, Nigeen, Brari Nambal, Khushalsar, Gilsar, Anchar, Hokersar, Nambal Narkur (Narkara), Shallabugh, Hygam, the Wular, Manasbal or Mansar–Surinsar, or another sar (lake), nambal (marsh) or talab, directly or through a drain or stream that ends in it:
    • Consent. Storm water shall not be discharged to a lake or wetland without the written consent of its custodian: LCMA for the Dal and Nigeen, WUCMA for the Wular and its feeder channels, the Wildlife Department for a wetland conservation reserve, among them Hokersar, Shallabugh, Hygam, Freshkoori, Kranchoo, Chatlam and Manibugh, and, for a Ramsar site (the Wular, Hokersar, Hygam, Shallabugh and Surinsar–Mansar), also the J&K Wetland Authority. No wetland was found notified under rule 4 of the Wetlands (Conservation and Management) Rules 2017 [TBC]. The custodian of the other lakes and nambals was not confirmed during research [TBC]; until the Union Territory names one, the consent of I&FC and of the local body is required (Chapter 7). LCMA's NOC is already part of building permission (S.O. 304 of 1 December 2025).
    • Outlets shut by the river. The Dal drains through two regulated outlets: the Dal Gate, a lock and weir to the Tsunth Kol and so to the Jhelum, and Nallah Amir Khan, to Nigeen and on through Gilsar and Khushalsar to Anchar (JKPCC, NGT O.A. 504/2024). A lake or nambal whose outlet the Jhelum backs up or shuts, as it shuts the Dal Gate, shall be routed as a closed storage for the whole river lock of item (a), with the inflow of its whole catchment (about 314 km² for the Dal) and with its outlet open only while the operator's written rule and the river level allow (set by this Manual).
    • Design level. No outlet, spill or gate level on a stated datum was found for any lake or nambal [TBC]; the Dal's reported level of "10.5 feet" (September 2025) is a gauge reading with an unknown zero and shall not be used as a level. Until the custodian gives one, the tailwater is the level at which the waterbody spills, from its outlet or spill crest surveyed and tied to a Survey of India benchmark, plus the head over that crest needed to pass the 1% AEP inflow, and not less than the highest level recorded at it; for the Wular it shall be not less than 1,578 m (item (a)). The waterbody starts every design storm at its spill level, and an outfall below the tailwater is closed for the whole storm (Clause 5.9.4) (set by this Manual).
    • Flood-absorption marshes. Hokersar, Nambal Narkur, Shallabugh, Anchar and the Rakh-e-Arth basin store the Jhelum's floods. No flood-storage volume has been published for any of them [TBC], and no storage in a marsh or low ground shall be credited to a drain unless its custodian's records show the storage free at the start of a storm. No drain shall be diverted so that it bypasses a flood-absorption marsh, no outfall structure, fill or embankment shall be built in one without its custodian's consent, and the regulatory gates proposed at Hokersar (as reported) shall be taken as closed in a storm unless a written operating rule says otherwise (set by this Manual).
    • Sediment and sewage. Every drain that discharges to a lake or wetland shall pass a sediment trap and a gross-pollutant screen (Chapter 8), and its dry-weather flow shall be intercepted (Clause 8.9) before it reaches the waterbody (set by this Manual): JKPCC has reported that "Untreated sewage gets entry into the Dal Lake from areas like Telbal, Lalbazar" (NGT O.A. 504/2024). No runoff shall be infiltrated on the valley floor around a lake (Clause 4.11), and no drain shall discharge into a spring (nāg) or its pool.
  • (f) Canals, city channels and khuls. Storm water shall not be discharged to a canal of I&FC, among them the Ranbir and Sindh canals; to a city channel, among them the Tsunth Kol and the Padshahi Canal; to the flood spill channel; or to a zamindari khul (a village irrigation channel, counted among hydraulic works by the Water Resources Act 2010) without the written consent of I&FC, which controls the bed and banks of all water sources, "city channels and flood spill channels" (s.81 of the Act [TBC on the section number]); nor to a drain of another body, such as a drain of SMC, JMC, a Municipal Council or Municipal Committee, UEED, SDA, JDA, LCMA, a Smart City company, the Public Works (R&B) Department or NHAI, without the written consent of that body. The Act forbids the deposit of "any material or waste in or near any channel" (s.73 [TBC]). A drain that crosses a canal or khul shall cross by a cross-drainage work built with the consent of its manager, and not discharge into it. The flood spill channel takes its water from the Jhelum at Padshahi Bagh and stands high when the Jhelum does, so an outfall to it is a Jhelum outfall under item (a); its carrying capacity shall be taken as the 4,000 cusecs to which, by the audit of 2016, sediment had reduced a design capacity of 17,000 cusecs (CAG, Report No. 4 of 2016, §2.1.4), until I&FC confirms a later capacity in writing, because the later figures reported (8,000, 8,700 and 27,000 cusecs) conflict (as reported) [TBC]. Where consent is given:
    • the discharge shall not exceed the rate the consent allows;
    • the tailwater is the higher of the channel's design water level as its owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives, including the drains of other bodies and the runoff that a khul intercepts from the slope above it, and with its downstream boundary at the river, khad, reservoir or lake level of items (a) to (e); until a design water level is published for a channel, the computed level governs [TBC];
    • the channel shall be taken in its present condition, net of silt, boulders, solid waste, weed, encroachment and obstruction by crossing services and culverts, with its narrowest section as surveyed; a widening, dredging or new channel that has been proposed but not completed, such as the supplementary flood spill channel from Dogripora to the Wular "designed for 55,000 Cusecs" that I&FC has "conceived" (Srinagar Master Plan 2035, §14.4.4.2) or the works of the second phase of the flood management plan for the Jhelum, shall not be counted; and
    • the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert.
  • (g) I&FC consent; plan, wetland and court lines. No outfall structure, gate, pumping station or drain shall be built in the bed, bank or floodplain of a river, khad or nallah, in or on an embankment, or in the flood spill channel, a city channel, a canal or a khul, without the consent of I&FC, or of the operator of a dam, reservoir or barrage for its structures. The Water Resources Act 2010 requires permission to build "in the vicinity of any irrigation or hydraulic work" (s.66) and forbids any building, railing or platform on the slopes of an embankment without it (s.81(4)) [TBC on the section numbers]; S.O. 304 of 1 December 2025 brings the NOCs of I&FC and of Sewerage & Drainage into online building permission; the procedure for an outfall consent was not found during research [TBC]. Neither the Flood Plain Zones Act 2005 nor Part VI of the Water Resources Act 2010 has been used, and no flood zone or flood basin is notified (Chapter 7). The designer shall also check the outfall against the lines that the building rules, the master plans, the wetland rules and the courts have set, as they stand at the time of design (Chapter 7): the 50 m, 30 m and 20 m from the edge of the bank of UBBL-2021, cl. 7.12(b), and the 30 m green buffer from the highest water level of cl. 5.2.5; the buffers of the Srinagar Master Plan 2035 (Tables 8-2 and 8-3, §8.2.3) and of the Jammu Master Plan 2032 (§7.3.3); the 200 m around the Dal held by the High Court (PIL 159/2002) and around the Wular (November 2020, as reported), and the 200 m that LCMA applies at Nigeen; the Ramsar sites and the wetland conservation reserves; and the orders of the High Court in PIL 8/2017, that the original width of the Jhelum be restored and that no construction be raised near the water bodies (as quoted in its order of 29 May 2024). Whether a drain outfall is permitted within each line is to be confirmed with the authority concerned before design [TBC].

No pump, gate, lock or dam operation that helps drainage, such as pumping a drain or the Dal down before a storm, lowering a reservoir or barrage pond before a storm, closing a gate late or opening dam or barrage gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the waterbody or the river (Clause 5.12.3). Pumping shall not be used to move water into a lake, a nambal, a reservoir, a khul or another catchment without the consent of its custodian, or onto a slope.

Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Jammu and Kashmir's rivers break that assumption, because the storms that fill them fall on the towns in the same spell. On 3–6 September 2014, when monsoon moisture met a western trough, Qazigund recorded 599.8 mm and Kokernag 415.2 mm in four days, Katra 698.6 mm in 72 hours and Jammu 218.3 mm on the last day (Ray et al., 2015); the Jhelum set its highest levels at Sangam on 4 September and at Ram Munshi Bagh on 8 September, and the Tawi at Sidhra on 6 September, while the towns' own drains were still full (CWC data, as copied by SANDRP). In the 24 hours to 08:30 on 27 August 2025 Jammu recorded 380 mm and Udhampur 630 mm (IMD), and the Tawi at Sidhra reached its highest recorded level, 321.1 m, at 17:00 on 26 August (CWC data, as copied by SANDRP). The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.

Clause 5.8.3 reflects the dams above and beside the Union Territory's towns. On the Chenab, Salal in Reasi district (NHPC) has a full reservoir level of 487.68 m and a spillway of twelve bays rated at 22,427 m³/s, and its gates are opened at least once a month in the monsoon to flush its silt, passing about 4,250 m³/s (an NHPC tender, as reported); it was flushed in May 2025 and all its gates were opened on 12 August 2025 (as reported). Baglihar in Ramban district (JKSPDC) has a full reservoir level of 840 m and a pondage band of 836 m to 840 m (as reported); its maximum design flood level is quoted as "lowered from EL 841.5 m to EL 840.0 m" in a letter of 13 July 2002 reproduced in a party's submission to an international arbitration (as quoted), and all its spillways were opened on 1 August 2025 (as reported). A press account of Baglihar's gates opening at a reservoir level of 893 m is inconsistent with that full level and is not used. No full or maximum level was found for Dul Hasti in Kishtwar district (NHPC), whose spillway is reported at 8,000 m³/s (as reported) [TBC]; Ratle, whose pondage is given as 1,015.86 m to 1,029.0 m (as quoted), and Pakal Dul on the Marusudar are under construction. On the Ravi, the Ranjit Sagar dam on the Punjab border of Kathua district has a full level given as 527.91 m and elsewhere as 527.13 m (as reported), a conflict that only its operator can resolve [TBC]; it reached its full level on 27 August 2025, when its outflow rose from 9,000 to 173,000 cusecs over 24–27 August (as reported). No level, gate or operating rule was found for the Tawi barrage at Jammu [TBC]. Since April 2025 the Indus Waters Treaty has been held in abeyance and the releases of the dams are reported to be no longer notified downstream; in August 2025 a warning of a high flood in the Tawi was passed to Pakistan through the High Commission rather than through the Indus Commission (as reported). That changes nothing in the design of a town drain except that no outfall below a dam can rely on notice of a release or a flushing (Clause 5.8.5(d)). No operating rule or release record for any of these dams, and no hourly stage record for any gauge in the Union Territory, was obtained during research [TBC]. Until they are available, the largest recorded release applies, with the flow of the catchment below the dam as it occurred in the same event (Clause 5.8.5(d)). The river levels used in this Manual come from SANDRP's copies of CWC data, because the CWC flood-forecasting portal could not be reached during research; their datum and gauge zero are to be confirmed with CWC [TBC].

Clause 5.8.5 is set by this Manual. In Jammu and Kashmir the tailwater at a town outfall is set not by the tide but by the Jhelum held above the valley floor by its embankments, by another river held high by a storm or by the releases of a dam, by a khad or nallah whose level no one has recorded and whose bed moves, by a reservoir at its full level, by a lake or nambal whose outlet the river shuts, or by a canal or city channel, and no document found during research gives a design level for any of them. No design standard for any town drain was found: the Drainage Master Plan and DPR for Srinagar publishes no return period (as reported), the Srinagar Master Plan 2035 sets "stormwater performance standards" of 100% coverage and zero waterlogging without a design storm (§13.3), and the Jammu Master Plan 2032 leaves the storm-water DPR to be prepared after its approval (§11.1.3). The drainage sections of the Jammu and Kashmir Municipal Corporation Act 2000 and Municipal Act 2000 were not read [TBC]. The Union Territory has two statutes for flood zoning, the Flood Plain Zones Act 2005 and Part VI of the Water Resources Act 2010, and neither has been used: the first is not shown to be in force, and no flood basin has been notified under the second (Chapter 7).

The first is the Jhelum, and item (a) is the governing case for every drain on the valley floor whose outfall the river can close. Srinagar's own rain in September 2014, about 140 to 152 mm in four days, would not have flooded the city; the river did (Ray et al., 2015). Item (a) therefore takes the outfall as shut from the river stage, not from the storm. It uses the I&FC flood-declaration stage, 18 ft at Ram Munshi Bagh, the stage at which I&FC declares a flood, as the stage from which the gravity outfalls are shut and the city depends on its pumps (a NEER reading; the stage at which each gate is actually shut is to be obtained from its operator [TBC]); the river passes that stage often: it stood at 21.10 ft at Ram Munshi Bagh in August 2025 and at 19.07 ft in July 2026 (as reported). The CWC danger level is the floor of the minor-system and 10% AEP cases for the same reason, and the highest recorded level is the floor of the 1% AEP case, as in the other mountain editions. Where the lists of 2018 and 2022 give different highest levels for the same flood at the same gauge, item (a) takes the higher until CWC confirms the level, because a tailwater set too low floods the town while one set too high only costs storage; the danger levels are thresholds that CWC itself revised, so the later list applies to them. Item (a) never converts an I&FC reading in feet to metres, because the gauge zeros are not published and the two systems do not agree: the CWC highest level at Ram Munshi Bagh stands 10.5 ft above its danger level, and the I&FC peak of 2014 is reported 8.5 ft above its own.

The lock of at least 7 days is set from the way the Jhelum floods. In September 2014 the rain fell from 3 to 6 September, and the river set its highest levels at Sangam on 4 September, at Ram Munshi Bagh on 8 September and at Safapora on 9 September (CWC data, as copied by SANDRP): the crest took about five days to pass down the valley, and Srinagar's outfalls stayed shut after the rain had stopped. In 2025 the river rose twice at Khanabal, to a new highest level on 27 August and to a higher one on 3 September (as reported), so a second storm can arrive before the first has drained. The valley drains slowly: its outlet through the Wular at Ningli is reported to carry about 22,700 cusecs, and Sopore about 35,000, against a peak at Sangam in 2014 reported to have exceeded 115,000 cusecs (as reported). Seven days covers the 72-hour storm of Clause 5.10.2 with four days of drawdown, and a designer with the stage record of a CWC gauge can justify a longer or shorter lock under Clause 5.10.6. The inundation of up to 25 days in parts of Srinagar in 2014 (Alam et al., 2018, as cited by Malik, 2021) came from the breach of the embankments, not from the closure of the outfalls; a lock of 25 days would size every drain and pump for the breach, which no drain can be sized for. Item (a) therefore treats the breach as a residual risk to be reported and planned for, not as the design case.

Item (a) counts only the permanent pumps less the largest one, for the same reason that Clause 5.12.2(b) requires a standby pump, and does not count the mobile units, which are needed where a station fails or a breach floods the land. The whole city's pumped capacity is small against its area: about 2,300 cusecs (65 m³/s) for 767 km² is about 0.085 m³/s per km², or about 0.3 mm of rain an hour (a NEER reading of figures as reported), so a Srinagar drain is limited by storage and pumping, not by its pipe size, whenever the river is up, and its design cannot be checked one site at a time. That is why item (a) asks for a joint drain–pump–river analysis for every drainage DPR on the valley floor. The station counts are kept apart because they count different things on different dates: about 56 storm-water pumping stations in 2015, 89 drainage pumping stations of three kinds in 2019 (of which the Srinagar Master Plan 2035 calls 69 "permanent/temporary dewatering stations", a figure that is not the total), and 104 permanent dewatering stations with 281 mobile units in 2026 (as reported). The city centre is also flooded by its own rain: Lal Chowk, Budshah Chowk, Residence Road and M A Road were under water after 26.4 mm on 1 August 2019 (as reported), with the river low, which is a failure of the drains themselves (Chapter 6).

The second is the other rivers. Item (b) follows the interim river rule of the series' first mountain editions, Uttarakhand and Himachal Pradesh: the design level is the 1% AEP level, and never below the highest level recorded at the nearest CWC gauge. In the Jammu division every CWC site is a level-monitoring site with no danger level, and the Tawi at Sidhra rose 2.25 m above its level of 2014 on 26 August 2025 (CWC data, as copied by SANDRP), so a level taken from before 2025 is too low. The rivers of the Jammu division cross into Pakistan a short distance below Jammu, R.S. Pura, Samba and Akhnoor, and their levels there are not available to a designer; item (b) therefore asks for a model boundary far enough downstream not to control the level at the outfall, and assumes no lowering from the reach beyond the border.

The third is the khad and the nallah. Jammu's khads, the nallahs of the hill towns and the streams that come down to the valley floor are ungauged, and no flood study of any of them was found. Item (c) therefore requires the designer to make the study, with the bulking factor of Clause 6.3.6(b), and to survey the flood marks, and takes the higher. A khad's bed is not fixed: it rises with the boulders of one flood and is scoured by the next, so item (c) sets the invert at least 0.5 m above the highest bed level surveyed downstream, a margin set by this Manual for the aggradation that a boulder bed can show in a single flood, and takes the foundation below the computed scour. It keeps outfalls off land recorded as Gair Mumkin Khad within the functional khad, because the Jammu Master Plan 2032 proposes to release much of that land (§12.2.3), and a drain outfall built on it would fix the khad's edge where the plan has not yet surveyed it.

The fourth is the reservoir. A reservoir at its full level does not fall for the rest of the season but passes its inflow over its spillway, and its level rises above FRL by whatever head the flood needs. Item (d) therefore takes the MWL, or FRL plus the design-flood surcharge, and treats an outfall below it as closed for the whole storm, which is what Clause 5.9.4 already requires when the tailwater stays above the outfall. Where only a reservoir level is published, FRL + 0.5 m is set as the interim value: it is the freeboard that this Manual uses for floor levels (Clause 6.11.1), and it is a floor, not an estimate of the surcharge, which depends on the spillway and the flood [TBC]. At Baglihar the quoted maximum design flood level is the full level itself, so FRL + 0.5 m applies there too; at Ranjit Sagar item (d) takes the higher of the two full levels reported. Item (d) also runs the town storm with the river at the largest recorded release, because the rain that fills a reservoir and the rain on the town below come from the same spell (see the Commentary to Clause 5.8.4), and because since April 2025 the releases are reported to go unannounced: the Indus Waters Treaty matters to drainage design only in that a designer can no longer assume a warning (Clause 5.8.5(d)).

The fifth is the lake and the nambal. The Dal's outlets are regulated, and the Dal Gate shuts against the river, so item (e) routes a lake whose outlet the river shuts as a closed storage for the whole river lock. The marshes of the valley were the Jhelum's flood storage, and they have shrunk: the Wular from 157.74 km² to 86.71 km² between 1911 and 2007, by one account, and Hokersar from 18.75 km² to about 13 km² (as reported). No flood-storage volume was found for any of them, so item (e) gives no storage credit in a marsh unless its custodian's records show the storage free, and forbids drains that bypass a marsh, because a drain that bypasses one moves the marsh's storage onto the river. The sediment traps and the interception of dry-weather flow before every outfall to a lake reflect what JKPCC has reported: that only 62.01 of Srinagar's 193.34 MLD of sewage is treated (32.07%), and that untreated sewage enters the Dal from Telbal and Lal Bazar (NGT O.A. 504/2024).

The sixth is the canal, the city channel and the khul, and the seventh is the line within which an outfall may be built. The Water Resources Act 2010 puts the bed and banks of every water source, the city channels and the flood spill channels under I&FC [TBC on the section number], so item (f) asks for I&FC's consent for every outfall to them. The flood spill channel fills from the Jhelum, so item (f) treats an outfall to it as a Jhelum outfall, and takes its capacity at the 4,000 cusecs that the audit found, because the later figures conflict. Items (d) to (f) ask for the owner's consent and design level because a design that discharges to a channel, a reservoir or a lake cannot be checked without them. The lines of item (g) decide where an outfall can be built, not its level. The bye-laws measure from the edge of the bank and from the highest water level, the Srinagar plan from the edge of the water and the Jammu plan from the full tank level, and the courts add 200 m around the Dal and the Wular (Chapter 7); item (g) asks the designer to check each one as it stands.


5.9 Joint-probability cases

5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.

Table 5.2 — Joint-probability cases for tidal and riverine outfalls

Case Rainfall Tailwater Applies to Basis
J1 Minor-system design AEP, Tc to 24 h MHWS + SLA (tidal curve) Minor system Clause 2.12(a); Clause 5.7.1
J2 1% AEP, all durations of Clause 2.5.2 HAT + surge + SLA Major system, detention, tanks, pumped systems Clause 5.7.1
J3 10% AEP, 48 h 1% AEP still-water level + SLA Major system, detention, tanks, pumped systems Clause 2.12(b)
J4 Design AEP, 48 h (72 h reported) Tidal curve per J1 with two 6 h lock windows (Clause 5.10) All storage and every gated or tide-affected outfall Clause 5.10
R1 Site design AEP River at 10% AEP level Riverine outfalls Clause 5.8.4(a)
R2 Site 10% AEP River at design-AEP level Riverine outfalls Clause 5.8.4(b)

5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).

5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.

5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.

Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.


5.10 Outfall-closed (tide-locked) storage check

5.10.1 Where it applies. The check applies to:

  • every storage facility;
  • every minor- and major-system element; and
  • every pumped system

whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).

5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:

  • the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
  • AMC III.

The 72-hour storm shall also be run and reported.

5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:

  • (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
  • (b) During each lock window, gravity discharge is zero.
  • (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
  • (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.

5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:

  • (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
  • (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
  • (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.

In volume terms, over each lock window and the full storm:

V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)

This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).

5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).

5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:

  • sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
  • the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.

2026-10-31T11:03:55.142804 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 10 20 Rain (mm/h) 24 h design depth in final day (Clause 2.9.2) Illustrative — not design values. 48 h storm, peak day last; semi-diurnal tide −0.5 0.0 0.5 1.0 1.5 Level (m, local datum) Design lock 1 (6 h) Design lock 2 (6 h) MHWS + sea-level allowance (illustrative) Tailwater: astronomical tide + surge Astronomical tide only Drain / storage stage upstream of gate 0 6 12 18 24 30 36 42 48 54 60 Time from storm start (h) Flap gate shut

Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.

Commentary. The outfall-closed check is the distinctive Jammu and Kashmir requirement in this Manual. In Jammu and Kashmir it applies where an outfall is shut not by the tide but by the Jhelum, held above the floor of the Kashmir valley by its embankments, by another river in flood or below a dam, by a khad or nallah that has risen over the outlet or buried it in boulders, by a reservoir at its full level, or by a lake or nambal whose own outlet the river has shut. Once the Jhelum reaches its flood-declaration stage, the gravity outfalls of Srinagar are taken as shut and the city drains only by storage and pumping; its dewatering stations, 104 permanent stations of about 2,300 cusecs in 2026 (as reported), can lift only about 0.3 mm of rain an hour from the 767 km² of its drainage master plan (a NEER reading of figures as reported). In September 2014 the Jhelum crested at Sangam on 4 September, at Ram Munshi Bagh on 8 September and at Safapora on 9 September (CWC data, as copied by SANDRP), and in 2025 Khanabal set a highest level on 27 August and a higher one on 3 September (as reported). A river on the valley floor stays high for days after the rain ends, a reservoir or lake at its full level stays there for the rest of the season, and a khad in flood can block an outlet with boulders, which is why Clause 5.8.5 replaces the two 6-hour windows described below with a single river lock of at least 7 days on the Jhelum and closures for the whole storm at a reservoir, lake or khad outfall below its design level. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.

The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.

Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.


5.11 Flap gates, tide gates and non-return valves

5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.

5.11.2 Hydraulics. The design shall include:

  • the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
  • the reduction in effective outfall capacity when the gate is partly open.

Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.

5.11.3 Construction.

  • (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
  • (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
  • (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
  • (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
  • (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.

5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:

  • the major-system tailwater (J2) at the point of connection; or
  • the maximum stage in the outfall-closed check (Clause 5.10).

Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.

5.11.5 Inspection. Gates and valves shall be inspected and operated:

  • before 15 June each year;
  • after every event in which they closed against a storm flow; and
  • as set in the maintenance plan (Chapter 10).

Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Jammu and Kashmir the outfalls do not cross a beach, but many of them pass through a gate in the Jhelum's embankments or end in a river whose level is set by a dam upstream. The Srinagar Master Plan 2035 counts the city's 89 drainage pumping stations as 38 lift, 21 gravity and 30 lift-cum-gravity stations (February 2019), and a gravity station drains only while its gate is open; the Dal drains to the river through the Dal Gate, a lock and weir whose flood-gates, Grierson's dictionary records, close by themselves when the Jhelum rises (Grierson, A Dictionary of the Kashmiri Language, p. 210); regulatory gates at Hokersar are part of the second phase of the flood management plan for the Jhelum (as reported); and no pond level or gate rule of the Tawi barrage at Jammu, dedicated in April 2026, was found (as reported) [TBC]. On the Chenab all the spillways of Baglihar were opened on 1 August 2025 and all the gates of Salal on 12 August 2025, and since April 2025, with the Indus Waters Treaty held in abeyance, releases from the dams are reported to go unannounced downstream (as reported). In September 2014 the Jhelum's embankments were breached in Srinagar; the locations and dates of the breaches were not found during research [TBC]. A gate jammed open lets the river into the drains; a gate held shut by silt turns a gravity outfall into a dead end; a dam gate opened in a hurry raises the river below. The embankments and the gates in them, the pumping stations and the drains behind them belong to different bodies: I&FC holds the river and its embankments, UEED and the Town Drainage wings of SMC and DULBK the drainage schemes and stations, LCMA the Dal, and NHPC and JKSPDC the dams; no rule linking the operation of any of these gates to the levels of the drains was found during research [TBC]. The 15 June inspection date is set ahead of the SW monsoon.


5.12 Pumped outfalls

5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:

  • the outfall-closed check of Clause 5.10;
  • the drawdown requirement of Clause 4.7; or
  • the J2 and J3 cases.

Pumping shall not be used where a gravity solution meets these requirements.

5.12.2 Capacity.

  • (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
  • (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
  • (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.

5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.

5.12.4 Power supply. Pumping stations shall have either:

  • two independent power supplies; or
  • standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.

Changeover shall be automatic.

5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:

  • the 1% AEP flood level + 0.5 m; and
  • HAT + surge + SLA + 0.5 m.

Access to the station shall remain usable in the 1% AEP event.

5.12.6 Discharge arrangement. Rising mains shall discharge:

  • over a level above the J2 tailwater; or
  • through a non-return valve and a flap gate.

The arrangement shall prevent back-siphoning.

5.12.7 Controls and monitoring. Each station shall have:

  • automatic level control;
  • remote alarms for high level, pump failure and power failure, sent to the operator; and
  • a level and run-time log kept for at least 5 years.

Wet wells shall be sized to keep pump starts within the manufacturer's limits.

5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).

5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 15 June each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).

Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.


5.13 Sand-bar closure of river mouths

5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Jammu and Kashmir: Clause 5.1.4), and any other mouth listed in Annex 5B.

5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless I&FC certifies that:

  • a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
  • the programme is funded for the current season.

5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:

  • (a) the tidal tailwater of Clause 5.7; and
  • (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.

5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless I&FC has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.

5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.

Commentary. Jammu and Kashmir has no coast and no river mouth, so Clause 5.13 does not apply in the Union Territory (Clause 5.1.4). Its nearest inland counterparts are the silt, gravel and boulders that its rivers, khads and lakes leave at an outfall or a gate. The flood spill channel of the Jhelum, built for 17,000 cusecs, had been reduced to 4,000 cusecs "due to accumulation of sediment load from various nallahs which merge with the channel" (CAG, Report No. 4 of 2016, §2.1.4); the Wular is reported to have lost about 30% of its volume to silt in three decades, and releases from the Dal are reported to be possible "only to the extent of two to three feet" because of silt (as reported); the first phase of the flood management works on the Jhelum removed about 35 lakh m³ of sediment (as reported); and the gates of Salal are opened in the monsoon to flush its silt into the Chenab (as reported). Brari Nambal lost its outlet, the Mar Canal, when the canal was filled in the 1970s (as reported). A flap gate held open or shut by silt or gravel, an outlet buried by a rising bed or left hanging by scour, or a gate that cannot be moved, turns a designed outfall into a dead end or a back-flow path. No written gate-operation rule for the gates of any dam, barrage, lake outlet or dewatering station in the Union Territory was found during research [TBC]. Clause 5.8.5 deals with both by setting outfalls above the range of bed movement and by giving no credit for a gate operation or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.


5.14 Documentation

Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:

  1. a plan of the analysis extent showing:
    • the site;
    • each analysis point with its contributing catchment area and the site's percentage of it; and
    • the end point and the reason it was chosen (Clause 5.3);
  2. the model description:
    • software and version;
    • the network schematic, with survey sources for the drains and crossings;
    • land use and CN for off-site areas;
    • any upstream detention included; and
    • calibration or validation evidence where available;
  3. for each analysis point, AEP and duration, the existing and with-project:
    • peak flow;
    • time to peak;
    • maximum water level and velocity; and
    • duration of inundation (Clause 5.4);
  4. the comparison against Clause 5.5, with each failure identified and the remedy adopted;
  5. the tailwater derivation:
    • tide-table edition and port;
    • MHWS, HAT and MSL relative to chart datum;
    • the datum connection to the Survey of India benchmark and the project datum;
    • surge source and value;
    • SLA; and
    • river levels and their sources (Clauses 5.6 to 5.8);
  6. the joint-case table of Clause 5.9 with results;
  7. the outfall-closed check (Clause 5.10):
    • storm and lock alignment;
    • stage hydrographs; and
    • the volume balance for each lock window;
  8. a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
  9. pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
  10. the sand-bar assumption and supporting I&FC certification, where relevant (Clause 5.13); and
  11. inspection and maintenance requirements for Chapter 10.

Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.


References (chapter)

Annexes and forms

Annex / Form Content
5A Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
5B Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
5C Worked example: outfall-closed check for a site on a khad draining to the Tawi in Jammu
Form 5-1 Downstream and Tailwater Report
Form 5-2 Simplified Downstream Statement (small sites)